|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 8/1/2017 Measured TD: 14095 ft. Vertical TD: 6002 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 8/1/2017 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 7/9/2017 | Proposed Top PZ Location: | Sec:7 Twp: 10N 57W | Footage: 2557 FSL 597 FEL | Bottom Hole Location: | Sec:18 Twp: 10N 58W | Footage: 100 FSL 648 FEL | Proposed Depth/Form: | 13996 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: FTHYS , Formation: FORT HAYS , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 535-508 , Unit Acreage: 960, Drill Unit: S/2 S7, All S18 | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 20 in., Top: 0 ft., Depth: 80 ft., Weight: 92 , Citings Type: PLANNED | Cement: | Sacks: 179, Top: 0 ft., Bottom: 80 ft. | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2000 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 885, Top: 0 ft., Bottom: 2000 ft. | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 14097 ft., Weight: 17 , Citings Type: PLANNED | Cement: | Sacks: 2342, Top: 0 ft., Bottom: 14097 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6 in., Size: 4.5 in., Top: 5448 ft., Depth: 13996 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: |
| | |
Wellbore Completed | Completion Date: | 5/25/2016 | Spud Date: | 5/20/2016 | Spud Date Is: | ACTUAL | Measured TD: | 14095 ft. | Measured PB depth: | 14044 ft. | True Vertical TD: | 6002 ft. | True Vertical PB depth: | 6002 ft. | Top PZ Location: | Sec:7 Twp: 10N 57W | Footage: 2339 FSL 589 FEL | Bottom Hole Location: | Sec:18 Twp: 10N 57W | Footage: 57 FSL 631 FEL | Log Types: | LWD/MWD, Mud, CBL, (DIL in API 123-41839) | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 101 ft., Weight: 65 , Citings Type: ACTUAL | Cement: | Sacks: 100, Top: 0 ft., Bottom: 101 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2049 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 892, Top: 0 ft., Bottom: 2049 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 14093 ft., Weight: 20 , Citings Type: ACTUAL | Cement: | Sacks: 2515, Top: 1463 ft., Bottom: 14093 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PIERRE | 1695 ft. | | N | N | HYGIENE | 3435 ft. | | N | N | SHARON SPRINGS | 5698 ft. | | N | N | NIOBRARA | 5704 ft. | | N | N | FORT HAYS | 5978 ft. | | N | N | CODELL | 6498 ft. | | N | N | CARLILE | 6536 ft. | | N | N |
Formation CARL Formation Classification: OW Status: CM - 8/2/2018 Interval Top: 8628 ft. Interval Bottom: 11552 ft. Completed Information for Formation CARLILE | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CARLILE | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | | Treatment Date: | 8/2/2018 | Treatment End Date: | N/A | Treatment Summary: | Completed Depths: 8628'-8630' (10 shots); 11284'-11552' (80 shots) | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CARL. |
| Perforation Data: | Interval Top: | 8628 ft. | # Of Holes: | 90 | Interval Bottom: | 11552 ft. | Hole Size: | 0.375 in. |
|
Formation CODL Formation Classification: OW Status: CM - 8/2/2018 Interval Top: 7596 ft. Interval Bottom: 13999 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | | Treatment Date: | 8/2/2018 | Treatment End Date: | N/A | Treatment Summary: | Completed Depths: 7596'-7708' (40 shots); 7974'-8598' (180 shots); 10196'-11254' (290 shots); 11579'-13678' (580 shots); 13823'-13825' (10 shots); 13967'-13999' (19 shots) | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7596 ft. | # Of Holes: | 1119 | Interval Bottom: | 13999 ft. | Hole Size: | 0.375 in. |
|
Formation CLCDFH Formation Classification: OW Status: PR - 9/2/2017 Interval Top: 6500 ft. Interval Bottom: 13999 ft. Completed Information for Formation CARLILE-CODELL-FORT HAYS | 1st Production Date: | 8/30/2017 | Choke Size: | | Formation Name: | CARLILE-CODELL-FORT HAYS | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 6/6/2017 | Treatment End Date: | 6/12/2017 | Treatment Summary: | 50 Stage Plug & Perf, 1000977# 100 Mesh , 4024673# 40/70 Prem White sand, 721 bbls 15% HCl, 196631 bbls slickwater | Total fluid used in treatment (bbls): | 197352 | Max pressure during treatment (psi): | 7910 | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.33 | Type Of gas: | | Number Of staged intervals: | 50 | Total acid used in treatment (bbls): | 721 | Min frac gradient (psi/ft): | 0.80 | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 5467 | Fresh water used in treatment (bbls): | 196631 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 5025650 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 3 in. | Tubing Setting Depth: | 5875 ft. | Tubing Packer Depth: | 5865 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 9/2/2017 | Test Method: | Separator | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 318 | BBLS_OIL | 214 | BTU_GAS | 1399 | CALC_BBLS_H2O | 318 | CALC_BBLS_OIL | 214 | CALC_GOR | 187 | CALC_MCF_GAS | 40 | GRAVITY_OIL | 36 | MCF_GAS | 40 | TUBING_PRESS | 650 |
| Perforation Data: | Interval Top: | 6500 ft. | # Of Holes: | 1999 | Interval Bottom: | 13999 ft. | Hole Size: | 0.375 in. |
|
Formation FTHYS Formation Classification: OW Status: CM - 8/2/2018 Interval Top: 6500 ft. Interval Bottom: 13939 ft. Completed Information for Formation FORT HAYS | 1st Production Date: | N/A | Choke Size: | | Formation Name: | FORT HAYS | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | | Treatment Date: | 8/2/2018 | Treatment End Date: | N/A | Treatment Summary: | Completed Depths: 6500'-7566' (310 shots); 7743'-7949' (60 shots); 8950'-10152' (360 shots); 13710'-13793' (30 shots); 13855'-13939' (30 shots) | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation FTHYS. |
| Perforation Data: | Interval Top: | 6500 ft. | # Of Holes: | 790 | Interval Bottom: | 13939 ft. | Hole Size: | 0.375 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 2599 |
Total Gas Produced (MCF) | 6786 |
GOR | 2611 |
GOR Determination | BOE |
Average BOE per Day | 10.250 |
Average MCFE per Day | 59.469 |
Federal Financial Assurance | i | |
|
|