|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 9/5/2017 Measured TD: 18056 ft. Vertical TD: 7724 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 9/5/2017 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 12/16/2017 | | Proposed Top PZ Location: | Sec:26 Twp: 1N 67W | Footage: 343 FNL 1123 FWL | | Bottom Hole Location: | Sec:35 Twp: 1N 67W | Footage: 465 FSL 1090 FWL | | Proposed Depth/Form: | 17849 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 720, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1817 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 680, Top: 0 ft., Bottom: 1817 ft. | | Casing: | String Type: 1ST, Hole Size: 8.875 in., Size: 7 in., Top: 0 ft., Depth: 8104 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 910, Top: 0 ft., Bottom: 8104 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7006 ft., Depth: 17849 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 710, Top: , Bottom: 17849 ft. |
| | |
| Wellbore Completed | | Completion Date: | 2/28/2017 | | Spud Date: | 1/15/2017 | Spud Date Is: | ACTUAL | | Measured TD: | 18056 ft. | Measured PB depth: | 17954 ft. | | True Vertical TD: | 7724 ft. | True Vertical PB depth: | 7725 ft. | | Top PZ Location: | Sec:26 Twp: 1N 67W | Footage: 214 FNL 1106 FWL | | Bottom Hole Location: | Sec:35 Twp: 1N 67W | Footage: 467 FSL 954 FWL | | Log Types: | CBL, MWD/GR, (RESISTIVITY in API 05-123-42568) | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 112 ft., Weight: 42 , Citings Type: ACTUAL | | Cement: | Sacks: 64, Top: 0 ft., Bottom: 112 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2235 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 874, Top: 0 ft., Bottom: 2235 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18047 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 2475, Top: 524 ft., Bottom: 18047 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4750 ft. | | | | | SHARON SPRINGS | 7326 ft. | | | | | NIOBRARA | 7347 ft. | | | | | FORT HAYS | 7848 ft. | | | | | CODELL | 7941 ft. | | | | | CARLILE | 8084 ft. | | | |
Formation CODL Formation Classification: OW Status: CM - 10/6/2017 Interval Top: 8262 ft. Interval Bottom: 17845 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 10/6/2017 | Treatment End Date: | N/A | | Treatment Summary: | CODELL: 8262-10,682; 11,825-11,854; 12,238-12,671; 13,361-13,665; 16,137-17,845"
| | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 8262 ft. | # Of Holes: | 453 | | Interval Bottom: | 17845 ft. | Hole Size: | 0.44 in. |
|
Formation CARL Formation Classification: OW Status: CM - 10/6/2017 Interval Top: 8167 ft. Interval Bottom: 16137 ft.| Completed Information for Formation CARLILE | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CARLILE | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 10/6/2017 | Treatment End Date: | N/A | | Treatment Summary: | CARLILE: 8167-8262; 10,682-11,825; 11,854-12,238; 12,671-13,361; 13,665-16,137;
| | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CARL. |
| | Perforation Data: | | Interval Top: | 8167 ft. | # Of Holes: | 453 | | Interval Bottom: | 16137 ft. | Hole Size: | 0.44 in. |
|
Formation CD-CRL Formation Classification: OW Status: PR - 9/5/2017 Interval Top: 8167 ft. Interval Bottom: 17845 ft.| Completed Information for Formation CODELL-CARLILE | | 1st Production Date: | 8/28/2017 | Choke Size: | | | Formation Name: | CODELL-CARLILE | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 7/24/2017 | Treatment End Date: | 7/29/2017 | | Treatment Summary: | "PERF AND FRAC FROM 8167-17,845.
48 BBL 7.5% HCL ACID, 5724 BBL PUMP DOWN, 170746 BBL SLICKWATER, - 176,517 TOTAL FLUID
5,294,650# 40/70 OTTAWA/ST. PETERS, - 5,294,650# TOTAL SAND.
| | Total fluid used in treatment (bbls): | 176517 | Max pressure during treatment (psi): | 7806 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 23 | | Total acid used in treatment (bbls): | 48 | Min frac gradient (psi/ft): | 0.85 | | Recycled water used in treatment (bbls): | 5514 | Total flowback volume recovered (bbls): | 839 | | Fresh water used in treatment (bbls): | 170956 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 5294650 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/5/2017 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 286 | | BBLS_OIL | 67 | | BTU_GAS | 1304 | | CALC_BBLS_H2O | 286 | | CALC_BBLS_OIL | 67 | | CALC_GOR | 1776 | | CALC_MCF_GAS | 119 | | CASING_PRESS | 1300 | | GRAVITY_OIL | 53 | | MCF_GAS | 119 |
| | Perforation Data: | | Interval Top: | 8167 ft. | # Of Holes: | 453 | | Interval Bottom: | 17845 ft. | Hole Size: | 0.44 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 1385 |
| Total Gas Produced (MCF) | 21081 |
| GOR | 15220 |
| GOR Determination | MCFE |
| Average BOE per Day | 13.739 |
| Average MCFE per Day | 79.662 |
| Federal Financial Assurance | i | |
|
|