|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 4/13/2019 Measured TD: 17481 ft. Vertical TD: 6915 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 4/13/2019 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 2/14/2020 | | Proposed Top PZ Location: | Sec:25 Twp: 2N 65W | Footage: 835 FNL 736 FWL | | Bottom Hole Location: | Sec:1 Twp: 1N 65W | Footage: 325 FNL 709 FWL | | Proposed Depth/Form: | 17395 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 360, Drill Unit: GWA | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42.1 , Citings Type: PLANNED | | Cement: | Sacks: 30, Top: 0 ft., Bottom: 40 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 590, Top: 0 ft., Bottom: 1500 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 17385 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 2060, Top: , Bottom: 17385 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6363 ft., Depth: 16517 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 660, Top: 6463 ft., Bottom: 16517 ft. |
| | |
| Wellbore Completed | | Completion Date: | 9/5/2018 | | Spud Date: | 5/3/2018 | Spud Date Is: | ACTUAL | | Measured TD: | 17481 ft. | Measured PB depth: | 17470 ft. | | True Vertical TD: | 6915 ft. | True Vertical PB depth: | 6915 ft. | | Top PZ Location: | Sec:25 Twp: 2N 65W | Footage: 835 FNL 736 FWL | | Bottom Hole Location: | Sec:1 Twp: 1N 65W | Footage: 325 FNL 709 FWL | | Log Types: | CBL, MWD/LWD. (DIL on 05-123-25613 and 05-123-22222). | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 97 ft., Weight: 42 , Citings Type: ACTUAL | | Cement: | Sacks: 64, Top: 0 ft., Bottom: 97 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1881 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 705, Top: 0 ft., Bottom: 1881 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 17458 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 1660, Top: 2376 ft., Bottom: 17481 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | FOX HILLS | 1379 ft. | | | | | PARKMAN | 3997 ft. | | | | | SUSSEX | 4450 ft. | | | | | NIOBRARA | 7106 ft. | | | |
Formation NBRR Formation Classification: OW Status: PR - 4/13/2019 Interval Top: 7343 ft. Interval Bottom: 17442 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 3/24/2019 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 2/20/2019 | Treatment End Date: | 3/5/2019 | | Treatment Summary: | PERF AND FRAC FROM 7343-17442.
180 BBL 15% HCL ACID, 803 BBL 7.5% HCL ACID, 19,276 BBL PUMP DOWN, 330,432 BBL SLICKWATER, 350,691 TOTAL FLUID, 8,073,405# 40/70 OTTAWA/ST. PETERS, 8,073,405# TOTAL SAND. | | Total fluid used in treatment (bbls): | 350691 | Max pressure during treatment (psi): | 7813 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 51 | | Total acid used in treatment (bbls): | 983 | Min frac gradient (psi/ft): | 0.97 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 12217 | | Fresh water used in treatment (bbls): | 349708 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 8073405 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6972 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/13/2019 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 260 | | BBLS_OIL | 69 | | BTU_GAS | 1280 | | CALC_BBLS_H2O | 260 | | CALC_BBLS_OIL | 69 | | CALC_GOR | 1391 | | CALC_MCF_GAS | 96 | | CASING_PRESS | 2600 | | GRAVITY_OIL | 44 | | MCF_GAS | 96 | | TUBING_PRESS | 2100 |
| | Perforation Data: | | Interval Top: | 7343 ft. | # Of Holes: | 1224 | | Interval Bottom: | 17442 ft. | Hole Size: | 0.44 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 6173 |
| Total Gas Produced (MCF) | 136948 |
| GOR | 22184 |
| GOR Determination | MCFE |
| Average BOE per Day | 81.120 |
| Average MCFE per Day | 470.507 |
| Federal Financial Assurance | i | |
|
|