Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-43575
Well Classification: OW Status: PR - 12/2/2018
Well Name/No:NORDEN #1N-14HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/2/2018
FacilityID:447749LocationID:447752
County:WELD #123Location:SWSE 14 1N67W 6
Field:WATTENBERG - #90750Elevation:4951 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:478FSL  1856 FELLat/Long: 40.045021 / -104.855105Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.045024 / -104.855427Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/15/2018
End Date: 8/19/2018
Reported: 10/16/2018
Days to report: 58
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 12/2/2018             Measured TD: 11995 ft.    Vertical TD: 7340 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 12/2/2018
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:9/11/2018
Proposed Top PZ Location:Sec:14 Twp: 1N 67W Footage: 888 FSL  1011 FEL
Bottom Hole Location:Sec:14 Twp: 1N 67W Footage: 49 FNL  912 FEL
Proposed Depth/Form:12150 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 400, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42.1 , Citings Type: PLANNED
Cement:Sacks: 30, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1800 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 700, Top: 0 ft., Bottom: 1800 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 12140 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1419, Top: , Bottom: 12140 ft.

Wellbore Completed
Completion Date:9/6/2017
Spud Date:8/9/2017Spud Date Is:ACTUAL
Measured TD:11995 ft.Measured PB depth:11942 ft.
True Vertical TD:7340 ft.True Vertical PB depth:7339 ft.
Top PZ Location:Sec:14 Twp: 1N 67WFootage: 1122 FSL  1086 FEL
Bottom Hole Location:Sec:14 Twp: 1N 67WFootage: 56 FNL  928 FEL
Log Types:MWD/GR, CALI, CBL, CNL RUN ON NORDEN 1C-14HZ (API: 05-123-43576).
Log Types:
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 97 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 97 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1868 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 667, Top: 0 ft., Bottom: 1868 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 7 in., Top: 0 ft., Depth: 6346 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 530, Top: 30 ft., Bottom: 6346 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6107 ft., Depth: 11965 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 360, Top: 6107 ft., Bottom: 11965 ft., Determination Method: CALC
Casing:String Type: 2ND LINER, Hole Size: , Size: 4.5 in., Top: 0 ft., Depth: 6107 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 305, Top: 2651 ft., Bottom: 6107 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SUSSEX4611 ft.
SHARON SPRINGS7319 ft.
NIOBRARA7354 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 12/2/2018                 Interval Top: 7754 ft.    Interval Bottom: 11867 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:11/2/2018Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/2/2018Treatment End Date:N/A
Treatment Summary:PERF AND FRAC FROM 7754-11867. 229 BBL 7.5% HCL ACID, 2,267 BBL PUMP DOWN, 145,599 BBL SLICKWATER, 148,094 TOTAL FLUID, 3,332,780# 40/70 OTTAWA/ST. PETERS, 3,332,780# TOTAL SAND.
Total fluid used in treatment (bbls):148094Max pressure during treatment (psi):7484
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:21
Total acid used in treatment (bbls):229Min frac gradient (psi/ft):0.87
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):5825
Fresh water used in treatment (bbls):147865Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3332780Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7429 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/2/2018Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 290
BBLS_OIL 222
BTU_GAS 1707
CALC_BBLS_H2O 290
CALC_BBLS_OIL 222
CALC_GOR 1081
CALC_MCF_GAS 240
CASING_PRESS 2000
GRAVITY_OIL 55
MCF_GAS 240
TUBING_PRESS 1200
Perforation Data:
Interval Top:7754 ft.# Of Holes:664
Interval Bottom:11867 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)1554
Total Gas Produced (MCF)35465
GOR22821
GOR DeterminationMCFE
Average BOE per Day21.016
Average MCFE per Day121.890

 Federal Financial Assurance  i 

 Tribal Well  i No