Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-42875
Well Classification: OW Status: PR - 9/1/2025
Well Name/No:Horsetail #30E-3135
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:FUNDARE RESOURCES OPERATING COMPANY LLC - 10773
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/1/2025
FacilityID:445054LocationID:445049
County:WELD #123Location:LOT2 30 10N57W 6
Field:WILDCAT - #99999Elevation:4812 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2373FNL  629 FWLLat/Long: 40.810567 / -103.801125Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.810568 / -103.801143Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/26/2018
End Date: 4/5/2018
Reported: 9/3/2020
Originally Reported: 5/9/2018
Days to report: 882
Days to report: 34
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 9/1/2025             Measured TD: 14020 ft.    Vertical TD: 5896 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 9/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/3/2018
Proposed Top PZ Location:Sec:30 Twp: 10N 57W Footage: 2543 FSL  800 FWL
Bottom Hole Location:Sec:31 Twp: 10N 57W Footage: 100 FSL  660 FWL
Proposed Depth/Form:13926 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 535-508 , Unit Acreage: 960, Drill Unit: S/2 S30, All S31
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-508 , Unit Acreage: 960, Drill Unit: S/2 S30, All S31
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 65 , Citings Type: PLANNED
Cement:Sacks: 179, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1580 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 645, Top: 0 ft., Bottom: 1580 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 13926 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 2032, Top: 0 ft., Bottom: 13926 ft.

Wellbore Completed
Completion Date:10/10/2016
Spud Date:10/4/2016Spud Date Is:ACTUAL
Measured TD:14020 ft.Measured PB depth:13972 ft.
True Vertical TD:5896 ft.True Vertical PB depth:5896 ft.
Top PZ Location:Sec:30 Twp: 10N 57WFootage: 2413 FSL  792 FWL
Bottom Hole Location:Sec:31 Twp: 10N 57WFootage: 101 FSL  668 FWL
Log Types:MWD/LWD, Mud Log, CBL
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 101 ft., Weight: 65 , Citings Type: ACTUAL
Cement:Sacks: 153, Top: 0 ft., Bottom: 101 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2060 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 670, Top: 0 ft., Bottom: 2060 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 14020 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2420, Top: 1490 ft., Bottom: 14020 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PIERRE1402 ft.NN
HYGIENE3139 ft.NN
SHARON SPRINGS5595 ft.NN
NIOBRARA5601 ft.NN
FORT HAYS5852 ft.NN
CODELL5885 ft.NN
CARLILE5897 ft.NN

Formation CARL                     Formation Classification:  OW                     Status:  PR - 9/1/2025                  Interval Top: 9453 ft.    Interval Bottom: 9489 ft.

 Completed Information for Formation CARLILE
1st Production Date:5/25/2018Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:9/22/2020Treatment End Date:N/A
Treatment Summary:Completed Depths: 9453'-9489' (20 shots)
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:9453 ft.# Of Holes:20
Interval Bottom:9489 ft.Hole Size:0.375 in.

Formation CODL                     Formation Classification:  OW                     Status:  PR - 9/22/2020                 Interval Top: 6964 ft.    Interval Bottom: 13928 ft.

 Completed Information for Formation CODELL
1st Production Date:5/25/2018Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:9/22/2020Treatment End Date:N/A
Treatment Summary:Completed Depths: 6964'-9412' (650 shots); 9539'-11417' (500 shots); 11636'-12764' (300 shots); 13223'-13928' (199 shots)
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:6964 ft.# Of Holes:1649
Interval Bottom:13928 ft.Hole Size:0.375 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  CM - 7/1/2018                  Interval Top: 6344 ft.    Interval Bottom: 13928 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:5/25/2018Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/26/2018Treatment End Date:4/5/2018
Treatment Summary:50 Stage Plug & Perf, 1206872 lbs 100 Mesh, 4911717 lbs 40/70 Prem White sand, 60 bbls 15% HCl, 236381 bbls slickwater
Total fluid used in treatment (bbls):236441Max pressure during treatment (psi):7855
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:50
Total acid used in treatment (bbls):60Min frac gradient (psi/ft):0.80
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):6423
Fresh water used in treatment (bbls):236381Disposition method For flowback:DISPOSAL
Total proppant used (lbs):6118589Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:5852 ft.
Tubing Packer Depth:5835 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/1/2018Test Method:Separator
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 375
BBLS_OIL 187
BTU_GAS 1432
CALC_BBLS_H2O 375
CALC_BBLS_OIL 187
CALC_GOR 513
CALC_MCF_GAS 96
CASING_PRESS 900
GRAVITY_OIL 37
MCF_GAS 96
TUBING_PRESS 400
Perforation Data:
Interval Top:6344 ft.# Of Holes:1999
Interval Bottom:13928 ft.Hole Size:0.375 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  PR - 9/22/2020                 Interval Top: 6344 ft.    Interval Bottom: 13178 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:5/25/2018Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:9/22/2020Treatment End Date:N/A
Treatment Summary:Completed Depths: 6344'-6933' (170 shots); 11450'-11604' (50 shots); 12790'-13178' (110 shots)
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:6344 ft.# Of Holes:330
Interval Bottom:13178 ft.Hole Size:0.375 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
September 2024 - August 2025i
Total Oil Produced (Barrels)4244
Total Gas Produced (MCF)6053
GOR1426
GOR DeterminationBOE
Average BOE per Day14.500
Average MCFE per Day84.128

 Federal Financial Assurance  i 

 Tribal Well  i No