Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-43110
Well Classification: OW Status: PR - 9/3/2018
Well Name/No:HWY 52 #4Q-32H-O268
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/3/2018
FacilityID:445572LocationID:434554
Municipality/County:FREDERICK / WELD #123Location:SWSE 32 2N68W 6
Field:WATTENBERG - #90750Elevation:4992 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:598FSL  1964 FELLat/Long: 40.089354 / -105.024714Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.089353 / -105.024713Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/9/2018
End Date: 3/15/2018
Reported: 3/26/2018
Days to report: 11
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 9/3/2018             Measured TD: 11882 ft.    Vertical TD: 7407 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 9/3/2018
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:4/21/2018
Proposed Top PZ Location:Sec:32 Twp: 2N 68W Footage: 779 FSL  1384 FEL
Bottom Hole Location:Sec:32 Twp: 2N 68W Footage: 464 FNL  1385 FEL
Proposed Depth/Form:11845 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED
Cement:Sacks: 80, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1684 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 735, Top: 0 ft., Bottom: 1684 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 11978 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 1941, Top: , Bottom: 11978 ft.

Wellbore Completed
Completion Date:8/6/2017
Spud Date:3/13/2017Spud Date Is:ACTUAL
Measured TD:11882 ft.Measured PB depth:11829 ft.
True Vertical TD:7407 ft.True Vertical PB depth:7406 ft.
Top PZ Location:Sec:32 Twp: 2N 68WFootage: 779 FSL  1384 FEL
Bottom Hole Location:Sec:32 Twp: 2N 68WFootage: 464 FNL  1385 FEL
Log Types:Mud Log, MWD/LWD, CBL. (Resistivity in 123-38246)
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 16 in., Top: 0 ft., Depth: 135 ft., Weight: 65 , Citings Type: ACTUAL
Cement:Sacks: 190, Top: 0 ft., Bottom: 135 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1666 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 634, Top: 0 ft., Bottom: 1666 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 11862 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 1406, Top: 1380 ft., Bottom: 11882 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4508 ft.
SHANNON5009 ft.
TEEPEE BUTTES6545 ft.
SHARON SPRINGS7466 ft.
NIOBRARA7670 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 9/3/2018                  Interval Top: 7797 ft.    Interval Bottom: 11773 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/3/2018Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/9/2018Treatment End Date:3/15/2018
Treatment Summary:156181 bbls water, 141 bbls additives (FRP-4K, ACI-97 and ASF-67) and 36 bbl HCL in a 23 stage frac with 3,437,620 lbs of silica quartz proppant
Total fluid used in treatment (bbls):156358Max pressure during treatment (psi):9021
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:23
Total acid used in treatment (bbls):36Min frac gradient (psi/ft):0.91
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):10795
Fresh water used in treatment (bbls):156322Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3437620Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7504 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/3/2018Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 80
BBLS_OIL 310
BTU_GAS 1238
CALC_BBLS_H2O 80
CALC_BBLS_OIL 310
CALC_GOR 2368
CALC_MCF_GAS 734
CASING_PRESS 2098
GRAVITY_OIL 45
MCF_GAS 734
TUBING_PRESS 1433
Perforation Data:
Interval Top:7797 ft.# Of Holes:474
Interval Bottom:11773 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
March 2025 - February 2026i
Total Oil Produced (Barrels)2506
Total Gas Produced (MCF)86447
GOR34496
GOR DeterminationMCFE
Average BOE per Day47.697
Average MCFE per Day276.654

 Federal Financial Assurance  i 

 Tribal Well  i No