Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-43091
Well Classification: OW Status: PR - 3/10/2017
Well Name/No:Schaumberg #17F-204
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/10/2017
FacilityID:445537LocationID:445225
County:WELD #123Location:SWNW 17 5N64W 6
Field:WATTENBERG - #90750Elevation:4620 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1624FNL  1025 FWLLat/Long: 40.402001 / -104.579793Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.402000 / -104.579954Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/3/2017
End Date: 1/16/2017
Reported: 1/31/2017
Days to report: 15
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 3/10/2017             Measured TD: 12092 ft.    Vertical TD: 6713 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 3/10/2017
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:4/19/2018
Proposed Top PZ Location:Sec:18 Twp: 5N 64W Footage: 1385 FNL  35 FEL
Bottom Hole Location:Sec:18 Twp: 5N 64W Footage: 1305 FNL  106 FEL
Proposed Depth/Form:12253 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 480, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1450 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 920, Top: 0 ft., Bottom: 1450 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12253 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2035, Top: 0 ft., Bottom: 12253 ft.

Wellbore Completed
Completion Date:7/17/2016
Spud Date:7/12/2016Spud Date Is:ACTUAL
Measured TD:12092 ft.Measured PB depth:12046 ft.
True Vertical TD:6713 ft.True Vertical PB depth:6715 ft.
Top PZ Location:Sec:18 Twp: 5N 64WFootage: 1385 FNL  35 FEL
Bottom Hole Location:Sec:18 Twp: 5N 64WFootage: 1305 FNL  106 FEL
Log Types:CBL, MWD (DIL in 123-43088-00)
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1517 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 720, Top: 0 ft., Bottom: 1517 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12061 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 1980, Top: 0 ft., Bottom: 12061 ft., Determination Method: VISU
FormationInterval TopLog BottomCoredDSTs
PARKMAN3527 ft.
SUSSEX4247 ft.
SHANNON4997 ft.
SHARON SPRINGS6494 ft.
NIOBRARA6653 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 3/10/2017                 Interval Top: 7127 ft.    Interval Bottom: 12001 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/2/2017Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/3/2017Treatment End Date:1/16/2017
Treatment Summary:30 Stage Plug and Perf, Perf'd from 7127-11810, 3 Toe sleeves from 11105-12001 Total Fluid: 99,852 bbls Gel Fluid: 55,855 bbls Slickwater Fluid: 42,971 bbls 15% HCl Acid: 1,026 Total Proppant: 4,691,300 lbs Silica Proppant: 4,691,300 lbs Method for determining flowback: measuring flowback tank volumes
Total fluid used in treatment (bbls):99852Max pressure during treatment (psi):4310
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:30
Total acid used in treatment (bbls):1026Min frac gradient (psi/ft):1.00
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):4059
Fresh water used in treatment (bbls):98826Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4691300Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6769 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/10/2017Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 209
BBLS_OIL 427
BTU_GAS 1322
CALC_BBLS_H2O 209
CALC_BBLS_OIL 427
CALC_GOR 2854
CALC_MCF_GAS 1219
CASING_PRESS 2649
GRAVITY_OIL 50
MCF_GAS 1219
TUBING_PRESS 2024
Perforation Data:
Interval Top:7127 ft.# Of Holes:1044
Interval Bottom:12001 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)1121
Total Gas Produced (MCF)49879
GOR44495
GOR DeterminationMCFE
Average BOE per Day26.610
Average MCFE per Day154.385

 Federal Financial Assurance  i 

 Tribal Well  i No