|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 3/1/2025 Measured TD: 16390 ft. Vertical TD: 6320 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 3/1/2025 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 7/28/2018 | Proposed Top PZ Location: | Sec:4 Twp: 3N 62W | Footage: 1557 FNL 522 FEL | Bottom Hole Location: | Sec:5 Twp: 3N 62W | Footage: 1562 FNL 396 FWL | Proposed Depth/Form: | 16129 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | STATE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-1703 , Unit Acreage: 1280, Drill Unit: Sec 4 & 5: All | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 800 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 430, Top: 0 ft., Bottom: 800 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6665 ft., Weight: 26 , Citings Type: PLANNED | Cement: | Sacks: 550, Top: 600 ft., Bottom: 6665 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 5800 ft., Depth: 16419 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 700, Top: 5800 ft., Bottom: 16419 ft. |
| | |
Wellbore Completed | Completion Date: | 10/25/2017 | Spud Date: | 9/26/2017 | Spud Date Is: | ACTUAL | Measured TD: | 16390 ft. | Measured PB depth: | 16285 ft. | True Vertical TD: | 6320 ft. | True Vertical PB depth: | 6320 ft. | Top PZ Location: | Sec:4 Twp: 3N 62W | Footage: 1557 FNL 522 FEL | Bottom Hole Location: | Sec:5 Twp: 3N 62W | Footage: 1562 FNL 396 FWL | Log Types: | MWD/LWD, CBL, Mud, Resistivity | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 820 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 215, Top: 0 ft., Bottom: 820 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6097 ft., Weight: 23 , Citings Type: ACTUAL | Cement: | Sacks: 630, Top: 1150 ft., Bottom: 6097 ft., Determination Method: CBL | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 5787 ft., Depth: 16385 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 720, Top: 5787 ft., Bottom: 16385 ft., Determination Method: CALC | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 3498 ft. | | N | N | SUSSEX | 4119 ft. | | N | N | SHANNON | 4690 ft. | | N | N | SHARON SPRINGS | 6034 ft. | | N | N | NIOBRARA | 6219 ft. | | N | N |
Formation NBRR Formation Classification: OW Status: PR - 3/1/2025 Interval Top: 6698 ft. Interval Bottom: 16255 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 3/13/2018 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | HYDRAULIC FRACTURING | Treatment Date: | 1/8/2018 | Treatment End Date: | 1/21/2018 | Treatment Summary: | 80 STAGE WET SHOE PLUG AND PERF 10,930,913 LBS 20/40 SAND, 5,350 LBS 30/50 SAND, 1,071,647 LBS 100# MESH, 1,464 BBLS 15% HCL ACID, AND 170,037 BBLS SLICKWATER | Total fluid used in treatment (bbls): | 171501 | Max pressure during treatment (psi): | 7116 | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 80 | Total acid used in treatment (bbls): | 1464 | Min frac gradient (psi/ft): | 0.92 | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 12142 | Fresh water used in treatment (bbls): | 170037 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 12007910 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6438 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 4/2/2018 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 440 | BBLS_OIL | 153 | BTU_GAS | 1478 | CALC_BBLS_H2O | 440 | CALC_BBLS_OIL | 153 | CALC_GOR | 536 | CALC_MCF_GAS | 82 | CASING_PRESS | 1017 | GRAVITY_OIL | 34 | MCF_GAS | 82 | TUBING_PRESS | 626 |
| Perforation Data: | Interval Top: | 6698 ft. | # Of Holes: | 2880 | Interval Bottom: | 16255 ft. | Hole Size: | 0.37 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 3886 |
Total Gas Produced (MCF) | 12583 |
GOR | 3238 |
GOR Determination | BOE |
Average BOE per Day | 15.655 |
Average MCFE per Day | 90.817 |
Federal Financial Assurance | i | |
|
|