Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-42914
Well Classification: OW Status: PR - 8/1/2018
Well Name/No:CS-SCOTT #C4-1-13
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/1/2018
FacilityID:445156LocationID:430474
County:WELD #123Location:SWSE 36 6N66W 6
Field:WATTENBERG - #90750Elevation:4665 ft.
Planned Location:340FSL  1976 FELLat/Long: 40.438370 / -104.722970Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.438374 / -104.722971Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/31/2018
End Date: 2/13/2018
Reported: 2/22/2018
Days to report: 9
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 8/1/2018             Measured TD: 20417 ft.    Vertical TD: 7090 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 8/1/2018
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/14/2018
Proposed Top PZ Location:Sec:1 Twp: 5N 66W Footage: 492 FNL  2125 FWL
Bottom Hole Location:Sec:13 Twp: 5N 66W Footage: 2134 FNL  2098 FWL
Proposed Depth/Form:18752 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 800, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 20635 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 1900, Top: 1500 ft., Bottom: 20635 ft.

Wellbore Completed
Completion Date:8/9/2017
Spud Date:6/20/2017Spud Date Is:ACTUAL
Measured TD:20417 ft.Measured PB depth:20397 ft.
True Vertical TD:7090 ft.True Vertical PB depth:7090 ft.
Top PZ Location:Sec:1 Twp: 5N 66WFootage: 492 FNL  2125 FWL
Bottom Hole Location:Sec:13 Twp: 5N 66WFootage: 2134 N  2098 W
Log Types:CBL, Mud, MWD/LWD, (Triple Combo on 123-42915).
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1585 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 525, Top: 0 ft., Bottom: 1585 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 20402 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 3250, Top: 412 ft., Bottom: 20402 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3661 ft.NN
SUSSEX4201 ft.NN
SHANNON4895 ft.NN
SHARON SPRINGS6891 ft.NN
NIOBRARA6998 ft.NN
FORT HAYS7488 ft.NN
CODELL7634 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 9/27/2018                 Interval Top: 7654 ft.    Interval Bottom: 20353 ft.

 Completed Information for Formation CODELL
1st Production Date:8/9/2018Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/31/2018Treatment End Date:2/13/2018
Treatment Summary:Producing Intervals: 7654'-8794'; 9120'-12091'; 12628'-20353'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7654 ft.# Of Holes:2137
Interval Bottom:20353 ft.Hole Size:0.42 in.

Formation CD-FH                   Formation Classification:  OW                   Status:  PR - 8/27/2018                 Interval Top: 7528 ft.    Interval Bottom: 20353 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:8/9/2018Choke Size: 
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/31/2018Treatment End Date:2/13/2018
Treatment Summary:Frac'd Codell-Fort Hays with 65-stage plug-and-perf; 12999940 total lbs proppant pumped: 30/50 mesh sand; 21545 total bbls fluid pumped: 21533 bbls fresh water and 12 bbls 15% HCL acid.
Total fluid used in treatment (bbls):21545Max pressure during treatment (psi):9389
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:65
Total acid used in treatment (bbls):12Min frac gradient (psi/ft):0.97
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):10393
Fresh water used in treatment (bbls):21533Disposition method For flowback:DISPOSAL
Total proppant used (lbs):12999940Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7498 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/27/2018Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 100
BBLS_OIL 360
BTU_GAS 1300
CALC_BBLS_H2O 100
CALC_BBLS_OIL 360
CALC_GOR 5492
CALC_MCF_GAS 1977
CASING_PRESS 3193
GRAVITY_OIL 40
MCF_GAS 1977
TUBING_PRESS 2764
Perforation Data:
Interval Top:7528 ft.# Of Holes:2299
Interval Bottom:20353 ft.Hole Size:0.42 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 9/27/2018                 Interval Top: 7528 ft.    Interval Bottom: 12589 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:8/9/2018Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/31/2018Treatment End Date:2/13/2018
Treatment Summary:Producing Intervals: 7528'-7619'; 8824'-9085'; 12134'-12589'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:7528 ft.# Of Holes:162
Interval Bottom:12589 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)14390
Total Gas Produced (MCF)243150
GOR16897
GOR DeterminationMCFE
Average BOE per Day153.874
Average MCFE per Day892.455

 Federal Financial Assurance  i 

 Tribal Well  i No