Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-42838
Well Classification: OW Status: PR - 12/1/2025
Well Name/No:SWARTZ #1N-12HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/1/2025
FacilityID:444970LocationID:444965
County:WELD #123Location:SESE 13 2N65W 6
Field:WATTENBERG - #90750Elevation:4956 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:309FSL  518 FELLat/Long: 40.131977 / -104.604795Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.131977 / -104.604794Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/22/2017
End Date: 11/2/2017
Reported: 12/18/2017
Days to report: 46
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 12/1/2025             Measured TD: 17486 ft.    Vertical TD: 7049 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 12/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:2/26/2018
Proposed Top PZ Location:Sec:13 Twp: 2N 65W Footage: 734 FSL  945 FEL
Bottom Hole Location:Sec:1 Twp: 2N 65W Footage: 379 FSL  717 FEL
Proposed Depth/Form:16812 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 600, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42.1 , Citings Type: PLANNED
Cement:Sacks: 30, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 590, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 17536 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 2078, Top: , Bottom: 17536 ft.

Wellbore Completed
Completion Date:6/28/2017
Spud Date:4/2/2017Spud Date Is:ACTUAL
Measured TD:17486 ft.Measured PB depth:17474 ft.
True Vertical TD:7049 ft.True Vertical PB depth:7050 ft.
Top PZ Location:Sec:13 Twp: 2N 65WFootage: 734 FSL  945 FEL
Bottom Hole Location:Sec:1 Twp: 2N 65WFootage: 379 FSL  717 FEL
Log Types:CBL, MWD/GR, (CNL in 05-123-42836, RESISTIVITY in 05-123-21895)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 97 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 97 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1858 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 727, Top: 0 ft., Bottom: 1858 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 17476 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1790, Top: 39 ft., Bottom: 17476 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4475 ft.
SHARON SPRINGS6962 ft.
NIOBRARA7058 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 12/1/2025                 Interval Top: 7338 ft.    Interval Bottom: 17427 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:11/20/2017Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/22/2017Treatment End Date:11/2/2017
Treatment Summary:PERF AND FRAC FROM 7,338 -17,427. 729 BBL 7.5% HCL ACID,12,391 BBL BIO WATER, 275,525 BBL SLICKWATER, 288,644 TOTAL FLUID, 8,244,300 # 40/70 OTTAWA/ ST. PETERS, 8,244,300# TOTAL SAND.
Total fluid used in treatment (bbls):288644Max pressure during treatment (psi):8000
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:38
Total acid used in treatment (bbls):729Min frac gradient (psi/ft):0.95
Recycled water used in treatment (bbls):4050Total flowback volume recovered (bbls):3391
Fresh water used in treatment (bbls):283866Disposition method For flowback:RECYCLE
Total proppant used (lbs):8244301Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/30/2017Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 345
BBLS_OIL 72
BTU_GAS 1384
CALC_BBLS_H2O 345
CALC_BBLS_OIL 72
CALC_GOR 1625
CALC_MCF_GAS 117
CASING_PRESS 1800
GRAVITY_OIL 52
MCF_GAS 117
Perforation Data:
Interval Top:7338 ft.# Of Holes:1161
Interval Bottom:17427 ft.Hole Size:0.44 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
01/2025 - 12/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)5
Total Gas Produced (MCF)26
GOR5200
GOR DeterminationBOE
Average BOE per Day0.232
Average MCFE per Day1.346

 Federal Financial Assurance  i 

 Tribal Well  i No