|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 10/1/2022 Measured TD: 12182 ft. Vertical TD: 7179 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 10/1/2022 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 10/30/2018 | Proposed Top PZ Location: | Sec:4 Twp: 2N 67W | Footage: 2342 FNL 2467 FWL | Bottom Hole Location: | Sec:33 Twp: 3N 67W | Footage: 2176 FSL 2459 FWL | Proposed Depth/Form: | 12197 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42.1 , Citings Type: PLANNED | Cement: | Sacks: 30, Top: 0 ft., Bottom: 40 ft. | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1800 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 710, Top: 0 ft., Bottom: 1800 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 12187 ft., Weight: 17 , Citings Type: PLANNED | Cement: | Sacks: 1424, Top: , Bottom: 12187 ft. |
| | |
Wellbore Completed | Completion Date: | 5/19/2017 | Spud Date: | 4/24/2017 | Spud Date Is: | ACTUAL | Measured TD: | 12182 ft. | Measured PB depth: | 12123 ft. | True Vertical TD: | 7179 ft. | True Vertical PB depth: | 7178 ft. | Top PZ Location: | Sec:4 Twp: 2N 67W | Footage: 2245 FNL 2468 FWL | Bottom Hole Location: | Sec:33 Twp: 3N 67W | Footage: 2154 FSL 2465 FWL | Log Types: | CBL, MWD, (CNL in 123-43809, RESISTIVITY in 123-19671) | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 92 ft., Weight: 42 , Citings Type: ACTUAL | Cement: | Sacks: 64, Top: 0 ft., Bottom: 92 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1872 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 727, Top: 0 ft., Bottom: 1872 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12172 ft., Weight: 17 , Citings Type: ACTUAL | Cement: | Sacks: 1575, Top: 595 ft., Bottom: 12172 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4681 ft. | | | | SHANNON | 4750 ft. | | | | SHARON SPRINGS | 7272 ft. | | | | NIOBRARA | 7423 ft. | | | |
Formation NBRR Formation Classification: OW Status: PR - 10/1/2022 Interval Top: 7749 ft. Interval Bottom: 12115 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 12/21/2017 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 10/27/2017 | Treatment End Date: | 11/23/2017 | Treatment Summary: | COMPLETED THROUGH AN OPEN HOLE LINER FROM 7749-12115. 505 BBL 7.5% HCL ACID, 152,338 BBL SLICKWATER, 6,878 BBL WATER, 159,721 TOTAL FLUID, 1,316,100# 40/70 OTTAWA/ST. PETERS, 1,316,100# TOTAL SAND. | Total fluid used in treatment (bbls): | 159721 | Max pressure during treatment (psi): | 7758 | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | Type Of gas: | | Number Of staged intervals: | 41 | Total acid used in treatment (bbls): | 505 | Min frac gradient (psi/ft): | 0.93 | Recycled water used in treatment (bbls): | 1650 | Total flowback volume recovered (bbls): | 3806 | Fresh water used in treatment (bbls): | 157566 | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 1316100 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 12/29/2017 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 272 | BBLS_OIL | 142 | BTU_GAS | 1282 | CALC_BBLS_H2O | 272 | CALC_BBLS_OIL | 142 | CALC_GOR | 1789 | CALC_MCF_GAS | 254 | CASING_PRESS | 1900 | GRAVITY_OIL | 54 | MCF_GAS | 254 |
| Perforation Data: | Interval Top: | 7749 ft. | # Of Holes: | 984 | Interval Bottom: | 12115 ft. | Hole Size: | 0.44 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 1364 |
Total Gas Produced (MCF) | 49118 |
GOR | 36010 |
GOR Determination | MCFE |
Average BOE per Day | 25.794 |
Average MCFE per Day | 149.623 |
Federal Financial Assurance | i | |
|
|