|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 12/2/2016 Measured TD: 5776 ft. Vertical TD: 5726 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 12/2/2016 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 3/31/2018 | | Proposed Top PZ Location: | Sec:30 Twp: 10N 57W | Footage: 2562 FSL 1744 FEL | | Bottom Hole Location: | Sec:31 Twp: 10N 57W | Footage: 100 FSL 2018 FEL | | Proposed Depth/Form: | 13903 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 535-508 , Unit Acreage: 960, Drill Unit: S/2 S30, All S31 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 535-508 , Unit Acreage: 960, Drill Unit: S/2 30, All 31 | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 65 , Citings Type: PLANNED | | Cement: | Sacks: 179, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1520 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 645, Top: 0 ft., Bottom: 1520 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 13903 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 2028, Top: 0 ft., Bottom: 13903 ft. |
| | |
| Wellbore Completed | | Completion Date: | 12/3/2016 | | Spud Date: | 12/3/2016 | Spud Date Is: | ACTUAL | | Measured TD: | 5776 ft. | Measured PB depth: | 4733 ft. | | True Vertical TD: | 5726 ft. | True Vertical PB depth: | 4722 ft. | | Bottom Hole Location: | Sec:30 Twp: 10N 57W | Footage: 2314 FNL 1787 FEL | | Log Types: | Mud Log, MWD/LWD (CAL, IND, NEU, GR in API 123-43034) | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 101 ft., Weight: 65 , Citings Type: ACTUAL | | Cement: | Sacks: 153, Top: 0 ft., Bottom: 101 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2058 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 670, Top: 0 ft., Bottom: 2058 ft., Determination Method: VISU | | Casing: | String Type: OPEN HOLE, Hole Size: 8.5 in., Size: , Top: 2058 ft., Depth: 5776 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: | | Additional Cement: | String Type: OPEN HOLE , Top: 4733 ft., Depth: 4733 ft., Bottom: 5776 ft., Sacks: 470, Method: | | No formation data to display. |
Sidetrack #01 Wellbore Classification: OW Status: PR - 4/1/2018 Measured TD: 13966 ft. Vertical TD: 5807 ft.| Wellbore Data for Sidetrack #01 | Wellbore Classification: OW PR - 4/1/2018 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 12/8/2018 | | Proposed Top PZ Location: | Sec:30 Twp: 10N 57W | Footage: 2562 FSL 1724 FEL | | Bottom Hole Location: | Sec:31 Twp: 10N 57W | Footage: 100 FSL 2018 FEL | | Proposed Depth/Form: | 13974 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 535-508 , Unit Acreage: 960, Drill Unit: S/2 S30, All S31 | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 20 in., Top: 0 ft., Depth: 80 ft., Weight: 92 , Citings Type: PLANNED | | Cement: | Sacks: 179, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2057 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 870, Top: 0 ft., Bottom: 2057 ft. | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 13974 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 2028, Top: 0 ft., Bottom: 13974 ft. |
| | |
| Wellbore Completed | | Completion Date: | 12/12/2016 | | Spud Date: | 12/3/2016 | Spud Date Is: | ACTUAL | | Measured TD: | 13966 ft. | Measured PB depth: | 13911 ft. | | True Vertical TD: | 5807 ft. | True Vertical PB depth: | 5806 ft. | | Top PZ Location: | Sec:30 Twp: 10N 57W | Footage: 2403 FSL 1735 FEL | | Bottom Hole Location: | Sec:31 Twp: 10N 57W | Footage: 96 FSL 2043 FEL | | Log Types: | Mud Log, MWD/LWD, CBL (CAL, IND, NEU, GR in API 123-43034) | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 101 ft., Weight: 65 , Citings Type: ACTUAL | | Cement: | Sacks: 153, Top: 0 ft., Bottom: 101 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2058 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 670, Top: 0 ft., Bottom: 2058 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 13960 ft., Weight: 20 , Citings Type: ACTUAL | | Cement: | Sacks: 2420, Top: 280 ft., Bottom: 13966 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PIERRE | 1400 ft. | | | | | HYGIENE | 3133 ft. | | | | | SUSSEX | 3810 ft. | | | | | SHARON SPRINGS | 5485 ft. | | | | | NIOBRARA | 5494 ft. | | | | | FORT HAYS | 5756 ft. | | N | N | | CODELL | 5798 ft. | | N | N | | CARLILE | 5810 ft. | | N | N |
Formation FTHYS Formation Classification: OW Status: PR - 11/3/2020 Interval Top: 10770 ft. Interval Bottom: 11573 ft.| Completed Information for Formation FORT HAYS | | 1st Production Date: | 4/28/2018 | Choke Size: | | | Formation Name: | FORT HAYS | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 11/3/2020 | Treatment End Date: | N/A | | Treatment Summary: | Completed depths: 10770-11573 (220 shots) | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation FTHYS. |
| | Perforation Data: | | Interval Top: | 10770 ft. | # Of Holes: | 220 | | Interval Bottom: | 11573 ft. | Hole Size: | 0.375 in. |
|
Formation CARL Formation Classification: OW Status: PR - 11/3/2020 Interval Top: 6770 ft. Interval Bottom: 12307 ft.| Completed Information for Formation CARLILE | | 1st Production Date: | 4/28/2018 | Choke Size: | | | Formation Name: | CARLILE | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 11/3/2020 | Treatment End Date: | N/A | | Treatment Summary: | Completed depths 6770-6842 (30shots), 7959-8964 (280 shots), 9167-9356 (60 shots), 11772-12307 (150 shots) | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CARL. |
| | Perforation Data: | | Interval Top: | 6770 ft. | # Of Holes: | 520 | | Interval Bottom: | 12307 ft. | Hole Size: | 0.375 in. |
|
Formation CLCDFH Formation Classification: OW Status: CM - 5/3/2018 Interval Top: 6345 ft. Interval Bottom: 13864 ft.| Completed Information for Formation CARLILE-CODELL-FORT HAYS | | 1st Production Date: | 4/28/2018 | Choke Size: | | | Formation Name: | CARLILE-CODELL-FORT HAYS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 3/18/2018 | Treatment End Date: | 3/24/2018 | | Treatment Summary: | 50 stage plug & perf, 964203 lbs. 100 mesh, 3961592 lbs. 40/70 White Sand, 48 bbls 15% HCl, 192587 bbls slickwater | | Total fluid used in treatment (bbls): | 192635 | Max pressure during treatment (psi): | 8290 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.33 | | Type Of gas: | | Number Of staged intervals: | 50 | | Total acid used in treatment (bbls): | 48 | Min frac gradient (psi/ft): | 0.80 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 8079 | | Fresh water used in treatment (bbls): | 192587 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 4925795 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 5830 ft. | | Tubing Packer Depth: | 5814 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/3/2018 | Test Method: | Separator | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 725 | | BBLS_OIL | 135 | | BTU_GAS | 1709 | | CALC_BBLS_H2O | 725 | | CALC_BBLS_OIL | 135 | | CALC_GOR | 370 | | CALC_MCF_GAS | 50 | | GRAVITY_OIL | 39 | | MCF_GAS | 50 | | TUBING_PRESS | 295 |
| | Perforation Data: | | Interval Top: | 6345 ft. | # Of Holes: | 1999 | | Interval Bottom: | 13864 ft. | Hole Size: | 0.375 in. |
|
Formation CODL Formation Classification: OW Status: PR - 11/3/2020 Interval Top: 6345 ft. Interval Bottom: 13864 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 4/28/2018 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 11/3/2020 | Treatment End Date: | N/A | | Treatment Summary: | Completed depths 6345-6722 (120 shots), 6860-7902 (290 shots), 9013-9117 (40 shots), 9388-10738 (360 shots), 11623-11722 (40 shots), 12332-13864 (409 shots) | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 6345 ft. | # Of Holes: | 1259 | | Interval Bottom: | 13864 ft. | Hole Size: | 0.375 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 3165 |
| Total Gas Produced (MCF) | 6963 |
| GOR | 2200 |
| GOR Determination | BOE |
| Average BOE per Day | 11.951 |
| Average MCFE per Day | 69.313 |
| Federal Financial Assurance | i | |
|
|