|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 3/1/2025 Measured TD: 13254 ft. Vertical TD: 6975 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 3/1/2025 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 3/29/2017 | Proposed Top PZ Location: | Sec:15 Twp: 3N 67W | Footage: 2208 FSL 566 FWL | Bottom Hole Location: | Sec:16 Twp: 3N 67W | Footage: 2096 FSL 90 FWL | Proposed Depth/Form: | 12713 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 480, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 761 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 300, Top: 0 ft., Bottom: 761 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7424 ft., Weight: 26 , Citings Type: PLANNED | Cement: | Sacks: 810, Top: 0 ft., Bottom: 7424 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6424 ft., Depth: 13053 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 430, Top: 6524 ft., Bottom: 13053 ft. |
| | |
Wellbore Completed | Completion Date: | 9/29/2015 | Spud Date: | 5/29/2015 | Spud Date Is: | ACTUAL | Measured TD: | 13254 ft. | Measured PB depth: | 13148 ft. | True Vertical TD: | 6975 ft. | True Vertical PB depth: | 6973 ft. | Top PZ Location: | Sec:15 Twp: 3N 67W | Footage: 2217 FSL 713 FWL | Bottom Hole Location: | Sec:16 Twp: 3N 67W | Footage: 2071 FSL 91 FWL | Log Types: | CBL, MWD, (IND in 123-17927, 123-25001) | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 73 ft., Weight: 42.1 , Citings Type: ACTUAL | Cement: | Sacks: 48, Top: 0 ft., Bottom: 73 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1645 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 665, Top: 0 ft., Bottom: 1645 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 13240 ft., Weight: 17 , Citings Type: ACTUAL | Cement: | Sacks: 1870, Top: 0 ft., Bottom: 13240 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4125 ft. | | | | SHARON SPRINGS | 6916 ft. | | | | NIOBRARA | 6988 ft. | | | |
Formation NBRR Formation Classification: OW Status: PR - 3/1/2025 Interval Top: 7475 ft. Interval Bottom: 13138 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 6/1/2016 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 5/23/2016 | Treatment End Date: | 5/28/2016 | Treatment Summary: | "PERF AND FRAC FROM 7475-13,138.
48 BBL 7.5% HCL ACID, 115,312 BBL SLICKWATER, 6,867 BBL WATER, - 122,227 BBL TOTAL FLUID
515,350# 100 MESH OTTAWA/ST. PETERS, 3,281,308# 40/70 OTTAWA/ST. PETERS, - 3,796,657# TOTAL SAND."
| Total fluid used in treatment (bbls): | 122227 | Max pressure during treatment (psi): | 7743 | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | Type Of gas: | | Number Of staged intervals: | 28 | Total acid used in treatment (bbls): | 48 | Min frac gradient (psi/ft): | 0.96 | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 2008 | Fresh water used in treatment (bbls): | 122179 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 3796657 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 6/11/2016 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 179 | BBLS_OIL | 229 | BTU_GAS | 1358 | CALC_BBLS_H2O | 179 | CALC_BBLS_OIL | 229 | CALC_GOR | 2231 | CALC_MCF_GAS | 511 | CASING_PRESS | 1500 | GRAVITY_OIL | 51 | MCF_GAS | 511 |
| Perforation Data: | Interval Top: | 7475 ft. | # Of Holes: | 672 | Interval Bottom: | 13138 ft. | Hole Size: | 0.46 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 700 |
Total Gas Produced (MCF) | 16985 |
GOR | 24264 |
GOR Determination | MCFE |
Average BOE per Day | 9.898 |
Average MCFE per Day | 57.395 |
Federal Financial Assurance | i | |
|
|