Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-42666
Well Classification: OW Status: PR - 9/11/2017
Well Name/No:JZM #29N-W3HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/11/2017
FacilityID:444603LocationID:437614
Municipality/County:FORT LUPTON / WELD #123Location:SWSW 10 1N67W 6
Field:WATTENBERG - #90750Elevation:5066 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:265FSL  880 FWLLat/Long: 40.059000 / -104.883174Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.059000 / -104.883177Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/6/2017
End Date: 8/14/2017
Reported: 9/13/2017
Days to report: 30
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 9/11/2017             Measured TD: 17565 ft.    Vertical TD: 7484 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 9/11/2017
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:1/19/2018
Proposed Top PZ Location:Sec:10 Twp: 1N 67W Footage: 948 FSL  1226 FWL
Bottom Hole Location:Sec:3 Twp: 1N 67W Footage: 50 FNL  1200 FWL
Proposed Depth/Form:17548 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 720, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1800 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 680, Top: 0 ft., Bottom: 1800 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7898 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 890, Top: 0 ft., Bottom: 7898 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6798 ft., Depth: 17548 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 700, Top: , Bottom: 17548 ft.

Wellbore Completed
Completion Date:12/21/2016
Spud Date:11/20/2016Spud Date Is:ACTUAL
Measured TD:17565 ft.Measured PB depth:17506 ft.
True Vertical TD:7484 ft.True Vertical PB depth:7489 ft.
Top PZ Location:Sec:10 Twp: 1N 67WFootage: 931 FSL  1229 FWL
Bottom Hole Location:Sec:3 Twp: 1N 67WFootage: 27 FNL  1181 FWL
Log Types:CBL, MWD/GR, (IND in 05-123-07214, CNL in 05-123-39627)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 97 ft., Weight: 42.1 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 97 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2233 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 873, Top: 0 ft., Bottom: 2233 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17555 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 2395, Top: 28 ft., Bottom: 17555 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4650 ft.
SHARON SPRINGS7375 ft.
NIOBRARA7435 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 9/11/2017                 Interval Top: 7825 ft.    Interval Bottom: 17336 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/1/2017Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/6/2017Treatment End Date:8/14/2017
Treatment Summary:"PERF AND FRAC FROM 7825-17,336. 686 BBL 7.5% HCL ACID, 11,099 BBL PUMP DOWN, 260,516 BBL SLICKWATER, - 272301 TOTAL FLUID 7,909,812# 40/70 OTTAWA/ST. PETERS, - 7,909,812# TOTAL SAND."
Total fluid used in treatment (bbls):272301Max pressure during treatment (psi):7593
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:36
Total acid used in treatment (bbls):686Min frac gradient (psi/ft):0.90
Recycled water used in treatment (bbls):22892Total flowback volume recovered (bbls):2562
Fresh water used in treatment (bbls):248723Disposition method For flowback:RECYCLE
Total proppant used (lbs):7909812Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/11/2017Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 352
BBLS_OIL 172
BTU_GAS 1322
CALC_BBLS_H2O 352
CALC_BBLS_OIL 172
CALC_GOR 1180
CALC_MCF_GAS 203
CASING_PRESS 900
GRAVITY_OIL 55
MCF_GAS 203
Perforation Data:
Interval Top:7825 ft.# Of Holes:858
Interval Bottom:17336 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)2599
Total Gas Produced (MCF)74926
GOR28828
GOR DeterminationMCFE
Average BOE per Day41.312
Average MCFE per Day239.629

 Federal Financial Assurance  i 

 Tribal Well  i No