|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 7/1/2018 Measured TD: 20385 ft. Vertical TD: 7088 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 7/1/2018 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 3/14/2018 | Proposed Top PZ Location: | Sec:1 Twp: 5N 66W | Footage: 495 FNL 1836 FEL | Bottom Hole Location: | Sec:13 Twp: 5N 66W | Footage: 2147 FNL 1865 FEL | Proposed Depth/Form: | 20504 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 800, Drill Unit: GWA | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 42 , Citings Type: PLANNED | Cement: | Sacks: 80, Top: 0 ft., Bottom: 100 ft. | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 400, Top: 0 ft., Bottom: 1500 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 20504 ft., Weight: 20 , Citings Type: PLANNED | Cement: | Sacks: 1960, Top: 1500 ft., Bottom: 20504 ft. |
| | |
Wellbore Completed | Completion Date: | 9/6/2017 | Spud Date: | 6/18/2017 | Spud Date Is: | ACTUAL | Measured TD: | 20385 ft. | Measured PB depth: | 20377 ft. | True Vertical TD: | 7088 ft. | True Vertical PB depth: | 7088 ft. | Top PZ Location: | Sec:1 Twp: 5N 66W | Footage: 495 FNL 1836 FEL | Bottom Hole Location: | Sec:13 Twp: 5N 66W | Footage: 2147 N 1865 E | Log Types: | CBL, Mud, MWD/LWD, Triple Combo. | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL | Cement: | Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1585 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 525, Top: 0 ft., Bottom: 1585 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 20377 ft., Weight: 20 , Citings Type: ACTUAL | Cement: | Sacks: 3250, Top: 142 ft., Bottom: 20377 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 3580 ft. | | N | N | SUSSEX | 4098 ft. | | N | N | SHANNON | 4784 ft. | | N | N | SHARON SPRINGS | 6716 ft. | | N | N | NIOBRARA | 6806 ft. | | N | N | FORT HAYS | 7289 ft. | | N | N | CODELL | 7465 ft. | | N | N |
Formation FTHYS Formation Classification: OW Status: CM - 9/25/2018 Interval Top: 9642 ft. Interval Bottom: 19671 ft. Completed Information for Formation FORT HAYS | 1st Production Date: | 8/10/2018 | Choke Size: | | Formation Name: | FORT HAYS | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 1/17/2018 | Treatment End Date: | 1/30/2018 | Treatment Summary: | Producing Intervals: 9642'-10184'; 13424'-13931'; 16909'-16972'; 17805'-18666'; 19441'-19671'. | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation FTHYS. |
| Perforation Data: | Interval Top: | 9642 ft. | # Of Holes: | 426 | Interval Bottom: | 19671 ft. | Hole Size: | 0.42 in. |
|
Formation CD-FH Formation Classification: OW Status: PR - 8/27/2018 Interval Top: 7483 ft. Interval Bottom: 20327 ft. Completed Information for Formation CODELL-FORT HAYS | 1st Production Date: | 8/10/2018 | Choke Size: | | Formation Name: | CODELL-FORT HAYS | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 1/17/2018 | Treatment End Date: | 1/30/2018 | Treatment Summary: | Frac'd Codell-Fort Hays with 65 stage plug and perf;
13000290 total lbs proppant pumped: 30/50 mesh sand;
22123 total bbls fluid pumped: 22112 bbls fresh water and 11 bbls 15% HCL acid. | Total fluid used in treatment (bbls): | 22123 | Max pressure during treatment (psi): | 9378 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.33 | Type Of gas: | | Number Of staged intervals: | 65 | Total acid used in treatment (bbls): | 11 | Min frac gradient (psi/ft): | 0.93 | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 14259 | Fresh water used in treatment (bbls): | 22112 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 13000290 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7427 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 8/27/2018 | Test Method: | flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 114 | BBLS_OIL | 410 | BTU_GAS | 1300 | CALC_BBLS_H2O | 114 | CALC_BBLS_OIL | 410 | CALC_GOR | 5720 | CALC_MCF_GAS | 2345 | CASING_PRESS | 3145 | GRAVITY_OIL | 40 | MCF_GAS | 2345 | TUBING_PRESS | 2917 |
| Perforation Data: | Interval Top: | 7483 ft. | # Of Holes: | 2267 | Interval Bottom: | 20327 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: OW Status: CM - 9/25/2018 Interval Top: 7483 ft. Interval Bottom: 20327 ft. Completed Information for Formation CODELL | 1st Production Date: | 8/10/2018 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 1/17/2018 | Treatment End Date: | 1/30/2018 | Treatment Summary: | Producing Intervals: 7483'-9614'; 10210'-13393'; 13963'-16862'; 17006'-17775'; 18710'-19411'; 19717'-20327'. | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7483 ft. | # Of Holes: | 1841 | Interval Bottom: | 20327 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 12138 |
Total Gas Produced (MCF) | 212733 |
GOR | 17526 |
GOR Determination | MCFE |
Average BOE per Day | 133.316 |
Average MCFE per Day | 773.251 |
Federal Financial Assurance | i | |
|
|