Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-41710
Well Classification: OW Status: PR - 12/1/2019
Well Name/No:Carlson #B-15-16HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/1/2019
FacilityID:442180LocationID:331351
County:WELD #123Location:NENE 15 5N65W 6
Field:WATTENBERG - #90750Elevation:4621 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1057FNL  249 FELLat/Long: 40.403694 / -104.640862Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.403695 / -104.640861Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/27/2017
End Date: 4/5/2017
Reported: 5/2/2017
Days to report: 27
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 12/1/2019             Measured TD: 14917 ft.    Vertical TD: 6980 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 12/1/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:6/23/2017
Proposed Top PZ Location:Sec:15 Twp: 5N 65W Footage: 327 FNL  766 FEL
Bottom Hole Location:Sec:16 Twp: 5N 65W Footage: 332 FNL  2352 FWL
Proposed Depth/Form:14905 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 560, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 800 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 355, Top: 0 ft., Bottom: 800 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7432 ft., Weight: 29 , Citings Type: PLANNED
Cement:Sacks: 581, Top: 400 ft., Bottom: 7432 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6732 ft., Depth: 14905 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: 634, Top: 6732 ft., Bottom: 14905 ft.

Wellbore Completed
Completion Date:9/27/2015
Spud Date:7/13/2015Spud Date Is:ACTUAL
Measured TD:14917 ft.Measured PB depth:14910 ft.
True Vertical TD:6980 ft.True Vertical PB depth:6980 ft.
Top PZ Location:Sec:15 Twp: 5N 65WFootage: 327 FNL  766 FEL
Bottom Hole Location:Sec:16 Twp: 5N 65WFootage: 332 FNL  2352 FWL
Log Types:MWD, Mud, CBL, O.H. Logging Exception for API#05-123-41720
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 43 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 840 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 245, Top: 0 ft., Bottom: 840 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7419 ft., Weight: 29 , Citings Type: ACTUAL
Cement:Sacks: 715, Top: 41 ft., Bottom: 7419 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 14916 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: 670, Top: 6100 ft., Bottom: 14916 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
PARKMAN3705 ft.NN
SUSSEX4185 ft.4205 ft.NN
SHARON SPRINGS6655 ft.NN
NIOBRARA7016 ft.NN
FORT HAYS7206 ft.NN
CODELL7364 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 10/24/2017                Interval Top: 13102 ft.    Interval Bottom: 14912 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/24/2017Treatment End Date:N/A
Treatment Summary:Producing interval: 13102' - 14912'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:13102 ft.# Of Holes:325
Interval Bottom:14912 ft.Hole Size:0.44 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 10/24/2017                Interval Top: 7472 ft.    Interval Bottom: 13056 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/24/2017Treatment End Date:N/A
Treatment Summary:Producing interval: 7472' - 13056'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7472 ft.# Of Holes:1008
Interval Bottom:13056 ft.Hole Size:0.44 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  PR - 12/1/2019                 Interval Top: 7472 ft.    Interval Bottom: 14912 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:6/28/2017Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/27/2017Treatment End Date:4/5/2017
Treatment Summary:38 stage plug and perf; 124470 total bbls of fresh water and 15% HCl acid pumped; 7600660 total lbs of 30/50 proppant pumped
Total fluid used in treatment (bbls):124470Max pressure during treatment (psi):8963
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:38
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):0.95
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):119
Fresh water used in treatment (bbls):124423Disposition method For flowback:DISPOSAL
Total proppant used (lbs):7600660Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7371 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/28/2017Test Method:
Hours Tested:12Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 247
BBLS_OIL 86
BTU_GAS 1274
CALC_BBLS_H2O 494
CALC_BBLS_OIL 172
CALC_GOR 2988
CALC_MCF_GAS 514
CASING_PRESS 1374
GRAVITY_OIL 53
MCF_GAS 257
TUBING_PRESS 1801
Perforation Data:
Interval Top:7472 ft.# Of Holes:1333
Interval Bottom:14912 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
March 2025 - February 2026i
Total Oil Produced (Barrels)1188
Total Gas Produced (MCF)28900
GOR24326
GOR DeterminationMCFE
Average BOE per Day16.866
Average MCFE per Day97.822

 Federal Financial Assurance  i 

 Tribal Well  i No