|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 4/18/2019 Measured TD: 17592 ft. Vertical TD: 7037 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 4/18/2019 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 2/14/2020 | | Proposed Top PZ Location: | Sec:25 Twp: 2N 65W | Footage: 901 FNL 255 FWL | | Bottom Hole Location: | Sec:1 Twp: 1N 65W | Footage: 323 FNL 73 FWL | | Proposed Depth/Form: | 17545 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 720, Drill Unit: GWA | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42.1 , Citings Type: PLANNED | | Cement: | Sacks: 30, Top: 0 ft., Bottom: 40 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 590, Top: 0 ft., Bottom: 1500 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 17535 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 2078, Top: , Bottom: 17535 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6319 ft., Depth: 16463 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 660, Top: 6419 ft., Bottom: 16463 ft. |
| | |
| Wellbore Completed | | Completion Date: | 9/16/2018 | | Spud Date: | 5/1/2018 | Spud Date Is: | ACTUAL | | Measured TD: | 17592 ft. | Measured PB depth: | 17572 ft. | | True Vertical TD: | 7037 ft. | True Vertical PB depth: | 7036 ft. | | Top PZ Location: | Sec:25 Twp: 2N 65W | Footage: 901 FNL 255 FWL | | Bottom Hole Location: | Sec:1 Twp: 1N 65W | Footage: 323 FNL 73 FWL | | Log Types: | CBL, MWD/LWD. (DIL on 05-123-25613 and 05-123-22222). | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 97 ft., Weight: 42 , Citings Type: ACTUAL | | Cement: | Sacks: 64, Top: 0 ft., Bottom: 97 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1878 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 699, Top: 0 ft., Bottom: 1878 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 17582 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 1680, Top: 2105 ft., Bottom: 17592 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | FOX HILLS | 1387 ft. | | | | | PARKMAN | 4061 ft. | | | | | SUSSEX | 4519 ft. | | | | | SHARON SPRINGS | 7032 ft. | | | | | NIOBRARA | 7110 ft. | | | |
Formation NBRR Formation Classification: OW Status: PR - 4/18/2019 Interval Top: 7494 ft. Interval Bottom: 17553 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 3/22/2019 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 2/20/2019 | Treatment End Date: | 3/5/2019 | | Treatment Summary: | PERF AND FRAC FROM 7494-17553.
71 BBL 15% HCL ACID, 900 BBL 7.5% HCL ACID, 19,821 BBL PUMP DOWN, 325,475 BBL SLICKWATER, 346,267 TOTAL FLUID, 8,052,605# 40/70 OTTAWA/ST. PETERS, 8,052,605# TOTAL SAND. | | Total fluid used in treatment (bbls): | 346267 | Max pressure during treatment (psi): | 7935 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 51 | | Total acid used in treatment (bbls): | 971 | Min frac gradient (psi/ft): | 0.97 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 8214 | | Fresh water used in treatment (bbls): | 345296 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 8052605 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7101 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/18/2019 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 450 | | BBLS_OIL | 179 | | BTU_GAS | 1280 | | CALC_BBLS_H2O | 450 | | CALC_BBLS_OIL | 179 | | CALC_GOR | 1531 | | CALC_MCF_GAS | 274 | | CASING_PRESS | 2500 | | GRAVITY_OIL | 44 | | MCF_GAS | 274 | | TUBING_PRESS | 1700 |
| | Perforation Data: | | Interval Top: | 7494 ft. | # Of Holes: | 1233 | | Interval Bottom: | 17553 ft. | Hole Size: | 0.44 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 9013 |
| Total Gas Produced (MCF) | 112058 |
| GOR | 12432 |
| GOR Determination | BOE |
| Average BOE per Day | 82.540 |
| Average MCFE per Day | 478.713 |
| Federal Financial Assurance | i | |
|
|