Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-43015
Well Classification: OW Status: PR - 2/1/2025
Well Name/No:CAMENISCH #10N-34HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/1/2025
FacilityID:445333LocationID:336504
County:WELD #123Location:SWNE 15 2N68W 6
Field:WATTENBERG - #90750Elevation:4875 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2229FNL  2178 FELLat/Long: 40.139979 / -104.987552Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.139980 / -104.987556Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/22/2017
End Date: 9/7/2017
Reported: 10/19/2017
Days to report: 42
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 2/1/2025             Measured TD: 21222 ft.    Vertical TD: 7212 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 2/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/30/2018
Proposed Top PZ Location:Sec:15 Twp: 2N 68W Footage: 1534 FNL  1843 FEL
Bottom Hole Location:Sec:34 Twp: 3N 68W Footage: 1455 FSL  1922 FEL
Proposed Depth/Form:15416 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 480, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42.1 , Citings Type: PLANNED
Cement:Sacks: 30, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 590, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 21269 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 2535, Top: , Bottom: 21269 ft.

Wellbore Completed
Completion Date:4/4/2017
Spud Date:3/8/2017Spud Date Is:ACTUAL
Measured TD:21222 ft.Measured PB depth:21153 ft.
True Vertical TD:7212 ft.True Vertical PB depth:7213 ft.
Top PZ Location:Sec:15 Twp: 2N 68WFootage: 1534 FNL  1843 FEL
Bottom Hole Location:Sec:34 Twp: 3N 68WFootage: 1455 FSL  1922 FEL
Log Types:CBL, MWD/GR, (CNL in 05-123-43017), (IND in 05-123-24995, 05-123-26359, 05-123-08587)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 110 ft., Weight: 42.1 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 110 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2329 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 908, Top: 0 ft., Bottom: 2329 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 21208 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2930, Top: 0 ft., Bottom: 21208 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4536 ft.
SHARON SPRINGS7173 ft.
NIOBRARA7272 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 2/1/2025                  Interval Top: 7704 ft.    Interval Bottom: 21136 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/5/2017Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/22/2017Treatment End Date:9/7/2017
Treatment Summary:"PERF AND FRAC FROM 7704-21136. 843 BBL 7.5% HCL ACID, 408,819 BBL SLICKWATER, 14,838 BBL PUMP DOWN, - 424,500 TOTAL FLUID 7,977,710# 40/70 OTTAWA/ST. PETERS, - 7,977,710# TOTAL SAND."
Total fluid used in treatment (bbls):424500Max pressure during treatment (psi):7590
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:44
Total acid used in treatment (bbls):843Min frac gradient (psi/ft):0.93
Recycled water used in treatment (bbls):3800Total flowback volume recovered (bbls):164
Fresh water used in treatment (bbls):419857Disposition method For flowback:RECYCLE
Total proppant used (lbs):7977710Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/22/2017Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 38
BTU_GAS 1255
CALC_BBLS_OIL 38
CALC_GOR 3184
CALC_MCF_GAS 121
CASING_PRESS 2500
GRAVITY_OIL 56
MCF_GAS 121
Perforation Data:
Interval Top:7704 ft.# Of Holes:1064
Interval Bottom:21136 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)4995
Total Gas Produced (MCF)148732
GOR29776
GOR DeterminationMCFE
Average BOE per Day83.537
Average MCFE per Day484.521

 Federal Financial Assurance  i 

 Tribal Well  i No