|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 11/1/2021 Measured TD: 17715 ft. Vertical TD: 7127 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 11/1/2021 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 2/14/2020 | | Proposed Top PZ Location: | Sec:25 Twp: 2N 65W | Footage: 966 FNL 529 FWL | | Bottom Hole Location: | Sec:1 Twp: 1N 65W | Footage: 335 FNL 541 FWL | | Proposed Depth/Form: | 17627 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 360, Drill Unit: GWA | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42.1 , Citings Type: PLANNED | | Cement: | Sacks: 30, Top: 0 ft., Bottom: 40 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 590, Top: 0 ft., Bottom: 1500 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 17617 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 2088, Top: , Bottom: 17617 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6527 ft., Depth: 16674 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 660, Top: 6627 ft., Bottom: 16674 ft. |
| | |
| Wellbore Completed | | Completion Date: | 9/10/2018 | | Spud Date: | 5/3/2018 | Spud Date Is: | ACTUAL | | Measured TD: | 17715 ft. | Measured PB depth: | 17703 ft. | | True Vertical TD: | 7127 ft. | True Vertical PB depth: | 7128 ft. | | Top PZ Location: | Sec:25 Twp: 2N 65W | Footage: 966 FNL 529 FWL | | Bottom Hole Location: | Sec:1 Twp: 1N 65W | Footage: 335 FNL 541 FWL | | Log Types: | CBL, MWD/LWD. (DIL on 05-123-25613 and 05-123-22222). | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 97 ft., Weight: 42 , Citings Type: ACTUAL | | Cement: | Sacks: 64, Top: 0 ft., Bottom: 97 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1878 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 699, Top: 0 ft., Bottom: 1878 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 17705 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 1690, Top: 2756 ft., Bottom: 17715 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | FOX HILLS | 1383 ft. | | | | | PARKMAN | 4025 ft. | | | | | SUSSEX | 4478 ft. | | | | | SHARON SPRINGS | 7029 ft. | | | | | NIOBRARA | 7074 ft. | | | | | FORT HAYS | 7475 ft. | | | | | CODELL | 7569 ft. | | | | | CARLILE | 12087 ft. | | | |
Formation CARL Formation Classification: OW Status: CM - 5/14/2019 Interval Top: 12087 ft. Interval Bottom: 12118 ft.| Completed Information for Formation CARLILE | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CARLILE | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 5/14/2019 | Treatment End Date: | N/A | | Treatment Summary: | Carlile: 12087-12118 | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CARL. |
| | Perforation Data: | | Interval Top: | 12087 ft. | # Of Holes: | 576 | | Interval Bottom: | 12118 ft. | Hole Size: | 0.44 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 5/14/2019 Interval Top: 11301 ft. Interval Bottom: 17503 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 5/14/2019 | Treatment End Date: | N/A | | Treatment Summary: | Niobrara: 11301-11509, 11537-11586, 17311-17503 | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 11301 ft. | # Of Holes: | 576 | | Interval Bottom: | 17503 ft. | Hole Size: | 0.44 in. |
|
Formation FTHYS Formation Classification: OW Status: CM - 5/14/2019 Interval Top: 9974 ft. Interval Bottom: 17676 ft.| Completed Information for Formation FORT HAYS | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | FORT HAYS | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 5/14/2019 | Treatment End Date: | N/A | | Treatment Summary: | Fort Hays: 9974-9976, 11509-11537, 11586-11676, 16991-17311, 17616-17676 | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation FTHYS. |
| | Perforation Data: | | Interval Top: | 9974 ft. | # Of Holes: | 576 | | Interval Bottom: | 17676 ft. | Hole Size: | 0.44 in. |
|
Formation CODL Formation Classification: OW Status: CM - 5/14/2019 Interval Top: 7646 ft. Interval Bottom: 17616 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 5/14/2019 | Treatment End Date: | N/A | | Treatment Summary: | Codell: 7646-9974, 9976-11301, 11676-12087, 12118-16991, 17503-17616 | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7646 ft. | # Of Holes: | 576 | | Interval Bottom: | 17616 ft. | Hole Size: | 0.44 in. |
|
Formation NFCC Formation Classification: OW Status: PR - 11/1/2021 Interval Top: 7646 ft. Interval Bottom: 17676 ft.| Completed Information for Formation NIOBRARA-FORT HAYS-CODELL-CARLILE | | 1st Production Date: | 3/22/2019 | Choke Size: | | | Formation Name: | NIOBRARA-FORT HAYS-CODELL-CARLILE | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 2/20/2019 | Treatment End Date: | 2/25/2019 | | Treatment Summary: | PERF AND FRAC FROM 7646-17676.
71 BBL 15% HCL ACID, 424 BBL 7.5% HCL ACID, 9,922 BBL PUMP DOWN, 165,195 BBL SLICKWATER, 175,612 TOTAL FLUID, 5,318,400# 40/70 OTTAWA/ST. PETERS, 5,318,400# TOTAL SAND. | | Total fluid used in treatment (bbls): | 175612 | Max pressure during treatment (psi): | 7725 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 26 | | Total acid used in treatment (bbls): | 495 | Min frac gradient (psi/ft): | 0.95 | | Recycled water used in treatment (bbls): | 75 | Total flowback volume recovered (bbls): | 9610 | | Fresh water used in treatment (bbls): | 175042 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 5318400 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7225 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/13/2019 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 260 | | BBLS_OIL | 69 | | BTU_GAS | 1280 | | CALC_BBLS_H2O | 260 | | CALC_BBLS_OIL | 69 | | CALC_GOR | 1391 | | CALC_MCF_GAS | 96 | | CASING_PRESS | 2300 | | GRAVITY_OIL | 44 | | MCF_GAS | 96 | | TUBING_PRESS | 1500 |
| | Perforation Data: | | Interval Top: | 7646 ft. | # Of Holes: | 576 | | Interval Bottom: | 17676 ft. | Hole Size: | 0.44 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 7203 |
| Total Gas Produced (MCF) | 80147 |
| GOR | 11126 |
| GOR Determination | BOE |
| Average BOE per Day | 56.973 |
| Average MCFE per Day | 330.473 |
| Federal Financial Assurance | i | |
|
|