|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: DG - 5/1/2017 Measured TD: 16788 ft. Vertical TD: 7157 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW DG - 5/1/2017 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 12/13/2017 | | Proposed Top PZ Location: | Sec:23 Twp: 6N 67W | Footage: 620 FNL 460 FWL | | Bottom Hole Location: | Sec:24 Twp: 6N 67W | Footage: 620 FNL 460 FEL | | Proposed Depth/Form: | 17262 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 640, Drill Unit: GWA | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 400, Top: 0 ft., Bottom: 1500 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 17262 ft., Weight: 20 , Citings Type: PLANNED | | Cement: | Sacks: 1600, Top: 1500 ft., Bottom: 17262 ft. |
| | |
| Wellbore Completed | | Completion Date: | 2/22/2017 | | Spud Date: | 2/22/2017 | Spud Date Is: | ACTUAL | | Measured TD: | 16788 ft. | Measured PB depth: | 16788 ft. | | True Vertical TD: | 7157 ft. | True Vertical PB depth: | 7157 ft. | | Bottom Hole Location: | Sec:24 Twp: 6N 67W | Footage: 624 FNL 873 FEL | | Log Types: | Dual Induction | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1575 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 625, Top: 0 ft., Bottom: 1575 ft., Determination Method: VISU | | Casing: | String Type: OPEN HOLE, Hole Size: 7.875 in., Size: , Top: 1575 ft., Depth: 16788 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3580 ft. | | N | N | | SUSSEX | 4115 ft. | | N | N | | SHANNON | 4680 ft. | | N | N | | SHARON SPRINGS | 6972 ft. | | N | N | | NIOBRARA | 7014 ft. | | N | N | | FORT HAYS | 7487 ft. | | N | N | | CODELL | 7593 ft. | | N | N | | No formation data to display. |
Sidetrack #01 Wellbore Classification: OW Status: PR - 1/1/2022 Measured TD: 13374 ft. Vertical TD: 7171 ft.| Wellbore Data for Sidetrack #01 | Wellbore Classification: OW PR - 1/1/2022 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 3/8/2019 | | Proposed Top PZ Location: | Sec:23 Twp: 6N 67W | Footage: 620 FNL 460 FWL | | Bottom Hole Location: | Sec:24 Twp: 6N 67W | Footage: 620 FNL 460 FEL | | Proposed Depth/Form: | 17262 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 650, Drill Unit: GWA | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1550 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 400, Top: 0 ft., Bottom: 1500 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 17262 ft., Weight: 20 , Citings Type: PLANNED | | Cement: | Sacks: 1600, Top: 1500 ft., Bottom: 17262 ft. |
| | |
| Wellbore Completed | | Completion Date: | 3/10/2017 | | Spud Date: | 2/22/2017 | Spud Date Is: | ACTUAL | | Measured TD: | 13374 ft. | Measured PB depth: | 13362 ft. | | True Vertical TD: | 7171 ft. | True Vertical PB depth: | 7171 ft. | | Top PZ Location: | Sec:23 Twp: 6N 67W | Footage: 626 FNL 510 FWL | | Bottom Hole Location: | Sec:23 Twp: 6N 67W | Footage: 675 FNL 1009 FWL | | Log Types: | MUD, MWD, CBL, (Dual Induction attached to original wellbore). | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1575 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 625, Top: 0 ft., Bottom: 1575 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 13367 ft., Weight: 20 , Citings Type: ACTUAL | | Cement: | Sacks: 1772, Top: 700 ft., Bottom: 13367 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | FORT HAYS | 7487 ft. | | N | N | | CODELL | 7593 ft. | | N | N |
Formation CODL Formation Classification: OW Status: PR - 1/1/2022 Interval Top: 7631 ft. Interval Bottom: 13315 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 1/12/2018 | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 7/8/2017 | Treatment End Date: | 7/13/2017 | | Treatment Summary: | 39 stage plug and perf;
99384 total bbls fluid pumped: 94013 bbls fresh water, 5359 bbls recycled water, and 12 bbls 15% HCl acid;
5852050 total lbs of 30/50 proppant pumped. | | Total fluid used in treatment (bbls): | 99384 | Max pressure during treatment (psi): | 8601 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.32 | | Type Of gas: | | Number Of staged intervals: | 39 | | Total acid used in treatment (bbls): | 12 | Min frac gradient (psi/ft): | 0.97 | | Recycled water used in treatment (bbls): | 5359 | Total flowback volume recovered (bbls): | 4418 | | Fresh water used in treatment (bbls): | 94013 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 5852050 | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7533 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/5/2017 | Test Method: | | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 352 | | BBLS_OIL | 463 | | BTU_GAS | 1285 | | CALC_BBLS_H2O | 352 | | CALC_BBLS_OIL | 463 | | CALC_GOR | 1475 | | CALC_MCF_GAS | 683 | | CASING_PRESS | 455 | | GRAVITY_OIL | 43 | | MCF_GAS | 683 | | TUBING_PRESS | 1385 |
| | Perforation Data: | | Interval Top: | 7631 ft. | # Of Holes: | 1369 | | Interval Bottom: | 13315 ft. | Hole Size: | 0.44 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 2969 |
| Total Gas Produced (MCF) | 52070 |
| GOR | 17537 |
| GOR Determination | MCFE |
| Average BOE per Day | 32.538 |
| Average MCFE per Day | 188.730 |
| Federal Financial Assurance | i | |
|
|