Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-43802
Well Classification: OW Status: PA - 3/27/2024
Well Name/No:BABCOCK #14C-33HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date3/27/2024
FacilityID:448216LocationID:330811
Municipality/County:FIRESTONE / WELD #123Location:SENW 4 2N67W 6
Field:WATTENBERG - #90750Elevation:4886 ft.
Planned Location:2137FNL  2130 FWLLat/Long: 40.169181 / -104.896783Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.169181 / -104.896782Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/14/2017
End Date: 11/15/2017
Reported: 1/9/2018
Days to report: 55
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 3/27/2024             Measured TD: 12356 ft.    Vertical TD: 7378 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 3/27/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:10/30/2018
Proposed Top PZ Location:Sec:4 Twp: 2N 67W Footage: 2342 FNL  2168 FWL
Bottom Hole Location:Sec:33 Twp: 3N 67W Footage: 2176 FSL  2202 FWL
Proposed Depth/Form:12401 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42.1 , Citings Type: PLANNED
Cement:Sacks: 30, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1800 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 710, Top: 0 ft., Bottom: 1800 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 12391 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1449, Top: , Bottom: 12391 ft.

Wellbore Completed
Completion Date:5/25/2017
Spud Date:4/23/2017Spud Date Is:ACTUAL
Measured TD:12356 ft.Measured PB depth:12253 ft.
True Vertical TD:7378 ft.True Vertical PB depth:7377 ft.
Top PZ Location:Sec:4 Twp: 2N 67WFootage: 1792 FNL  2232 FWL
Bottom Hole Location:Sec:33 Twp: 3N 67WFootage: 2159 FSL  2242 FWL
Log Types:CBL, MWD, (CNL in 123-43809, RESISTIVITY in 123-19671)
Casing:String Type: CONDUCTOR, Hole Size: , Size: , Top: 0 ft., Depth: 100 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1882 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 731, Top: 0 ft., Bottom: 1882 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 12347 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1240, Top: 880 ft., Bottom: 12347 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4690 ft.
SHANNON4750 ft.
SHARON SPRINGS7203 ft.
NIOBRARA7326 ft.
FORT HAYS7766 ft.
CODELL7881 ft.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 2/26/2018                 Interval Top: 8770 ft.    Interval Bottom: 8829 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/26/2018Treatment End Date:N/A
Treatment Summary:Fort Hays: 8770-8829
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8770 ft.# Of Holes:168
Interval Bottom:8829 ft.Hole Size:0.44 in.

Formation CD-FH                   Formation Classification:  OW                   Status:  AB - 3/27/2024                 Interval Top: 8434 ft.    Interval Bottom: 12006 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:12/21/2017Choke Size: 
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/26/2017Treatment End Date:11/15/2017
Treatment Summary:PERF AND FRAC FROM 8434-12006. 133 BBL 7.5% HCL ACID, 65,254 BBL SLICKWATER, 1,388 BBL WATER, 66,776 TOTAL FLUID, 1,995,400# 40/70 OTTAWA/ST. PETERS, 1,995,400# TOTAL SAND.
Total fluid used in treatment (bbls):66776Max pressure during treatment (psi):6946
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:9
Total acid used in treatment (bbls):133Min frac gradient (psi/ft):0.75
Recycled water used in treatment (bbls):300Total flowback volume recovered (bbls):3806
Fresh water used in treatment (bbls):66343Disposition method For flowback:RECYCLE
Total proppant used (lbs):1995400Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/30/2017Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 100
BBLS_OIL 134
BTU_GAS 1282
CALC_BBLS_H2O 100
CALC_BBLS_OIL 134
CALC_GOR 1530
CALC_MCF_GAS 205
CASING_PRESS 1100
GRAVITY_OIL 54
MCF_GAS 205
Perforation Data:
Interval Top:8434 ft.# Of Holes:168
Interval Bottom:12006 ft.Hole Size:0.44 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 2/26/2018                 Interval Top: 8434 ft.    Interval Bottom: 12006 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/26/2018Treatment End Date:N/A
Treatment Summary:Codell: 8434-8770, 8829-12006
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:No
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8434 ft.# Of Holes:168
Interval Bottom:12006 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY03/27/2024
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2029
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
April 2024 - March 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No