Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-43808
Well Classification: OW Status: PR - 10/1/2022
Well Name/No:BABCOCK #19N-33HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/1/2022
FacilityID:448222LocationID:330811
Municipality/County:FIRESTONE / WELD #123Location:SENW 4 2N67W 6
Field:WATTENBERG - #90750Elevation:4886 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2138FNL  2040 FWLLat/Long: 40.169183 / -104.897105Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.169184 / -104.897107Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/25/2017
End Date: 12/1/2017
Reported: 1/19/2018
Days to report: 49
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 10/1/2022             Measured TD: 12186 ft.    Vertical TD: 7166 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 10/1/2022
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:10/30/2018
Proposed Top PZ Location:Sec:4 Twp: 2N 67W Footage: 2341 FNL  1208 FWL
Bottom Hole Location:Sec:33 Twp: 3N 67W Footage: 2160 FSL  1192 FWL
Proposed Depth/Form:12205 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42.1 , Citings Type: PLANNED
Cement:Sacks: 30, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1800 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 710, Top: 0 ft., Bottom: 1800 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 12195 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1425, Top: , Bottom: 12195 ft.

Wellbore Completed
Completion Date:6/12/2017
Spud Date:4/20/2017Spud Date Is:ACTUAL
Measured TD:12186 ft.Measured PB depth:12084 ft.
True Vertical TD:7166 ft.True Vertical PB depth:7171 ft.
Top PZ Location:Sec:4 Twp: 2N 67WFootage: 2341 FNL  1197 FWL
Bottom Hole Location:Sec:33 Twp: 3N 67WFootage: 2146 FSL  1168 FWL
Log Types:CBL, MWD, (CNL in 123-43809, RESISTIVITY in 123-19671)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 101 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 101 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1873 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 727, Top: 0 ft., Bottom: 1873 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 12178 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1220, Top: 1155 ft., Bottom: 12178 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4687 ft.
SHANNON4750 ft.
SHARON SPRINGS7316 ft.
NIOBRARA7465 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 10/1/2022                 Interval Top: 7710 ft.    Interval Bottom: 12076 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:12/21/2017Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/21/2017Treatment End Date:12/1/2017
Treatment Summary:COMPLETED THROUGH AN OPEN HOLE LINER FROM 7710-12076. 527 BBL 7.5% HCL ACID, 5,598 BBL PUMP DOWN, 151,842 BBL SLICKWATER, 157,966 TOTAL FLUID, 1,316,020# 40/70 OTTAWA/ST. PETERS, 1,316,020# TOTAL SAND.
Total fluid used in treatment (bbls):157966Max pressure during treatment (psi):7622
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:41
Total acid used in treatment (bbls):527Min frac gradient (psi/ft):0.92
Recycled water used in treatment (bbls):2980Total flowback volume recovered (bbls):3806
Fresh water used in treatment (bbls):154459Disposition method For flowback:RECYCLE
Total proppant used (lbs):1316020Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/5/2018Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 204
BBLS_OIL 104
BTU_GAS 1282
CALC_BBLS_H2O 204
CALC_BBLS_OIL 104
CALC_GOR 1442
CALC_MCF_GAS 150
CASING_PRESS 2200
GRAVITY_OIL 54
MCF_GAS 150
Perforation Data:
Interval Top:7710 ft.# Of Holes:960
Interval Bottom:12076 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)1969
Total Gas Produced (MCF)54774
GOR27818
GOR DeterminationMCFE
Average BOE per Day31.274
Average MCFE per Day181.420

 Federal Financial Assurance  i 

 Tribal Well  i No