Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-43572
Well Classification: OW Status: PR - 5/1/2025
Well Name/No:NORDEN #2C-14HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/1/2025
FacilityID:447745LocationID:447752
County:WELD #123Location:SWSE 14 1N67W 6
Field:WATTENBERG - #90750Elevation:4952 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:477FSL  1946 FELLat/Long: 40.045023 / -104.855427Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.045021 / -104.855000Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/24/2018
End Date: 8/27/2018
Reported: 10/16/2018
Days to report: 50
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 5/1/2025             Measured TD: 12055 ft.    Vertical TD: 7540 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 5/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:9/11/2018
Proposed Top PZ Location:Sec:14 Twp: 1N 67W Footage: 842 FSL  2241 FEL
Bottom Hole Location:Sec:14 Twp: 1N 67W Footage: 50 FNL  2242 FEL
Proposed Depth/Form:12374 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 400, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42.1 , Citings Type: PLANNED
Cement:Sacks: 30, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1800 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 700, Top: 0 ft., Bottom: 1800 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 12364 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1446, Top: , Bottom: 12364 ft.

Wellbore Completed
Completion Date:9/28/2017
Spud Date:8/6/2017Spud Date Is:ACTUAL
Measured TD:12055 ft.Measured PB depth:12003 ft.
True Vertical TD:7540 ft.True Vertical PB depth:7539 ft.
Top PZ Location:Sec:14 Twp: 1N 67WFootage: 1277 FSL  2255 FEL
Bottom Hole Location:Sec:14 Twp: 1N 67WFootage: 54 FNL  2241 FEL
Log Types:MWD/GR, CBL, CNL RUN ON NORDEN 1C-14HZ (API: 05-123-43576).
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 97 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 97 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1875 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 675, Top: 0 ft., Bottom: 1875 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 7 in., Top: 0 ft., Depth: 5894 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 500, Top: 15 ft., Bottom: 5894 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 5.125 in., Size: 4.5 in., Top: 5669 ft., Depth: 12050 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 390, Top: 5669 ft., Bottom: 12055 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SUSSEX4567 ft.
SHARON SPRINGS7344 ft.
NIOBRARA7359 ft.
FORT HAYS7848 ft.
CODELL7918 ft.
CARLILE9404 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 4/3/2019                  Interval Top: 9404 ft.    Interval Bottom: 10509 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/3/2019Treatment End Date:N/A
Treatment Summary:Carlile: 9404-9860, 10252-10509
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:9404 ft.# Of Holes:240
Interval Bottom:10509 ft.Hole Size:0.44 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 4/3/2019                  Interval Top: 9245 ft.    Interval Bottom: 9404 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/3/2019Treatment End Date:N/A
Treatment Summary:Fort Hays: 9245-9247, 9248-9404
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:9245 ft.# Of Holes:240
Interval Bottom:9404 ft.Hole Size:0.44 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 5/1/2025                  Interval Top: 8038 ft.    Interval Bottom: 11992 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:11/2/2018Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/24/2018Treatment End Date:8/27/2018
Treatment Summary:PERF AND FRAC FROM 8038-11992. 90 BBL 7.5% HCL ACID, 959 BBL PUMP DOWN, 67,727 BBL SLICKWATER, 68,776 TOTAL FLUID, 2,060,009# 40/70 OTTAWA/ST. PETERS, 2,060,009# TOTAL SAND.
Total fluid used in treatment (bbls):68776Max pressure during treatment (psi):7688
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:11
Total acid used in treatment (bbls):90Min frac gradient (psi/ft):0.84
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):6751
Fresh water used in treatment (bbls):68686Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2060009Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7478 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/26/2018Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 100
BBLS_OIL 149
BTU_GAS 1707
CALC_BBLS_H2O 100
CALC_BBLS_OIL 149
CALC_GOR 1758
CALC_MCF_GAS 262
CASING_PRESS 1100
GRAVITY_OIL 55
MCF_GAS 262
TUBING_PRESS 1800
Perforation Data:
Interval Top:8038 ft.# Of Holes:240
Interval Bottom:11992 ft.Hole Size:0.44 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 4/3/2019                  Interval Top: 8038 ft.    Interval Bottom: 11992 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/3/2019Treatment End Date:N/A
Treatment Summary:Codell: 8038-9245, 9247-9248, 9860-10252, 10509-11992
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8038 ft.# Of Holes:240
Interval Bottom:11992 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)1843
Total Gas Produced (MCF)56366
GOR30583
GOR DeterminationMCFE
Average BOE per Day31.575
Average MCFE per Day183.139

 Federal Financial Assurance  i 

 Tribal Well  i No