Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-41445
Well Classification: OW Status: PR - 8/1/2017
Well Name/No:Horsetail #08D-1734
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:FUNDARE RESOURCES OPERATING COMPANY LLC - 10773
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/1/2017
FacilityID:441615LocationID:159741
County:WELD #123Location:NWNW 8 10N57W 6
Field:DJ HORIZONTAL NIOBRARA - #16950Elevation:4960 ft.
Planned Location:330FNL  531 FWLLat/Long: 40.859900 / -103.783497Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.859896 / -103.783492Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/21/2017
End Date: 6/30/2017
Reported: 7/24/2017
Days to report: 24
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 8/1/2017             Measured TD: 16165 ft.    Vertical TD: 5908 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 8/1/2017
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:4/29/2017
Prop Depth/Form:16202 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-658 , Unit Acreage: 1280, Drill Unit: All S8, All S17
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 20 in., Top: 0 ft., Depth: 80 ft., Weight: 92 , Citings Type: PLANNED
Cement:Sacks: 179, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2150 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 951, Top: 0 ft., Bottom: 2150 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16234 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 2750, Top: 0 ft., Bottom: 16234 ft.
Casing:String Type: 1ST LINER, Hole Size: 6 in., Size: 4.5 in., Top: 5450 ft., Depth: 16202 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:5/1/2016
Spud Date:4/26/2016Spud Date Is:ACTUAL
Measured TD:16165 ft.Measured PB depth:16105 ft.
True Vertical TD:5908 ft.True Vertical PB depth:5910 ft.
Top PZ Location:Sec:8 Twp: 10N 57WFootage: 720 FNL  499 FWLDepth
Bottom Hole Location:Sec:17 Twp: 10N 57WFootage: 25 FSL  320 FWLDepth
Log Types:LWD/MWD, Mud, CBL, (NEU in API 123-41024)
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 101 ft., Weight: 65 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 101 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1999 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 660, Top: 0 ft., Bottom: 1999 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16152 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2790, Top: 62 ft., Bottom: 16152 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PIERRE1730 ft.NN
HYGIENE3565 ft.NN
SHARON SPRINGS5716 ft.NN
NIOBRARA5724 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 9/12/2017                 Interval Top: 6286 ft.    Interval Bottom: 16059 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/31/2017Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/21/2017Treatment End Date:6/30/2017
Treatment Summary:65 Stage Plug & Perf, 1211824# 100 Mesh, 4990848# 30/50 Prem White sand, 762 bbls 15% HCl, 259681 bbls slickwater
Total fluid used in treatment (bbls):260443Max pressure during treatment (psi):7480
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:65
Total acid used in treatment (bbls):762Min frac gradient (psi/ft):0.80
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):15104
Fresh water used in treatment (bbls):259681Disposition method For flowback:DISPOSAL
Total proppant used (lbs):6202672Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:3 in.Tubing Setting Depth:5908 ft.
Tubing Packer Depth:5898 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/12/2017Test Method:Separator
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 334
BBLS_OIL 385
BTU_GAS 1488
CALC_BBLS_H2O 334
CALC_BBLS_OIL 385
CALC_GOR 210
CALC_MCF_GAS 81
GRAVITY_OIL 35
MCF_GAS 81
TUBING_PRESS 550
Perforation Data:
Interval Top:6286 ft.# Of Holes:2601
Interval Bottom:16059 ft.Hole Size:0.375 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)4904
Total Gas Produced (MCF)5483
GOR1118
GOR DeterminationBOE
Average BOE per Day15.952
Average MCFE per Day92.556

 Federal Financial Assurance  i 

 Tribal Well  i No