Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-41719
Well Classification: OW Status: PR - 6/1/2025
Well Name/No:Carlson #I-15-16HN
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/1/2025
FacilityID:442191LocationID:331351
County:WELD #123Location:NENE 15 5N65W 6
Field:WATTENBERG - #90750Elevation:4621 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1055FNL  354 FELLat/Long: 40.403697 / -104.641239Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.403697 / -104.641239Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/23/2017
End Date: 5/10/2017
Reported: 5/25/2017
Days to report: 15
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 6/1/2025             Measured TD: 14870 ft.    Vertical TD: 6862 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 6/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:6/24/2017
Proposed Top PZ Location:Sec:15 Twp: 5N 65W Footage: 1887 FNL  691 FEL
Bottom Hole Location:Sec:16 Twp: 5N 65W Footage: 1897 FNL  2342 FWL
Proposed Depth/Form:14836 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 280, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 800 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 355, Top: 0 ft., Bottom: 800 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7371 ft., Weight: 29 , Citings Type: PLANNED
Cement:Sacks: 577, Top: 400 ft., Bottom: 7371 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6671 ft., Depth: 14836 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: 634, Top: 6671 ft., Bottom: 14836 ft.

Wellbore Completed
Completion Date:11/8/2015
Spud Date:10/6/2015Spud Date Is:ACTUAL
Measured TD:14870 ft.Measured PB depth:14844 ft.
True Vertical TD:6862 ft.True Vertical PB depth:6862 ft.
Top PZ Location:Sec:15 Twp: 5N 65WFootage: 1887 FNL  691 FEL
Bottom Hole Location:Sec:16 Twp: 5N 65WFootage: 1897 FNL  2342 FWL
Log Types:MWD, Mud, CBL, O.H. Logging Exception for API#05-123-41720
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 43 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 848 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 275, Top: 0 ft., Bottom: 848 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7300 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 719, Top: 44 ft., Bottom: 7300 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 14857 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: 670, Top: 6100 ft., Bottom: 14857 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
PARKMAN3637 ft.NN
SUSSEX4170 ft.4195 ft.NN
SHARON SPRINGS6687 ft.NN
NIOBRARA7109 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 6/1/2025                  Interval Top: 7341 ft.    Interval Bottom: 14817 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:6/7/2017Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/23/2017Treatment End Date:5/10/2017
Treatment Summary:50 stage plug and perf; 143529 total bbls of fresh water and 15% HCl acid pumped; 9999070 total lbs of 40/70 proppant pumped
Total fluid used in treatment (bbls):143529Max pressure during treatment (psi):9476
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:50
Total acid used in treatment (bbls):307Min frac gradient (psi/ft):0.99
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):719
Fresh water used in treatment (bbls):143222Disposition method For flowback:DISPOSAL
Total proppant used (lbs):9999070Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7208 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/7/2017Test Method:
Hours Tested:8Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 280
BBLS_OIL 59
BTU_GAS 1274
CALC_BBLS_H2O 840
CALC_BBLS_OIL 177
CALC_GOR 10203
CALC_MCF_GAS 1806
CASING_PRESS 2444
GRAVITY_OIL 53
MCF_GAS 602
TUBING_PRESS 2312
Perforation Data:
Interval Top:7341 ft.# Of Holes:1765
Interval Bottom:14817 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
March 2025 - February 2026i
Total Oil Produced (Barrels)896
Total Gas Produced (MCF)15759
GOR17588
GOR DeterminationMCFE
Average BOE per Day9.927
Average MCFE per Day57.562

 Federal Financial Assurance  i 

 Tribal Well  i No