Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-42862
Well Classification: OW Status: PR - 10/9/2017
Well Name/No:Gillham #18Y-202
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/9/2017
FacilityID:445028LocationID:445032
County:WELD #123Location:SESE 18 5N64W 6
Field:WATTENBERG - #90750Elevation:4625 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:883FSL  444 FELLat/Long: 40.394323 / -104.584991Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.394320 / -104.584990Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/28/2017
End Date: 9/6/2017
Reported: 10/5/2017
Days to report: 29
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 10/9/2017             Measured TD: 12242 ft.    Vertical TD: 6666 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 10/9/2017
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/1/2018
Proposed Top PZ Location:Sec:18 Twp: 5N 64W Footage: 220 FSL  233 FEL
Bottom Hole Location:Sec:17 Twp: 5N 64W Footage: 167 FSL  500 FEL
Proposed Depth/Form:12221 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 400, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1600 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 920, Top: 0 ft., Bottom: 1600 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12221 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2035, Top: 0 ft., Bottom: 12221 ft.

Wellbore Completed
Completion Date:5/27/2017
Spud Date:5/21/2017Spud Date Is:ACTUAL
Measured TD:12242 ft.Measured PB depth:12206 ft.
True Vertical TD:6666 ft.True Vertical PB depth:6666 ft.
Top PZ Location:Sec:18 Twp: 5N 64WFootage: 218 FSL  74 FEL
Bottom Hole Location:Sec:17 Twp: 5N 64WFootage: 156 FSL  500 FEL
Log Types:CBL, MWD, (DIL in 123-18880)
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1675 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 780, Top: 0 ft., Bottom: 1675 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12220 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2140, Top: 760 ft., Bottom: 12220 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3590 ft.
SUSSEX4309 ft.
SHANNON4946 ft.
SHARON SPRINGS6537 ft.
NIOBRARA6708 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 10/9/2017                 Interval Top: 7334 ft.    Interval Bottom: 12220 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/2/2017Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/28/2017Treatment End Date:9/6/2017
Treatment Summary:29 Stage Plug and Perf, Perf'd from 7,334'-12,030', 1 Toe Sleeve @ 12,139' Total Fluid: 95,170 bbls Gel Fluid: 57,770 bbls Slickwater Fluid: 36,787 bbls 15% HCl Acid: 613 bbls Total Proppant: 5,500,000 lbs Silica Proppant: 5,500,000 lbs Method for determining flowback: measuring flowback tank volumes.
Total fluid used in treatment (bbls):95170Max pressure during treatment (psi):4304
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:29
Total acid used in treatment (bbls):613Min frac gradient (psi/ft):0.99
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):3762
Fresh water used in treatment (bbls):94557Disposition method For flowback:DISPOSAL
Total proppant used (lbs):5500000Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6825 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/9/2017Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 143
BBLS_OIL 327
BTU_GAS 1282
CALC_BBLS_H2O 143
CALC_BBLS_OIL 327
CALC_GOR 3000
CALC_MCF_GAS 981
CASING_PRESS 2791
GRAVITY_OIL 51
MCF_GAS 981
TUBING_PRESS 2200
Perforation Data:
Interval Top:7334 ft.# Of Holes:1008
Interval Bottom:12220 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)4269
Total Gas Produced (MCF)73390
GOR17191
GOR DeterminationMCFE
Average BOE per Day46.475
Average MCFE per Day269.545

 Federal Financial Assurance  i 

 Tribal Well  i No