Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-41651
Well Classification: OW Status: PR - 7/24/2017
Well Name/No:Horsetail #07E-0601
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:FUNDARE RESOURCES OPERATING COMPANY LLC - 10773
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/24/2017
FacilityID:442068LocationID:431527
County:WELD #123Location:LOT2 7 10N57W 6
Field:DJ HORIZONTAL NIOBRARA - #16950Elevation:4925 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2504FNL  738 FWLLat/Long: 40.853825 / -103.801372Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.853826 / -103.801376Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/21/2017
End Date: 4/29/2017
Reported: 5/9/2017
Days to report: 10
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 7/24/2017             Measured TD: 13523 ft.    Vertical TD: 5786 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 7/24/2017
Wellbore PermitHORIZONTAL
Permit #:Expiration Date:6/13/2017
Proposed Top PZ Location:Sec:7 Twp: 10N 57W Footage: 2545 FNL  170 FWL
Bottom Hole Location:Sec:6 Twp: 10N 57W Footage: 600 FNL  161 FWL
Proposed Depth/Form:13390 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-508 , Unit Acreage: 960, Drill Unit: N/2 S7, All S6
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 65 , Citings Type: PLANNED
Cement:Sacks: 179, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1830 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 711, Top: 0 ft., Bottom: 1830 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 13390 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1954, Top: 0 ft., Bottom: 13390 ft.
Casing:String Type: 1ST LINER, Hole Size: 6 in., Size: 4.5 in., Top: 5277 ft., Depth: 13408 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:1/4/2016
Spud Date:12/29/2015Spud Date Is:ACTUAL
Measured TD:13523 ft.Measured PB depth:13468 ft.
True Vertical TD:5786 ft.True Vertical PB depth:5787 ft.
Top PZ Location:Sec:7 Twp: 10N 57WFootage: 2509 FNL  198 FWL
Bottom Hole Location:Sec:6 Twp: 10N 57WFootage: 553 FNL  157 FWL
Log Types:MWD, Mud, CBL, (NEU in API 123-41643)
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 101 ft., Weight: 65 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: 101 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2009 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 630, Top: 0 ft., Bottom: 2009 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 13516 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 1960, Top: 64 ft., Bottom: 13516 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PIERRE1750 ft.NN
HYGIENE3601 ft.NN
SHARON SPRINGS5698 ft.NN
NIOBRARA5703 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 7/24/2017                 Interval Top: 6246 ft.    Interval Bottom: 13422 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:7/21/2017Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/21/2017Treatment End Date:4/29/2017
Treatment Summary:30 Stage Plug & Perf 97121 lbs 100 Mesh, 3943377lbs Premium White, 40/70, 345 bbls15% HCl, 183951 bbls slickwater.
Total fluid used in treatment (bbls):184296Max pressure during treatment (psi):7729
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:30
Total acid used in treatment (bbls):345Min frac gradient (psi/ft):0.90
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):13152
Fresh water used in treatment (bbls):183951Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4914591Green completions techniques utilized:Yes
Reason green techniques Not utilized: PIPELINE
Tubing Size:2.375 in.Tubing Setting Depth:5869 ft.
Tubing Packer Depth:5859 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/24/2017Test Method:Separator
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1361
BBLS_OIL 298
BTU_GAS 1457
CALC_BBLS_H2O 1361
CALC_BBLS_OIL 295
CALC_GOR 144
CALC_MCF_GAS 43
GRAVITY_OIL 34
MCF_GAS 43
TUBING_PRESS 650
Perforation Data:
Interval Top:6246 ft.# Of Holes:1201
Interval Bottom:13422 ft.Hole Size:0.375 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)1123
Total Gas Produced (MCF)20824
GOR18543
GOR DeterminationMCFE
Average BOE per Day12.978
Average MCFE per Day75.257

 Federal Financial Assurance  i 

 Tribal Well  i No