|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 2/15/2021 Measured TD: 13728 ft. Vertical TD: 6082 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 2/15/2021 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 6/13/2017 | | Proposed Top PZ Location: | Sec:7 Twp: 10N 57W | Footage: 2545 FNL 431 FWL | | Bottom Hole Location: | Sec:6 Twp: 10N 57W | Footage: 600 FNL 488 FWL | | Proposed Depth/Form: | 13567 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CARL , Formation: CARLILE , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: FTHYS , Formation: FORT HAYS , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 535-508 , Unit Acreage: 960, Drill Unit: N/2 S7, All S6 | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 65 , Citings Type: PLANNED | | Cement: | Sacks: 179, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1830 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 711, Top: 0 ft., Bottom: 1830 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 13657 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 1990, Top: 0 ft., Bottom: 13657 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 6 in., Size: 4.5 in., Top: 5488 ft., Depth: 13548 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 1/29/2016 | | Spud Date: | 1/24/2016 | Spud Date Is: | ACTUAL | | Measured TD: | 13728 ft. | Measured PB depth: | 13665 ft. | | True Vertical TD: | 6082 ft. | True Vertical PB depth: | 6083 ft. | | Top PZ Location: | Sec:7 Twp: 10N 57W | Footage: 2521 FNL 461 FWL | | Bottom Hole Location: | Sec:6 Twp: 10N 57W | Footage: 568 FNL 473 FWL | | Log Types: | MWD/LWD, Mudlog, CBL (NEU in API 123-41643) | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 101 ft., Weight: 65 , Citings Type: ACTUAL | | Cement: | Sacks: 122, Top: 0 ft., Bottom: 101 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2030 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 620, Top: 0 ft., Bottom: 2030 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 13714 ft., Weight: 20 , Citings Type: ACTUAL | | Cement: | Sacks: 2055, Top: 700 ft., Bottom: 13728 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PIERRE | 1750 ft. | | N | N | | HYGIENE | 3601 ft. | | N | N | | SHARON SPRINGS | 5693 ft. | | N | N | | NIOBRARA | 5708 ft. | | N | N | | FORT HAYS | 6007 ft. | | N | N | | CODELL | 6042 ft. | | N | N | | CARLILE | 6067 ft. | | N | N |
Formation CARL Formation Classification: OW Status: PR - 2/15/2021 Interval Top: 8912 ft. Interval Bottom: 10086 ft.| Completed Information for Formation CARLILE | | 1st Production Date: | 7/21/2017 | Choke Size: | | | Formation Name: | CARLILE | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 2/26/2021 | Treatment End Date: | N/A | | Treatment Summary: | Completed Depths: 8912'-10086' (210 shots) | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Type: | | | Treatment Date: | 5/8/2018 | Treatment End Date: | N/A | | Treatment Summary: | Completed Depths: 8912'-10086' (210 shots) | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CARL. |
| | Perforation Data: | | Interval Top: | 8912 ft. | # Of Holes: | 210 | | Interval Bottom: | 10086 ft. | Hole Size: | 0.375 in. |
|
Formation CODL Formation Classification: OW Status: PR - 2/15/2021 Interval Top: 6627 ft. Interval Bottom: 13620 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 7/21/2017 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 2/26/2021 | Treatment End Date: | N/A | | Treatment Summary: | Completed Depths: 6627'-8852' (390 shots); 10143'-11493' (240 shots); 11784'-11844' (20 shots); 12252'-12958' (130 shots); 13619'- 13620' (11 shots). | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Type: | | | Treatment Date: | 5/8/2018 | Treatment End Date: | N/A | | Treatment Summary: | Completed Depths: 6627'-8852' (390 shots); 10143'-11493' (240 shots); 11784'-11844' (20 shots); 12252'-12958' (130 shots); 13619'-13620' (11 shots). | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 6627 ft. | # Of Holes: | 791 | | Interval Bottom: | 13620 ft. | Hole Size: | 0.375 in. |
|
Formation CLCDFH Formation Classification: OW Status: CM - 2/15/2021 Interval Top: 6451 ft. Interval Bottom: 13620 ft.| Completed Information for Formation CARLILE-CODELL-FORT HAYS | | 1st Production Date: | 7/21/2017 | Choke Size: | | | Formation Name: | CARLILE-CODELL-FORT HAYS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 3/25/2017 | Treatment End Date: | 3/30/2017 | | Treatment Summary: | 30 Stage Plug & Perf 872473 lbs # 100 Mesh, 3914259 lbs # Premium White, 40/70, 94 bbls15% HCl, 184012 bbls slickwater. | | Total fluid used in treatment (bbls): | 184106 | Max pressure during treatment (psi): | 7627 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.33 | | Type Of gas: | | Number Of staged intervals: | 30 | | Total acid used in treatment (bbls): | 94 | Min frac gradient (psi/ft): | 0.80 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 21857 | | Fresh water used in treatment (bbls): | 184012 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 4786732 | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 3 in. | Tubing Setting Depth: | 5987 ft. | | Tubing Packer Depth: | 5970 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/9/2017 | Test Method: | Separator | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 822 | | BBLS_OIL | 168 | | BTU_GAS | 1436 | | CALC_BBLS_H2O | 822 | | CALC_BBLS_OIL | 168 | | CALC_GOR | 292 | | CALC_MCF_GAS | 49 | | GRAVITY_OIL | 35 | | MCF_GAS | 49 | | TUBING_PRESS | 335 |
| | Perforation Data: | | Interval Top: | 6451 ft. | # Of Holes: | 1201 | | Interval Bottom: | 13620 ft. | Hole Size: | 0.375 in. |
|
Formation FTHYS Formation Classification: OW Status: PR - 2/15/2021 Interval Top: 6451 ft. Interval Bottom: 13561 ft.| Completed Information for Formation FORT HAYS | | 1st Production Date: | 7/21/2017 | Choke Size: | | | Formation Name: | FORT HAYS | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 2/26/2021 | Treatment End Date: | N/A | | Treatment Summary: | Completed Depths: 6451'-6570' (30 shots); 11549'-11727' (40 shots); 11901'-12196' (60 shots); 13052'-13561' (70 shots). | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Type: | | | Treatment Date: | 5/8/2018 | Treatment End Date: | N/A | | Treatment Summary: | Completed Depths: 6451'-6570' (30 shots); 11549'-11727' (40 shots); 11901'-12196' (60 shots); 13052'-13561' (70 shots). | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation FTHYS. |
| | Perforation Data: | | Interval Top: | 6451 ft. | # Of Holes: | 200 | | Interval Bottom: | 13561 ft. | Hole Size: | 0.375 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 765 |
| Total Gas Produced (MCF) | 5549 |
| GOR | 7253 |
| GOR Determination | BOE |
| Average BOE per Day | 4.381 |
| Average MCFE per Day | 25.406 |
| Federal Financial Assurance | i | |
|
|