|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 4/8/2018 Measured TD: 16178 ft. Vertical TD: 6050 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 4/8/2018 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 3/17/2018 | Prop Depth/Form: | 16046 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 535-681 , Unit Acreage: 3840, Drill Unit: S:10,11,14,15,22,23 | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED | Cement: | Sacks: 6, Top: 0 ft., Bottom: 80 ft. | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 1850 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 535, Top: 0 ft., Bottom: 1850 ft. | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16132 ft., Weight: 20 , Citings Type: PLANNED | Cement: | Sacks: 1153, Top: , Bottom: | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6319 ft., Depth: 16046 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: |
| | |
Wellbore Completed | Completion Date: | 2/10/2017 | Spud Date: | 2/4/2017 | Spud Date Is: | ACTUAL | Measured TD: | 16178 ft. | Measured PB depth: | 16120 ft. | True Vertical TD: | 6050 ft. | True Vertical PB depth: | 6051 ft. | Top PZ Location: | Sec:15 Twp: 9N 59W | Footage: 402 FNL 660 FEL | Depth | Bottom Hole Location: | Sec:22 Twp: 9N 59W | Footage: 324 FSL 762 FEL | Depth | Log Types: | CBL, MWD/LWD, (DIL in API 123-42939) | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 110 ft., Weight: 42.09 , Citings Type: ACTUAL | Cement: | Sacks: 64, Top: 0 ft., Bottom: 110 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1930 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 669, Top: 0 ft., Bottom: 1930 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16163 ft., Weight: 20 , Citings Type: ACTUAL | Cement: | Sacks: 1775, Top: 1612 ft., Bottom: 16163 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 3498 ft. | | | | SUSSEX | 4121 ft. | | | | SHANNON | 4586 ft. | | | | TEEPEE BUTTES | 5348 ft. | | | | NIOBRARA | 6180 ft. | | | |
Formation NBRR Formation Classification: OW Status: PR - 4/8/2018 Interval Top: 6200 ft. Interval Bottom: 15943 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 4/4/2018 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 7/24/2017 | Treatment End Date: | 8/5/2017 | Treatment Summary: | NIOBRARA FRAC'D WITH 2425 BBLS 15% HCL, 5 BBLS 28%HCL, 32617 BBLS RECYCLED WATER, 137026 BBLS FRESH WATER, & 8940580 LBS 40/70 OTTAWA SAND. | Total fluid used in treatment (bbls): | 172073 | Max pressure during treatment (psi): | 8039 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.46 | Type Of gas: | | Number Of staged intervals: | 250 | Total acid used in treatment (bbls): | 2430 | Min frac gradient (psi/ft): | 0.75 | Recycled water used in treatment (bbls): | 32617 | Total flowback volume recovered (bbls): | 144 | Fresh water used in treatment (bbls): | 137026 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 8940580 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6106 ft. | Tubing Packer Depth: | 6111 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 4/8/2018 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 310 | BBLS_OIL | 395 | BTU_GAS | 1385 | CALC_BBLS_H2O | 310 | CALC_BBLS_OIL | 395 | CALC_GOR | 460 | CALC_MCF_GAS | 182 | CASING_PRESS | 950 | GRAVITY_OIL | 52 | MCF_GAS | 182 | TUBING_PRESS | 458 |
| Perforation Data: | Interval Top: | 6200 ft. | # Of Holes: | 1500 | Interval Bottom: | 15943 ft. | Hole Size: | 0.48 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 7869 |
Total Gas Produced (MCF) | 34549 |
GOR | 4390 |
GOR Determination | BOE |
Average BOE per Day | 37.829 |
Average MCFE per Day | 219.424 |
Federal Financial Assurance | i | |
|
|