Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-41886
Well Classification: OW Status: PR - 12/11/2015
Well Name/No:North Platte #K21-O24-34HNC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:BONANZA CREEK ENERGY OPERATING COMPANY LLC - 8960
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/11/2015
FacilityID:442469LocationID:441915
County:WELD #123Location:SESW 27 5N63W 6
Field:WATTENBERG - #90750Elevation:4559 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1153FSL  2473 FWLLat/Long: 40.366380 / -104.422400Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.366429 / -104.422365Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/18/2015
End Date: 10/20/2015
Reported: 10/30/2015
Days to report: 10
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 12/11/2015             Measured TD: 11120 ft.    Vertical TD: 6409 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 12/11/2015
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:7/12/2017
Proposed Top PZ Location:Sec:34 Twp: 5N 63W Footage: 712 FNL  2333 FWL
Bottom Hole Location:Sec:34 Twp: 5N 63W Footage: 467 FSL  2432 FWL
Proposed Depth/Form:11137 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1640 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 800, Top: 0 ft., Bottom: 1640 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6860 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 500, Top: 2500 ft., Bottom: 6860 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6760 ft., Depth: 11137 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:10/2/2015
Spud Date:9/2/2015Spud Date Is:ACTUAL
Measured TD:11120 ft.Measured PB depth:11069 ft.
True Vertical TD:6409 ft.True Vertical PB depth:6408 ft.
Top PZ Location:Sec:34 Twp: 5N 63WFootage: 712 FNL  2333 FWL
Bottom Hole Location:Sec:34 Twp: 5N 63WFootage: 467 FSL  2432 FWL
Log Types:Mud, CBL, MWD, (Triple Combo in API# 05-123-41885)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1688 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 1126, Top: 0 ft., Bottom: 1688 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6967 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 875, Top: 1087 ft., Bottom: 6967 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6180 ft., Depth: 11113 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PARKMAN3411 ft.NN
SHARON SPRINGS6347 ft.NN
NIOBRARA6505 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 12/11/2015                Interval Top: 7031 ft.    Interval Bottom: 11120 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:12/4/2015Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/19/2015Treatment End Date:10/20/2015
Treatment Summary:25 stage Niobrara pumped a total of 76,333 bbls of fluid (PermStim) with 13bbl 15% SBM HCL, and 4,113,035 # of sand (40/70 Ottawa, 30/50 Ottawa); ATP 4,756 psi, ATR 47 bpm, Final ISDP 2,981 psi; completed with sliding sleeves and casing packers.
Total fluid used in treatment (bbls):76333Max pressure during treatment (psi):7277
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:25
Total acid used in treatment (bbls):13Min frac gradient (psi/ft):0.90
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):14985
Fresh water used in treatment (bbls):76320Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4113035Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6733 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/11/2015Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 114
BBLS_OIL 403
BTU_GAS 1360
CALC_BBLS_H2O 114
CALC_BBLS_OIL 403
CALC_GOR 2602
CALC_MCF_GAS 1049
CASING_PRESS 951
GRAVITY_OIL 46
MCF_GAS 1049
TUBING_PRESS 459
Perforation Data:
Interval Top:7031 ft.# Of Holes:250
Interval Bottom:11120 ft.Hole Size:1.625 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)3655
Total Gas Produced (MCF)40479
GOR11074
GOR DeterminationBOE
Average BOE per Day29.035
Average MCFE per Day168.404

 Federal Financial Assurance  i 

 Tribal Well  i No