Wellbore #00 Wellbore Classification: OW Status: PR - 2/1/2023 Measured TD: 11964 ft. Vertical TD: 6754 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 2/1/2023 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 11/15/2017 | Prop Depth/Form: | 11869 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 200, Drill Unit: GWA | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED | Cement: | Sacks: 6, Top: 0 ft., Bottom: 80 ft. | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 1850 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 535, Top: 0 ft., Bottom: 1850 ft. | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12021 ft., Weight: 20 , Citings Type: PLANNED | Cement: | Sacks: 1182, Top: , Bottom: | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6957 ft., Depth: 11869 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: |
| | |
Wellbore Completed | Completion Date: | 4/27/2016 | Spud Date: | 4/26/2016 | Spud Date Is: | ACTUAL | Measured TD: | 11964 ft. | Measured PB depth: | 11910 ft. | True Vertical TD: | 6754 ft. | True Vertical PB depth: | 6754 ft. | Top PZ Location: | Sec:22 Twp: 6N 63W | Footage: 2155 FNL 445 FWL | Depth | Bottom Hole Location: | Sec:23 Twp: 6N 63W | Footage: 2161 FNL 234 FEL | Depth | Log Types: | CBL, MWD/LWD, Mud, Compensated neutron, (DIL in 05-123-31896) | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 104 ft., Weight: 42.09 , Citings Type: ACTUAL | Cement: | Sacks: 64, Top: 0 ft., Bottom: 104 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1896 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 737, Top: 0 ft., Bottom: 1896 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 10954 ft., Weight: 20 , Citings Type: ACTUAL | Cement: | Sacks: 1330, Top: 612 ft., Bottom: 11954 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PIERRE | 446 ft. | | | | PARKMAN | 3563 ft. | | | | SUSSEX | 4307 ft. | | | | NIOBRARA | 6573 ft. | | | | NIOBRARA-FT HAYS | 7007 ft. | | | | CODELL | 10053 ft. | | | |
Formation CODL Formation Classification: OW Status: CM - 12/16/2016 Interval Top: 8471 ft. Interval Bottom: 11764 ft. Completed Information for Formation CODELL | 1st Production Date: | 8/27/2016 | Choke Size: | | Formation Name: | CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 7/17/2016 | Treatment End Date: | 8/4/2016 | Treatment Summary: | Codell Perf intervals:8471-8527, 11658-11764 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 8471 ft. | # Of Holes: | 36 | Interval Bottom: | 11764 ft. | Hole Size: | 0.8 in. |
|
Formation FTHYS Formation Classification: OW Status: CM - 12/16/2016 Interval Top: 7088 ft. Interval Bottom: 11633 ft. Completed Information for Formation FORT HAYS | 1st Production Date: | 8/27/2016 | Choke Size: | | Formation Name: | FORT HAYS | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 7/17/2016 | Treatment End Date: | 8/4/2016 | Treatment Summary: | Ft. Hays Perf intervals:7088-8444, 8586-11633 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation FTHYS. |
| Perforation Data: | Interval Top: | 7088 ft. | # Of Holes: | 571 | Interval Bottom: | 11633 ft. | Hole Size: | 0.8 in. |
|
Formation NBFHC Formation Classification: OW Status: PR - 2/1/2023 Interval Top: 6951 ft. Interval Bottom: 11764 ft. Completed Information for Formation NIOBRARA-FT HAYS-CODELL | 1st Production Date: | 8/27/2016 | Choke Size: | | Formation Name: | NIOBRARA-FT HAYS-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 7/17/2016 | Treatment End Date: | 8/4/2016 | Treatment Summary: | Niobrara-Ft. Hays- Codell formation was frac'd with 12519949 lb Ottawa Sand, 15410656 gal Silverstem and slickwater, 130 bbls HCL 28% | Total fluid used in treatment (bbls): | 366920 | Max pressure during treatment (psi): | 8831 | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.43 | Type Of gas: | | Number Of staged intervals: | 22 | Total acid used in treatment (bbls): | 130 | Min frac gradient (psi/ft): | 0.10 | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 7199 | Fresh water used in treatment (bbls): | 366920 | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 12519949 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6855 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 9/15/2016 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 1120 | BBLS_OIL | 551 | BTU_GAS | 1375 | CALC_BBLS_H2O | 1120 | CALC_BBLS_OIL | 551 | CALC_GOR | 962 | CALC_MCF_GAS | 530 | CASING_PRESS | 6 | GRAVITY_OIL | 52 | MCF_GAS | 530 | TUBING_PRESS | 963 |
| Perforation Data: | Interval Top: | 6951 ft. | # Of Holes: | 612 | Interval Bottom: | 11764 ft. | Hole Size: | 0.8 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 12/16/2016 Interval Top: 6951 ft. Interval Bottom: 7043 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 8/27/2016 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 6951 ft. | # Of Holes: | 9 | Interval Bottom: | 7043 ft. | Hole Size: | 0.8 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 4010 |
Total Gas Produced (MCF) | 78644 |
GOR | 19611 |
GOR Determination | MCFE |
Average BOE per Day | 47.989 |
Average MCFE per Day | 278.342 |
Federal Financial Assurance | i | |
|
|