|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 11/1/2024 Measured TD: 13549 ft. Vertical TD: 5687 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 11/1/2024 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 7/9/2017 | | Proposed Top PZ Location: | Sec:7 Twp: 10N 57W | Footage: 2556 FSL 435 FEL | | Bottom Hole Location: | Sec:18 Twp: 10N 57W | Footage: 100 FSL 485 FEL | | Proposed Depth/Form: | 13807 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 535-508 , Unit Acreage: 960, Drill Unit: S/2 S7, All S18 | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 20 in., Top: 0 ft., Depth: 80 ft., Weight: 92 , Citings Type: PLANNED | | Cement: | Sacks: 179, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2000 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 885, Top: 0 ft., Bottom: 2000 ft. | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 13818 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 2307, Top: 0 ft., Bottom: 13818 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 6 in., Size: 4.5 in., Top: 5250 ft., Depth: 13807 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 5/20/2016 | | Spud Date: | 5/13/2016 | Spud Date Is: | ACTUAL | | Measured TD: | 13549 ft. | Measured PB depth: | 13212 ft. | | True Vertical TD: | 5687 ft. | True Vertical PB depth: | 5691 ft. | | Top PZ Location: | Sec:18 Twp: 10N 57W | Footage: 1640 FSL 390 FEL | | Bottom Hole Location: | Sec:18 Twp: 10N 57W | Footage: 458 FSL 492 FEL | | Log Types: | LWD/MWD, Mud, CBL, NEU | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 101 ft., Weight: 65 , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 101 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13 in., Size: 9.625 in., Top: 0 ft., Depth: 2081 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 892, Top: 0 ft., Bottom: 2081 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 13260 ft., Weight: 20 , Citings Type: ACTUAL | | Cement: | Sacks: 2382, Top: 874 ft., Bottom: 13260 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PIERRE | 1695 ft. | | N | N | | HYGIENE | 3435 ft. | | N | N | | SHARON SPRINGS | 5684 ft. | | N | N | | NIOBRARA | 5690 ft. | | N | N |
Formation NBRR Formation Classification: OW Status: PR - 11/1/2024 Interval Top: 12371 ft. Interval Bottom: 13167 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 8/30/2017 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 6/27/2017 | Treatment End Date: | 6/28/2017 | | Treatment Summary: | 6 Stage Plug & Perf, 120100# 100 Mesh , 483000# 40/70 Prem White sand, 571 bbls 15% HCl, 27109 bbls slickwater. Stages 7-50 put on hold due to wireline gun being stuck in the well. Slickwater volume includes pump in volume of 2564 bbls to start stage 7. | | Total fluid used in treatment (bbls): | 27680 | Max pressure during treatment (psi): | 7702 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.33 | | Type Of gas: | | Number Of staged intervals: | 6 | | Total acid used in treatment (bbls): | 571 | Min frac gradient (psi/ft): | 0.90 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 3830 | | Fresh water used in treatment (bbls): | 27109 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 603100 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 3 in. | Tubing Setting Depth: | 5795 ft. | | Tubing Packer Depth: | 5785 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/2/2017 | Test Method: | Separator | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 155 | | BBLS_OIL | 185 | | BTU_GAS | 1408 | | CALC_BBLS_H2O | 155 | | CALC_BBLS_OIL | 185 | | CALC_GOR | 270 | | CALC_MCF_GAS | 50 | | GRAVITY_OIL | 35 | | MCF_GAS | 50 | | TUBING_PRESS | 400 |
| | Perforation Data: | | Interval Top: | 12371 ft. | # Of Holes: | 239 | | Interval Bottom: | 13167 ft. | Hole Size: | 0.375 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 02/2025 - 01/2026 |
| Total Oil Produced (Barrels) | 221 |
| Total Gas Produced (MCF) | 1293 |
| GOR | 5850 |
| GOR Determination | BOE |
| Average BOE per Day | 1.224 |
| Average MCFE per Day | 7.111 |
| Federal Financial Assurance | i | |
|
|