Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-43804
Well Classification: OW Status: PR - 10/1/2022
Well Name/No:BABCOCK #35C-33HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/1/2022
FacilityID:448218LocationID:330811
Municipality/County:FIRESTONE / WELD #123Location:SENW 4 2N67W 6
Field:WATTENBERG - #90750Elevation:4886 ft.
Planned Location:2138FNL  2055 FWLLat/Long: 40.169182 / -104.897052Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.169184 / -104.897052Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/24/2017
End Date: 11/26/2017
Reported: 1/9/2018
Days to report: 44
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 10/1/2022             Measured TD: 12402 ft.    Vertical TD: 7384 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 10/1/2022
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:10/30/2018
Proposed Top PZ Location:Sec:4 Twp: 2N 67W Footage: 2359 FNL  1360 FWL
Bottom Hole Location:Sec:33 Twp: 3N 67W Footage: 2166 FSL  1324 FWL
Proposed Depth/Form:12422 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 400, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42.1 , Citings Type: PLANNED
Cement:Sacks: 30, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1800 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 710, Top: 0 ft., Bottom: 1800 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 12412 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1452, Top: , Bottom: 12412 ft.

Wellbore Completed
Completion Date:6/6/2017
Spud Date:4/20/2017Spud Date Is:ACTUAL
Measured TD:12402 ft.Measured PB depth:12300 ft.
True Vertical TD:7384 ft.True Vertical PB depth:7384 ft.
Top PZ Location:Sec:4 Twp: 2N 67WFootage: 2359 FNL  1360 FWL
Bottom Hole Location:Sec:33 Twp: 3N 67WFootage: 2166 FSL  1324 FWL
Log Types:CBL, MWD, (CNL in 123-43809, RESISTIVITY in 123-19671)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 101 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 101 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1872 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 729, Top: 0 ft., Bottom: 1872 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 12392 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1240, Top: 1365 ft., Bottom: 12392 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4722 ft.
SHANNON4750 ft.
SHARON SPRINGS7258 ft.
NIOBRARA7350 ft.
FORT HAYS7769 ft.
CODELL8098 ft.
CARLILE8400 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 3/1/2018                  Interval Top: 8405 ft.    Interval Bottom: 12290 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/1/2018Treatment End Date:N/A
Treatment Summary:Carlile: 8405-8540, 10430-10630, 10637-10877, 12121-12290
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:8405 ft.# Of Holes:192
Interval Bottom:12290 ft.Hole Size:0.44 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 3/1/2018                  Interval Top: 8108 ft.    Interval Bottom: 12121 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/1/2018Treatment End Date:N/A
Treatment Summary:Codell: 8108-8405, 8540-10430, 10630-10637, 10877-12121
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8108 ft.# Of Holes:192
Interval Bottom:12121 ft.Hole Size:0.44 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 10/1/2022                 Interval Top: 7862 ft.    Interval Bottom: 12290 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:12/20/2017Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/24/2017Treatment End Date:11/26/2017
Treatment Summary:COMPLETED THROUGH AN OPEN HOLE LINER FROM 7862-12290. 48 BBL 7.5% HCL ACID, 1,252 BBL PUMP DOWN, 80,787 BBL SLICKWATER, 82,086 TOTAL FLUID, 2,457,398# 40/70 OTTAWA/ST. PETERS, 2,457,398# TOTAL SAND.
Total fluid used in treatment (bbls):82086Max pressure during treatment (psi):7275
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:10
Total acid used in treatment (bbls):48Min frac gradient (psi/ft):0.81
Recycled water used in treatment (bbls):750Total flowback volume recovered (bbls):3806
Fresh water used in treatment (bbls):81289Disposition method For flowback:RECYCLE
Total proppant used (lbs):2457398Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7560 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/19/2018Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 339
BBLS_OIL 194
BTU_GAS 1282
CALC_BBLS_H2O 339
CALC_BBLS_OIL 194
CALC_GOR 1103
CALC_MCF_GAS 214
CASING_PRESS 2025
GRAVITY_OIL 54
MCF_GAS 214
TUBING_PRESS 1191
Perforation Data:
Interval Top:7862 ft.# Of Holes:192
Interval Bottom:12290 ft.Hole Size:0.44 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 3/1/2018                  Interval Top: 7862 ft.    Interval Bottom: 8108 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/1/2018Treatment End Date:N/A
Treatment Summary:Fort Hays: 7862-8108
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:7862 ft.# Of Holes:192
Interval Bottom:8108 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
April 2024 - March 2025i
Total Oil Produced (Barrels)2866
Total Gas Produced (MCF)64814
GOR22614
GOR DeterminationMCFE
Average BOE per Day38.048
Average MCFE per Day220.659

 Federal Financial Assurance  i 

 Tribal Well  i No