|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 9/1/2025 Measured TD: 14020 ft. Vertical TD: 5896 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 9/1/2025 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 3/3/2018 | | Proposed Top PZ Location: | Sec:30 Twp: 10N 57W | Footage: 2543 FSL 800 FWL | | Bottom Hole Location: | Sec:31 Twp: 10N 57W | Footage: 100 FSL 660 FWL | | Proposed Depth/Form: | 13926 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 535-508 , Unit Acreage: 960, Drill Unit: S/2 S30, All S31 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 535-508 , Unit Acreage: 960, Drill Unit: S/2 S30, All S31 | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 65 , Citings Type: PLANNED | | Cement: | Sacks: 179, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1580 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 645, Top: 0 ft., Bottom: 1580 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 13926 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 2032, Top: 0 ft., Bottom: 13926 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/10/2016 | | Spud Date: | 10/4/2016 | Spud Date Is: | ACTUAL | | Measured TD: | 14020 ft. | Measured PB depth: | 13972 ft. | | True Vertical TD: | 5896 ft. | True Vertical PB depth: | 5896 ft. | | Top PZ Location: | Sec:30 Twp: 10N 57W | Footage: 2413 FSL 792 FWL | | Bottom Hole Location: | Sec:31 Twp: 10N 57W | Footage: 101 FSL 668 FWL | | Log Types: | MWD/LWD, Mud Log, CBL | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 101 ft., Weight: 65 , Citings Type: ACTUAL | | Cement: | Sacks: 153, Top: 0 ft., Bottom: 101 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2060 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 670, Top: 0 ft., Bottom: 2060 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 14020 ft., Weight: 20 , Citings Type: ACTUAL | | Cement: | Sacks: 2420, Top: 1490 ft., Bottom: 14020 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PIERRE | 1402 ft. | | N | N | | HYGIENE | 3139 ft. | | N | N | | SHARON SPRINGS | 5595 ft. | | N | N | | NIOBRARA | 5601 ft. | | N | N | | FORT HAYS | 5852 ft. | | N | N | | CODELL | 5885 ft. | | N | N | | CARLILE | 5897 ft. | | N | N |
Formation CARL Formation Classification: OW Status: PR - 9/1/2025 Interval Top: 9453 ft. Interval Bottom: 9489 ft.| Completed Information for Formation CARLILE | | 1st Production Date: | 5/25/2018 | Choke Size: | | | Formation Name: | CARLILE | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 9/22/2020 | Treatment End Date: | N/A | | Treatment Summary: | Completed Depths: 9453'-9489' (20 shots) | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CARL. |
| | Perforation Data: | | Interval Top: | 9453 ft. | # Of Holes: | 20 | | Interval Bottom: | 9489 ft. | Hole Size: | 0.375 in. |
|
Formation CODL Formation Classification: OW Status: PR - 9/22/2020 Interval Top: 6964 ft. Interval Bottom: 13928 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 5/25/2018 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 9/22/2020 | Treatment End Date: | N/A | | Treatment Summary: | Completed Depths: 6964'-9412' (650 shots); 9539'-11417' (500 shots); 11636'-12764' (300 shots); 13223'-13928' (199 shots) | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 6964 ft. | # Of Holes: | 1649 | | Interval Bottom: | 13928 ft. | Hole Size: | 0.375 in. |
|
Formation CLCDFH Formation Classification: OW Status: CM - 7/1/2018 Interval Top: 6344 ft. Interval Bottom: 13928 ft.| Completed Information for Formation CARLILE-CODELL-FORT HAYS | | 1st Production Date: | 5/25/2018 | Choke Size: | | | Formation Name: | CARLILE-CODELL-FORT HAYS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 3/26/2018 | Treatment End Date: | 4/5/2018 | | Treatment Summary: | 50 Stage Plug & Perf, 1206872 lbs 100 Mesh, 4911717 lbs 40/70 Prem White sand, 60 bbls 15% HCl, 236381 bbls slickwater | | Total fluid used in treatment (bbls): | 236441 | Max pressure during treatment (psi): | 7855 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.33 | | Type Of gas: | | Number Of staged intervals: | 50 | | Total acid used in treatment (bbls): | 60 | Min frac gradient (psi/ft): | 0.80 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 6423 | | Fresh water used in treatment (bbls): | 236381 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 6118589 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 5852 ft. | | Tubing Packer Depth: | 5835 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/1/2018 | Test Method: | Separator | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 375 | | BBLS_OIL | 187 | | BTU_GAS | 1432 | | CALC_BBLS_H2O | 375 | | CALC_BBLS_OIL | 187 | | CALC_GOR | 513 | | CALC_MCF_GAS | 96 | | CASING_PRESS | 900 | | GRAVITY_OIL | 37 | | MCF_GAS | 96 | | TUBING_PRESS | 400 |
| | Perforation Data: | | Interval Top: | 6344 ft. | # Of Holes: | 1999 | | Interval Bottom: | 13928 ft. | Hole Size: | 0.375 in. |
|
Formation FTHYS Formation Classification: OW Status: PR - 9/22/2020 Interval Top: 6344 ft. Interval Bottom: 13178 ft.| Completed Information for Formation FORT HAYS | | 1st Production Date: | 5/25/2018 | Choke Size: | | | Formation Name: | FORT HAYS | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 9/22/2020 | Treatment End Date: | N/A | | Treatment Summary: | Completed Depths: 6344'-6933' (170 shots); 11450'-11604' (50 shots); 12790'-13178' (110 shots) | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation FTHYS. |
| | Perforation Data: | | Interval Top: | 6344 ft. | # Of Holes: | 330 | | Interval Bottom: | 13178 ft. | Hole Size: | 0.375 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 4244 |
| Total Gas Produced (MCF) | 6053 |
| GOR | 1426 |
| GOR Determination | BOE |
| Average BOE per Day | 14.500 |
| Average MCFE per Day | 84.128 |
| Federal Financial Assurance | i | |
|
|