Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-43096
Well Classification: OW Status: SI - 1/1/2026
Well Name/No:Schaumberg #17F-232
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date1/1/2026
FacilityID:445542LocationID:445225
County:WELD #123Location:SWNW 17 5N64W 6
Field:WATTENBERG - #90750Elevation:4620 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1624FNL  965 FWLLat/Long: 40.402000 / -104.580008Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.402002 / -104.579739Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/17/2017
End Date: 1/25/2017
Reported: 2/2/2017
Days to report: 8
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 1/1/2026             Measured TD: 11632 ft.    Vertical TD: 6665 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 1/1/2026
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:4/19/2018
Proposed Top PZ Location:Sec:17 Twp: 5N 64W Footage: 1905 FNL  282 FWL
Bottom Hole Location:Sec:17 Twp: 5N 64W Footage: 1917 FNL  428 FEL
Proposed Depth/Form:12019 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 200, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1450 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 920, Top: 0 ft., Bottom: 1450 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12019 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2035, Top: 0 ft., Bottom: 12019 ft.

Wellbore Completed
Completion Date:6/19/2016
Spud Date:6/12/2016Spud Date Is:ACTUAL
Measured TD:11632 ft.Measured PB depth:11595 ft.
True Vertical TD:6665 ft.True Vertical PB depth:6667 ft.
Top PZ Location:Sec:17 Twp: 5N 64WFootage: 1905 FNL  282 FWL
Bottom Hole Location:Sec:17 Twp: 5N 64WFootage: 1917 FNL  428 FEL
Log Types:CBL, MWD (DIL in 123-43088-00)
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1494 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 690, Top: 0 ft., Bottom: 1494 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 11610 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 1965, Top: 0 ft., Bottom: 11610 ft., Determination Method: VISU
FormationInterval TopLog BottomCoredDSTs
PARKMAN3617 ft.
SUSSEX4329 ft.
SHANNON5084 ft.
SHARON SPRINGS6608 ft.
NIOBRARA6795 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  SI - 1/1/2026                  Interval Top: 7022 ft.    Interval Bottom: 11553 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/2/2017Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/17/2017Treatment End Date:1/25/2017
Treatment Summary:35 Stage Plug and Perf, Perf'd from 7022-11399, 3 Toe sleeves from 11459-11553 Total Fluid: 98,297 bbls Gel Fluid: 59,771 bbls Slickwater Fluid: 37,697 bbls 15% HCl Acid: 829 bbls Total Proppant: 5,250,000 lbs Silica Proppant: 5,250,000 lbs Method for determining flowback: measuring flowback tank volumes
Total fluid used in treatment (bbls):98297Max pressure during treatment (psi):4697
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:35
Total acid used in treatment (bbls):829Min frac gradient (psi/ft):1.02
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):3399
Fresh water used in treatment (bbls):97468Disposition method For flowback:DISPOSAL
Total proppant used (lbs):5250000Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6867 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/10/2017Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 190
BBLS_OIL 388
BTU_GAS 1322
CALC_BBLS_H2O 190
CALC_BBLS_OIL 388
CALC_GOR 2775
CALC_MCF_GAS 1077
CASING_PRESS 2608
GRAVITY_OIL 50
MCF_GAS 1077
TUBING_PRESS 1872
Perforation Data:
Interval Top:7022 ft.# Of Holes:1224
Interval Bottom:11553 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)3361
Total Gas Produced (MCF)46947
GOR13968
GOR DeterminationBOE
Average BOE per Day31.218
Average MCFE per Day181.069

 Federal Financial Assurance  i 

 Tribal Well  i No