Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-41334
Well Classification: OW Status: PR - 3/1/2022
Well Name/No:MAVERICK STATE #4N-A16HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/1/2022
FacilityID:441317LocationID:329096
County:WELD #123Location:NWNW 15 3N67W 6
Field:WATTENBERG - #90750Elevation:4811 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1200FNL  760 FWLLat/Long: 40.229623 / -104.883514Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.229623 / -104.883514Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/28/2016
End Date: 5/7/2016
Reported: 6/20/2016
Days to report: 44
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 3/1/2022             Measured TD: 13249 ft.    Vertical TD: 6983 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 3/1/2022
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/27/2017
Proposed Top PZ Location:Sec:15 Twp: 3N 67W Footage: 900 FNL  836 FWL
Bottom Hole Location:Sec:16 Twp: 3N 67W Footage: 891 FNL  50 FWL
Proposed Depth/Form:13345 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 480, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1614 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 630, Top: 0 ft., Bottom: 1614 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 13209 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1369, Top: 0 ft., Bottom: 13209 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6485 ft., Depth: 13345 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 450, Top: 6585 ft., Bottom: 13345 ft.

Wellbore Completed
Completion Date:8/15/2015
Spud Date:6/24/2015Spud Date Is:ACTUAL
Measured TD:13249 ft.Measured PB depth:13131 ft.
True Vertical TD:6983 ft.True Vertical PB depth:6981 ft.
Top PZ Location:Sec:15 Twp: 3N 67WFootage: 900 FNL  836 FWL
Bottom Hole Location:Sec:16 Twp: 3N 67WFootage: 891 FNL  50 FWL
Log Types:CBL, MWD, (IND in 123-17927, 123-25001, 123-25002, 123-16861)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 69 ft., Weight: 42.1 , Citings Type: ACTUAL
Cement:Sacks: 52, Top: 0 ft., Bottom: 69 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1852 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 747, Top: 0 ft., Bottom: 1852 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 13224 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1490, Top: 28 ft., Bottom: 13224 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4046 ft.
SHARON SPRINGS6936 ft.
NIOBRARA7109 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 3/1/2022                  Interval Top: 7330 ft.    Interval Bottom: 13121 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:5/19/2016Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/28/2016Treatment End Date:5/7/2016
Treatment Summary:"PERF AND FRAC FROM 7330-13,121 181 BBL 7.5% HCL ACID, 119,849 BBL SLICKWATER, 5,685 BBL WATER, - 125,715 BBL TOTAL FLUID 491,561# 100 MESH, 3,225,406# 40/70 PREMIUM, - 3,716,966# TOTAL SAND."
Total fluid used in treatment (bbls):125715Max pressure during treatment (psi):7924
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:29
Total acid used in treatment (bbls):181Min frac gradient (psi/ft):0.97
Recycled water used in treatment (bbls):3385Total flowback volume recovered (bbls):1647
Fresh water used in treatment (bbls):122149Disposition method For flowback:RECYCLE
Total proppant used (lbs):3716967Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/31/2016Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 878
BBLS_OIL 113
BTU_GAS 1377
CALC_BBLS_H2O 878
CALC_BBLS_OIL 113
CALC_GOR 2097
CALC_MCF_GAS 237
CASING_PRESS 2000
GRAVITY_OIL 52
MCF_GAS 237
Perforation Data:
Interval Top:7330 ft.# Of Holes:696
Interval Bottom:13121 ft.Hole Size:0.46 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)956
Total Gas Produced (MCF)35290
GOR36914
GOR DeterminationMCFE
Average BOE per Day19.316
Average MCFE per Day112.013

 Federal Financial Assurance  i 

 Tribal Well  i No