Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-42063
Well Classification: OW Status: TA - 2/13/2026
Well Name/No:Sater #19E-223
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:TAStatus Date2/13/2026
FacilityID:442944LocationID:442952
County:WELD #123Location:NWNW 19 4N63W 6
Field:WATTENBERG - #90750Elevation:4660 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:154FNL  456 FWLLat/Long: 40.304480 / -104.488050Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.304470 / -104.488040Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/13/2016
End Date: 6/20/2016
Reported: 7/28/2016
Days to report: 38
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: TA - 2/13/2026             Measured TD: 10910 ft.    Vertical TD: 6499 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        TA - 2/13/2026
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:8/20/2017
Proposed Top PZ Location:Sec:19 Twp: 4N 63W Footage: 823 FNL  472 FWL
Bottom Hole Location:Sec:19 Twp: 4N 63W Footage: 500 FSL  488 FWL
Proposed Depth/Form:10921 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1600 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 878, Top: 0 ft., Bottom: 1600 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 10920 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2035, Top: 0 ft., Bottom: 10920 ft.

Wellbore Completed
Completion Date:2/10/2016
Spud Date:2/5/2016Spud Date Is:ACTUAL
Measured TD:10910 ft.Measured PB depth:10855 ft.
True Vertical TD:6499 ft.True Vertical PB depth:6499 ft.
Top PZ Location:Sec:19 Twp: 4N 63WFootage: 594 FNL  489 FWL
Bottom Hole Location:Sec:19 Twp: 4N 63WFootage: 501 FSL  516 FWL
Log Types:CBL, MWD (DIL in 123-17622)
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1625 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 750, Top: 0 ft., Bottom: 1625 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 10882 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 1525, Top: 200 ft., Bottom: 10910 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3555 ft.
SUSSEX4086 ft.
SHANNON4791 ft.
SHARON SPRINGS6352 ft.
NIOBRARA6546 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  TA - 2/13/2026                 Interval Top: 6718 ft.    Interval Bottom: 10674 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:6/29/2016Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/13/2016Treatment End Date:6/20/2016
Treatment Summary:21 Stage Plug and Perf, Perf'd from 6718-10674, 3 Toe Sleeves from 10714-10811 Total fluid: 123,895 bbls Slickwater Fluid: 123,404 bbls 15% HCl Acid: 491 bbls Total Proppant: 4,278,500 lbs Silica Proppant: 4,278,500 lbs Method for determining flowback: measuring flowback tank volumes
Total fluid used in treatment (bbls):123895Max pressure during treatment (psi):4220
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:21
Total acid used in treatment (bbls):491Min frac gradient (psi/ft):0.94
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):4588
Fresh water used in treatment (bbls):123404Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4278500Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 299
BBLS_OIL 451
BTU_GAS 1355
CALC_BBLS_H2O 299
CALC_BBLS_OIL 451
CALC_GOR 1463
CALC_MCF_GAS 660
CASING_PRESS 1898
GRAVITY_OIL 47
MCF_GAS 660
TUBING_PRESS 1545
Perforation Data:
Interval Top:6718 ft.# Of Holes:744
Interval Bottom:10674 ft.Hole Size:0.42 in.
Primary Well Designation:
Noticed Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveYNoticed Date
03/31/2026
Defined Inactive (TA)YLast Production
07/18/2025
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)219
Total Gas Produced (MCF)7037
GOR32132
GOR DeterminationMCFE
Average BOE per Day3.991
Average MCFE per Day23.140

 Federal Financial Assurance  i 

 Tribal Well  i No