Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-43040
Well Classification: OW Status: PR - 5/4/2018
Well Name/No:Horsetail #30G-1943
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:FUNDARE RESOURCES OPERATING COMPANY LLC - 10773
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/4/2018
FacilityID:445361LocationID:445362
County:WELD #123Location:SWNE 30 10N57W 6
Field:DJ HORIZONTAL NIOBRARA - #16950Elevation:4743 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2325FNL  1980 FELLat/Long: 40.810664 / -103.791692Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.810664 / -103.791697Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/18/2018
End Date: 3/24/2018
Reported: 4/25/2018
Days to report: 32
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 5/4/2018             Measured TD: 13985 ft.    Vertical TD: 5821 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 5/4/2018
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/31/2018
Proposed Top PZ Location:Sec:30 Twp: 10N 57W Footage: 2405 FNL  2036 FEL
Bottom Hole Location:Sec:19 Twp: 10N 57W Footage: 103 FNL  1938 FEL
Proposed Depth/Form:13946 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-369 , Unit Acreage: 960, Drill Unit: N/2 30, All 19
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 65 , Citings Type: PLANNED
Cement:Sacks: 179, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1520 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 645, Top: 0 ft., Bottom: 1520 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 13946 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 2034, Top: 0 ft., Bottom: 13946 ft.

Wellbore Completed
Completion Date:12/2/2016
Spud Date:11/26/2016Spud Date Is:ACTUAL
Measured TD:13985 ft.Measured PB depth:13933 ft.
True Vertical TD:5821 ft.True Vertical PB depth:5820 ft.
Top PZ Location:Sec:30 Twp: 10N 57WFootage: 2405 FNL  2036 FEL
Bottom Hole Location:Sec:19 Twp: 10N 57WFootage: 103 FNL  1938 FEL
Log Types:Mud, LWD, CBL
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 101 ft., Weight: 65 , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 101 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2063 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 670, Top: 0 ft., Bottom: 2063 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 13981 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2425, Top: 46 ft., Bottom: 13981 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PIERRE1384 ft.NN
HYGIENE3133 ft.NN
SHARON SPRINGS5480 ft.NN
NIOBRARA5483 ft.NN
FORT HAYS5770 ft.NN
CODELL5808 ft.NN
CARLILE5817 ft.NN

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 11/2/2018                 Interval Top: 8587 ft.    Interval Bottom: 13534 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:4/27/2018Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:3/18/2018Treatment End Date:3/24/2018
Treatment Summary:Completed depths: 8587-8621 (20 shots), 9196-9252 (30 shots), 9690-9750 (30 shots), 13528-13534 (20 shots)
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8587 ft.# Of Holes:100
Interval Bottom:13534 ft.Hole Size:0.375 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 11/2/2018                 Interval Top: 6817 ft.    Interval Bottom: 13893 ft.

 Completed Information for Formation CODELL
1st Production Date:4/27/2018Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:3/18/2018Treatment End Date:3/24/2018
Treatment Summary:Completed depths 6817-8538 (480 shots), 8651-9140 (140 shots), 9282-9658 (100 shots), 9810-12268 (650 shots), 12453-13496 (280 shots), 13584-13893 (89 shots)
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:6817 ft.# Of Holes:1739
Interval Bottom:13893 ft.Hole Size:0.375 in.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 11/2/2018                 Interval Top: 6375 ft.    Interval Bottom: 12421 ft.

 Completed Information for Formation CARLILE
1st Production Date:4/27/2018Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:3/18/2018Treatment End Date:3/24/2018
Treatment Summary:Completed depths: 6375-6762 (120 shots), 12300-12421 (40 shots)
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:6375 ft.# Of Holes:160
Interval Bottom:12421 ft.Hole Size:0.375 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 5/4/2018                  Interval Top: 6375 ft.    Interval Bottom: 13893 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:4/27/2018Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/18/2018Treatment End Date:3/24/2018
Treatment Summary:50 stage plug & perf, 946518# 100 Mesh, 3959444# 40/70 White Sand, 48 bbls 15% HCl, 191452 bbls Slickwater
Total fluid used in treatment (bbls):191500Max pressure during treatment (psi):8014
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:50
Total acid used in treatment (bbls):48Min frac gradient (psi/ft):0.80
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):8064
Fresh water used in treatment (bbls):191452Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4905962Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:5846 ft.
Tubing Packer Depth:5830 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/4/2018Test Method:Separator
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 624
BBLS_OIL 165
BTU_GAS 1871
CALC_BBLS_H2O 624
CALC_BBLS_OIL 165
CALC_GOR 376
CALC_MCF_GAS 62
GRAVITY_OIL 36
MCF_GAS 62
TUBING_PRESS 250
Perforation Data:
Interval Top:6375 ft.# Of Holes:1999
Interval Bottom:13893 ft.Hole Size:0.375 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
September 2024 - August 2025i
Total Oil Produced (Barrels)2626
Total Gas Produced (MCF)34871
GOR13279
GOR DeterminationBOE
Average BOE per Day23.678
Average MCFE per Day137.323

 Federal Financial Assurance  i 

 Tribal Well  i No