Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-42872
Well Classification: OW Status: PR - 6/12/2018
Well Name/No:Horsetail #30E-3104
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:FUNDARE RESOURCES OPERATING COMPANY LLC - 10773
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/12/2018
FacilityID:445051LocationID:445049
County:WELD #123Location:LOT2 30 10N57W 6
Field:DJ HORIZONTAL NIOBRARA - #16950Elevation:4812 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2372FNL  719 FWLLat/Long: 40.810567 / -103.800800Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.810592 / -103.800806Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/25/2018
End Date: 4/5/2018
Reported: 10/12/2018
Originally Reported: 5/9/2018
Days to report: 190
Days to report: 34
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 6/12/2018             Measured TD: 13827 ft.    Vertical TD: 5671 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 6/12/2018
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/3/2018
Proposed Top PZ Location:Sec:30 Twp: 10N 57W Footage: 2543 FSL  1307 FWL
Bottom Hole Location:Sec:31 Twp: 10B 57W Footage: 100 FSL  1155 FWL
Proposed Depth/Form:13743 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-508 , Unit Acreage: 960, Drill Unit: S/2 S30, All S31
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 65 , Citings Type: PLANNED
Cement:Sacks: 179, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1580 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 645, Top: 0 ft., Bottom: 1580 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 13743 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 2006, Top: 0 ft., Bottom: 13743 ft.

Wellbore Completed
Completion Date:9/23/2016
Spud Date:9/18/2016Spud Date Is:ACTUAL
Measured TD:13827 ft.Measured PB depth:13779 ft.
True Vertical TD:5671 ft.True Vertical PB depth:5671 ft.
Top PZ Location:Sec:30 Twp: 10N 57WFootage: 2442 FSL  1314 FWL
Bottom Hole Location:Sec:31 Twp: 10N 57WFootage: 100 FSL  1159 FWL
Log Types:LWD, Mud, CBL
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 101 ft., Weight: 65 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 101 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2104 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 670, Top: 0 ft., Bottom: 2104 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 13825 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2755, Top: 65 ft., Bottom: 13825 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PIERRE1410 ft.NN
HYGIENE3164 ft.NN
SHARON SPRINGS5733 ft.NN
NIOBRARA5741 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 6/12/2018                 Interval Top: 6125 ft.    Interval Bottom: 13735 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:5/23/2018Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/25/2018Treatment End Date:4/5/2018
Treatment Summary:50 Stage Plug & Perf, 931192# 100 Mesh, 3812697# 40/70 Prem White sand, 71 bbls 15% HCl, 195123 bbls slickwater
Total fluid used in treatment (bbls):195194Max pressure during treatment (psi):7818
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:50
Total acid used in treatment (bbls):71Min frac gradient (psi/ft):0.80
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):5305
Fresh water used in treatment (bbls):195123Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4743889Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:5646 ft.
Tubing Packer Depth:5630 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/12/2018Test Method:Separator
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 869
BBLS_OIL 273
BTU_GAS 1457
CALC_BBLS_H2O 869
CALC_BBLS_OIL 273
CALC_GOR 293
CALC_MCF_GAS 80
CASING_PRESS 860
GRAVITY_OIL 35
MCF_GAS 80
TUBING_PRESS 300
Perforation Data:
Interval Top:6125 ft.# Of Holes:2008
Interval Bottom:13735 ft.Hole Size:0.375 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
September 2024 - August 2025i
Total Oil Produced (Barrels)4962
Total Gas Produced (MCF)26286
GOR5297
GOR DeterminationBOE
Average BOE per Day26.000
Average MCFE per Day150.802

 Federal Financial Assurance  i 

 Tribal Well  i No