|
|
|
|
Wellbore #00 Wellbore Classification: Status: PR - 10/15/2020 Measured TD: Wellbore Data for Original Wellbore | Wellbore Classification: PR - 10/15/2020 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 9/25/2021 | Proposed Top PZ Location: | Sec:31 Twp: 9N 59W | Footage: 920 FSL 2188 FEL | Bottom Hole Location: | Sec:32 Twp: 9N 59W | Footage: 920 FSL 460 FEL | Proposed Depth/Form: | 13684 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 535-734 , Unit Acreage: 960, Drill Unit: 31: E/2, 32: All | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 535-734 , Unit Acreage: 960, Drill Unit: S 31: E/2, S 32: All | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 43 , Citings Type: PLANNED | Cement: | Sacks: 50, Top: 0 ft., Bottom: 80 ft. | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1525 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 525, Top: 0 ft., Bottom: 1525 ft. | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 13684 ft., Weight: 20 , Citings Type: PLANNED | Cement: | Sacks: 2150, Top: , Bottom: 13684 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6535 ft., Depth: 13571 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 525, Top: 6535 ft., Bottom: 13571 ft. |
| | |
Wellbore Completed | Completion Date: | N/A | Spud Date: | 10/31/2019 | Spud Date Is: | NOTICE | Measured TD: | | Measured PB depth: | | True Vertical TD: | | True Vertical PB depth: | | Top PZ Location: | Sec:31 Twp: 9N 59W | Footage: 920 FSL 2188 FEL | Bottom Hole Location: | Sec:32 Twp: 9N 59W | Footage: 920 S 460 E | No formation data to display. |
Sidetrack #01 Wellbore Classification: OW Status: AB - 2/3/2022 Measured TD: 13652 ft. Vertical TD: 6295 ft. Wellbore Data for Sidetrack #01 | Wellbore Classification: OW AB - 2/3/2022 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 11/26/2021 | Proposed Top PZ Location: | Sec:31 Twp: 9N 59W | Footage: 920 FSL 2188 FEL | Bottom Hole Location: | Sec:32 Twp: 9N 59W | Footage: 920 FSL 460 FEL | Proposed Depth/Form: | 13684 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 535-734 , Unit Acreage: 960, Drill Unit: 31: E/2, 32: All | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 43 , Citings Type: PLANNED | Cement: | Sacks: 50, Top: 0 ft., Bottom: 80 ft. | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1582 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 550, Top: 0 ft., Bottom: 1595 ft. | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 13684 ft., Weight: 20 , Citings Type: PLANNED | Cement: | Sacks: 2150, Top: , Bottom: 13684 ft. |
| | |
Wellbore Completed | Completion Date: | 11/24/2019 | Spud Date: | 11/2/2019 | Spud Date Is: | ACTUAL | Measured TD: | 13652 ft. | Measured PB depth: | 13640 ft. | True Vertical TD: | 6295 ft. | True Vertical PB depth: | 6295 ft. | Top PZ Location: | Sec:31 Twp: 9N 59W | Footage: 1010 FSL 2188 FEL | Bottom Hole Location: | Sec:32 Twp: 9N 59W | Footage: 1039 S 467 E | Log Types: | CBL, MWD, Mud, Res run API: 05-123-43670 | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 94 ft., Weight: 43 , Citings Type: ACTUAL | Cement: | Sacks: 60, Top: 0 ft., Bottom: 94 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1582 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 550, Top: 0 ft., Bottom: 1582 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 13640 ft., Weight: 20 , Citings Type: ACTUAL | Cement: | Sacks: 2175, Top: 640 ft., Bottom: 13640 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 3449 ft. | | | | SUSSEX | 4124 ft. | | | | SHANNON | 4646 ft. | | | | SHARON SPRINGS | 6047 ft. | | | | NIOBRARA | 6093 ft. | | | | FORT HAYS | 6555 ft. | | | | CODELL | 6625 ft. | | N | N | CARLILE | 6683 ft. | | | | No formation data to display. |
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 11034 |
Total Gas Produced (MCF) | 48505 |
GOR | 4395 |
GOR Determination | BOE |
Average BOE per Day | 52.951 |
Average MCFE per Day | 307.101 |
Federal Financial Assurance | i | Y |
|
|