Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-43112
Well Classification: OW Status: PR - 5/1/2021
Well Name/No:HWY 52 #4T-32H-O268
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/1/2021
FacilityID:445574LocationID:434554
Municipality/County:FREDERICK / WELD #123Location:SWSE 32 2N68W 6
Field:WATTENBERG - #90750Elevation:4991 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:598FSL  1934 FELLat/Long: 40.089354 / -105.024606Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.089353 / -105.024605Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/24/2018
End Date: 3/8/2018
Reported: 3/26/2018
Days to report: 18
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 5/1/2021             Measured TD: 11965 ft.    Vertical TD: 7475 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 5/1/2021
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:4/21/2018
Proposed Top PZ Location:Sec:32 Twp: 2N 68W Footage: 780 FSL  752 FEL
Bottom Hole Location:Sec:32 Twp: 2N 68W Footage: 497 FNL  806 FEL
Proposed Depth/Form:11908 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED
Cement:Sacks: 80, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1694 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 738, Top: 0 ft., Bottom: 1694 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 12046 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 1953, Top: , Bottom: 12046 ft.

Wellbore Completed
Completion Date:8/21/2017
Spud Date:3/10/2017Spud Date Is:ACTUAL
Measured TD:11965 ft.Measured PB depth:11921 ft.
True Vertical TD:7475 ft.True Vertical PB depth:7474 ft.
Top PZ Location:Sec:32 Twp: 2N 68WFootage: 780 FSL  752 FEL
Bottom Hole Location:Sec:32 Twp: 2N 68WFootage: 497 FNL  806 FEL
Log Types:Mud Log, MWD/LWD, CBL. (Resistivity in 123-38246)
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 16 in., Top: 0 ft., Depth: 112 ft., Weight: 65 , Citings Type: ACTUAL
Cement:Sacks: 190, Top: 0 ft., Bottom: 112 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1666 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 637, Top: 0 ft., Bottom: 1666 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 11945 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 1420, Top: 4084 ft., Bottom: 11945 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4491 ft.
SHANNON5064 ft.
TEEPEE BUTTES6615 ft.
SHARON SPRINGS7536 ft.
NIOBRARA7774 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 5/1/2021                  Interval Top: 7914 ft.    Interval Bottom: 11853 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/3/2018Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/24/2018Treatment End Date:3/8/2018
Treatment Summary:156411 bbls water, 20 bbls produced brine water, 132 bbls additives (FRP-4K, ACI-97 and ASF-67) and 35 bbl HCL & Spearpoint in a 23 stage frac with 3,585,300 lbs of silica quartz proppant and 1800 lbs of Calcium Chloride
Total fluid used in treatment (bbls):156598Max pressure during treatment (psi):9041
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:23
Total acid used in treatment (bbls):35Min frac gradient (psi/ft):0.88
Recycled water used in treatment (bbls):20Total flowback volume recovered (bbls):13453
Fresh water used in treatment (bbls):156543Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3585300Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7644 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/3/2018Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 60
BBLS_OIL 277
BTU_GAS 1233
CALC_BBLS_H2O 60
CALC_BBLS_OIL 277
CALC_GOR 3191
CALC_MCF_GAS 884
CASING_PRESS 2023
GRAVITY_OIL 45
MCF_GAS 884
TUBING_PRESS 1434
Perforation Data:
Interval Top:7914 ft.# Of Holes:529
Interval Bottom:11853 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
March 2025 - February 2026i
Total Oil Produced (Barrels)2349
Total Gas Produced (MCF)75953
GOR32334
GOR DeterminationMCFE
Average BOE per Day42.233
Average MCFE per Day244.971

 Federal Financial Assurance  i 

 Tribal Well  i No