Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-41431
Well Classification: OW Status: PR - 5/17/2016
Well Name/No:VIPER PYRO STATE #16N2-10HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/17/2016
FacilityID:441550LocationID:332560
County:WELD #123Location:NWNW 15 3N67W 6
Field:WATTENBERG - #90750Elevation:4794 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:680FNL  265 FWLLat/Long: 40.231074 / -104.885298Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.231075 / -104.885305Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/2/2016
End Date: 4/7/2016
Reported: 5/25/2016
Days to report: 48
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 5/17/2016             Measured TD: 12674 ft.    Vertical TD: 6997 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 5/17/2016
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:4/16/2017
Proposed Top PZ Location:Sec:10 Twp: 3N 67W Footage: 263 FSL  89 FWL
Bottom Hole Location:Sec:10 Twp: 3N 67W Footage: 275 FSL  1 FEL
Proposed Depth/Form:12523 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 480, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 744 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 290, Top: 0 ft., Bottom: 744 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7398 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 810, Top: 0 ft., Bottom: 7398 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6401 ft., Depth: 12523 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 6501 ft., Bottom: 12523 ft.

Wellbore Completed
Completion Date:7/26/2015
Spud Date:6/3/2015Spud Date Is:ACTUAL
Measured TD:12674 ft.Measured PB depth:12656 ft.
True Vertical TD:6997 ft.True Vertical PB depth:6997 ft.
Top PZ Location:Sec:10 Twp: 3N 67WFootage: 239 FSL  143 FWL
Bottom Hole Location:Sec:10 Twp: 3N 67WFootage: 278 FSL  10 FEL
Log Types:CBL, MWD, (CNL in 123-41653, IND in 123-25002, 123-16861)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 73 ft., Weight: 42.1 , Citings Type: ACTUAL
Cement:Sacks: 52, Top: 0 ft., Bottom: 73 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1910 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 767, Top: 0 ft., Bottom: 1910 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12659 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1800, Top: 0 ft., Bottom: 12659 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4116 ft.
SHARON SPRINGS7050 ft.
NIOBRARA7135 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 5/17/2016                 Interval Top: 7599 ft.    Interval Bottom: 12634 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/30/2016Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/2/2016Treatment End Date:4/7/2016
Treatment Summary:"PERF AND FRAC FROM 7599-12,634. 269 BBL 7.5% HCL ACID, 100,247 BBL SLICKWATER, 3,694 BBL TREATED WATER, - 104,210 BBL TOTAL FLUID 450,850# 100 MESH OTTAWA/ST. PETERS, 2,417,500# 40/70 OTTAWA/ST. PETERS, - 2,868,350# TOTAL SAND."
Total fluid used in treatment (bbls):104210Max pressure during treatment (psi):7963
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:25
Total acid used in treatment (bbls):269Min frac gradient (psi/ft):0.93
Recycled water used in treatment (bbls):1950Total flowback volume recovered (bbls):6049
Fresh water used in treatment (bbls):101991Disposition method For flowback:RECYCLE
Total proppant used (lbs):2868350Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7191 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/17/2016Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 178
BBLS_OIL 258
BTU_GAS 1350
CALC_BBLS_H2O 178
CALC_BBLS_OIL 258
CALC_GOR 1112
CALC_MCF_GAS 287
CASING_PRESS 2575
GRAVITY_OIL 51
MCF_GAS 287
TUBING_PRESS 2075
Perforation Data:
Interval Top:7599 ft.# Of Holes:600
Interval Bottom:12634 ft.Hole Size:0.46 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)1645
Total Gas Produced (MCF)41195
GOR25042
GOR DeterminationMCFE
Average BOE per Day23.999
Average MCFE per Day139.202

 Federal Financial Assurance  i 

 Tribal Well  i No