|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 8/31/2016 Measured TD: 13219 ft. Vertical TD: 7229 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 8/31/2016 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 7/26/2017 | | Proposed Top PZ Location: | Sec:22 Twp: 2N 65W | Footage: 59 FNL 782 FEL | | Bottom Hole Location: | Sec:27 Twp: 2N 65WE | Footage: 350 FNL 720 FEL | | Proposed Depth/Form: | 13203 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 240, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1800 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 700, Top: 0 ft., Bottom: 1800 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 13193 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 1547, Top: 0 ft., Bottom: 13193 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/21/2015 | | Spud Date: | 8/23/2015 | Spud Date Is: | ACTUAL | | Measured TD: | 13219 ft. | Measured PB depth: | 13121 ft. | | True Vertical TD: | 7229 ft. | True Vertical PB depth: | 7225 ft. | | Top PZ Location: | Sec:15 Twp: 2N 65W | Footage: 25 FSL 780 FEL | | Bottom Hole Location: | Sec:27 Twp: 2N 65W | Footage: 348 FNL 713 FEL | | Log Types: | CBL, MWD, (CNL in 123-41955, IND in 123-29100) | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 65 ft., Weight: 42.1 , Citings Type: ACTUAL | | Cement: | Sacks: 28, Top: 0 ft., Bottom: 65 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1856 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 711, Top: 0 ft., Bottom: 1856 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 13211 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 1880, Top: 0 ft., Bottom: 13211 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4433 ft. | | | | | SHARON SPRINGS | 6962 ft. | | | | | NIOBRARA | 7035 ft. | | | | | FORT HAYS | 7459 ft. | | | | | CODELL | 7542 ft. | | | | | CARLILE | 9438 ft. | | | |
Formation NBRR Formation Classification: OW Status: CM - 12/20/2017 Interval Top: 10881 ft. Interval Bottom: 11028 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 10881 ft. | # Of Holes: | 312 | | Interval Bottom: | 11028 ft. | Hole Size: | 0.46 in. |
|
Formation CARL Formation Classification: OW Status: CM - 12/20/2017 Interval Top: 9438 ft. Interval Bottom: 13112 ft.| Completed Information for Formation CARLILE | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CARLILE | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CARL. |
| | Perforation Data: | | Interval Top: | 9438 ft. | # Of Holes: | 312 | | Interval Bottom: | 13112 ft. | Hole Size: | 0.46 in. |
|
Formation FTHYS Formation Classification: OW Status: CM - 12/20/2017 Interval Top: 9128 ft. Interval Bottom: 12937 ft.| Completed Information for Formation FORT HAYS | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | FORT HAYS | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation FTHYS. |
| | Perforation Data: | | Interval Top: | 9128 ft. | # Of Holes: | 312 | | Interval Bottom: | 12937 ft. | Hole Size: | 0.46 in. |
|
Formation CODL Formation Classification: OW Status: CM - 12/20/2017 Interval Top: 7626 ft. Interval Bottom: 12898 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7626 ft. | # Of Holes: | 312 | | Interval Bottom: | 12898 ft. | Hole Size: | 0.46 in. |
|
Formation NFCC Formation Classification: OW Status: PR - 8/31/2016 Interval Top: 7626 ft. Interval Bottom: 13112 ft.| Completed Information for Formation NIOBRARA-FORT HAYS-CODELL-CARLILE | | 1st Production Date: | 8/24/2016 | Choke Size: | | | Formation Name: | NIOBRARA-FORT HAYS-CODELL-CARLILE | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 8/8/2016 | Treatment End Date: | 8/11/2016 | | Treatment Summary: | PERF AND FRAC FROM 7626-13112.
10 BBL 7.5% HCL ACID, 88,124 BBL SLICKWATER, 3,043 BBL WATER, - 91,177 BBL TOTAL FLUID
396,475# 100 MESH PREMIUM, 2,199,977# 40/70 PREMIUM, - 2,596,452# TOTAL SAND.
ENTERED: CODELL 7626-9128; 9191-9438; 9457-10,664; 11,028-11,085; 11,108-12,543; 12,763-12,898;
FT HAYS 9128-9191; 10,664-10,881; 12,543-12,728; 12,898-12,937;
CARLILE 9438-9457; 11,085-11,108; 12,728-12,763; 12,937-13,112;
NIOBRARA 10,881-11,028;
THIS IS A DESIGNATED SOURCE OF SUPPLY WELL
(SEE ATTACHMENT)
| | Total fluid used in treatment (bbls): | 91177 | Max pressure during treatment (psi): | 7530 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 15 | | Total acid used in treatment (bbls): | 10 | Min frac gradient (psi/ft): | 0.91 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 1497 | | Fresh water used in treatment (bbls): | 91167 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 2596452 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/31/2016 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 354 | | BBLS_OIL | 72 | | BTU_GAS | 1360 | | CALC_BBLS_H2O | 354 | | CALC_BBLS_OIL | 72 | | CALC_GOR | 3153 | | CALC_MCF_GAS | 227 | | CASING_PRESS | 1600 | | GRAVITY_OIL | 50 | | MCF_GAS | 227 |
| | Perforation Data: | | Interval Top: | 7626 ft. | # Of Holes: | 312 | | Interval Bottom: | 13112 ft. | Hole Size: | 0.46 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 2287 |
| Total Gas Produced (MCF) | 46232 |
| GOR | 20215 |
| GOR Determination | MCFE |
| Average BOE per Day | 28.110 |
| Average MCFE per Day | 163.037 |
| Federal Financial Assurance | i | |
|
|