Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-42938
Well Classification: OW Status: PR - 4/8/2018
Well Name/No:Kramer Federal #LC22-725
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/8/2018
FacilityID:445192LocationID:445191
County:WELD #123Location:NENE 15 9N59W 6
Field:DJ HORIZONTAL NIOBRARA - #16950Elevation:4963 ft.
Planned Location:285FNL  397 FELLat/Long: 40.757440 / -103.956230Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.757442 / -103.956236Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/24/2017
End Date: 8/5/2017
Reported: 3/4/2019
Originally Reported: 8/17/2017
Days to report: 576
Days to report: 12
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 4/8/2018             Measured TD: 16178 ft.    Vertical TD: 6050 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 4/8/2018
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/17/2018
Prop Depth/Form:16046 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-681 , Unit Acreage: 3840, Drill Unit: S:10,11,14,15,22,23
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 6, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 1850 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 535, Top: 0 ft., Bottom: 1850 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16132 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 1153, Top: , Bottom:
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6319 ft., Depth: 16046 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:2/10/2017
Spud Date:2/4/2017Spud Date Is:ACTUAL
Measured TD:16178 ft.Measured PB depth:16120 ft.
True Vertical TD:6050 ft.True Vertical PB depth:6051 ft.
Top PZ Location:Sec:15 Twp: 9N 59WFootage: 402 FNL  660 FELDepth
Bottom Hole Location:Sec:22 Twp: 9N 59WFootage: 324 FSL  762 FELDepth
Log Types:CBL, MWD/LWD, (DIL in API 123-42939)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 110 ft., Weight: 42.09 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 110 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1930 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 669, Top: 0 ft., Bottom: 1930 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16163 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 1775, Top: 1612 ft., Bottom: 16163 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3498 ft.
SUSSEX4121 ft.
SHANNON4586 ft.
TEEPEE BUTTES5348 ft.
NIOBRARA6180 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 4/8/2018                  Interval Top: 6200 ft.    Interval Bottom: 15943 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/4/2018Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/24/2017Treatment End Date:8/5/2017
Treatment Summary:NIOBRARA FRAC'D WITH 2425 BBLS 15% HCL, 5 BBLS 28%HCL, 32617 BBLS RECYCLED WATER, 137026 BBLS FRESH WATER, & 8940580 LBS 40/70 OTTAWA SAND.
Total fluid used in treatment (bbls):172073Max pressure during treatment (psi):8039
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.46
Type Of gas:Number Of staged intervals:250
Total acid used in treatment (bbls):2430Min frac gradient (psi/ft):0.75
Recycled water used in treatment (bbls):32617Total flowback volume recovered (bbls):144
Fresh water used in treatment (bbls):137026Disposition method For flowback:DISPOSAL
Total proppant used (lbs):8940580Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6106 ft.
Tubing Packer Depth:6111 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/8/2018Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 310
BBLS_OIL 395
BTU_GAS 1385
CALC_BBLS_H2O 310
CALC_BBLS_OIL 395
CALC_GOR 460
CALC_MCF_GAS 182
CASING_PRESS 950
GRAVITY_OIL 52
MCF_GAS 182
TUBING_PRESS 458
Perforation Data:
Interval Top:6200 ft.# Of Holes:1500
Interval Bottom:15943 ft.Hole Size:0.48 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)7869
Total Gas Produced (MCF)34549
GOR4390
GOR DeterminationBOE
Average BOE per Day37.829
Average MCFE per Day219.424

 Federal Financial Assurance  i 

 Tribal Well  i No