|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 12/1/2020 Measured TD: 11954 ft. Vertical TD: 7113 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 12/1/2020 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 3/26/2017 | Proposed Top PZ Location: | Sec:9 Twp: 1N 65W | Footage: 460 FSL 708 FEL | Bottom Hole Location: | Sec:9 Twp: 1N 65W | Footage: 460 FNL 752 FEL | Proposed Depth/Form: | 11781 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1514 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 570, Top: 0 ft., Bottom: 1514 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 11781 ft., Weight: 17 , Citings Type: PLANNED | Cement: | Sacks: 1518, Top: 1400 ft., Bottom: 11781 ft. |
| | |
Wellbore Completed | Completion Date: | 7/23/2015 | Spud Date: | 6/14/2015 | Spud Date Is: | ACTUAL | Measured TD: | 11954 ft. | Measured PB depth: | 11852 ft. | True Vertical TD: | 7113 ft. | True Vertical PB depth: | 7112 ft. | Top PZ Location: | Sec:9 Twp: 1N 65W | Footage: 540 FSL 721 FEL | Bottom Hole Location: | Sec:9 Twp: 1N 65W | Footage: 482 N 741 E | Log Types: | CBL, GR; CNL/CLL in API 123-41330 | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 65 ft., Weight: 42.1 , Citings Type: ACTUAL | Cement: | Sacks: 32, Top: 0 ft., Bottom: 65 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1833 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 712, Top: 0 ft., Bottom: 1833 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 11944 ft., Weight: 17 , Citings Type: ACTUAL | Cement: | Sacks: 1700, Top: 48 ft., Bottom: 11944 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4473 ft. | | | | SHARON SPRINGS | 7225 ft. | | | | NIOBRARA | 7273 ft. | | | |
Formation NBRR Formation Classification: OW Status: SI - 12/1/2020 Interval Top: 7669 ft. Interval Bottom: 11843 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 2/21/2016 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 1/12/2016 | Treatment End Date: | 1/17/2016 | Treatment Summary: | "PERF AND FRAC FROM 7669-11,843.
500 BBL 7.5% HCL ACID, 150,021 BBL SLICKWATER, 2,948 BBL WATER, - 153,468 BBL TOTAL FLUID
4,581,950# 40/70 OTTAWA/ST. PETERS, - 4,581,950# TOTAL SAND."
| Total fluid used in treatment (bbls): | 153468 | Max pressure during treatment (psi): | 7640 | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | Type Of gas: | | Number Of staged intervals: | 21 | Total acid used in treatment (bbls): | 500 | Min frac gradient (psi/ft): | 0.95 | Recycled water used in treatment (bbls): | 2005 | Total flowback volume recovered (bbls): | 27805 | Fresh water used in treatment (bbls): | 150963 | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 4581950 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 3/8/2016 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 471 | BBLS_OIL | 108 | BTU_GAS | 1333 | CALC_BBLS_H2O | 471 | CALC_BBLS_OIL | 108 | CALC_GOR | 731 | CALC_MCF_GAS | 79 | CASING_PRESS | 1350 | GRAVITY_OIL | 50 | MCF_GAS | 79 |
| Perforation Data: | Interval Top: | 7669 ft. | # Of Holes: | 504 | Interval Bottom: | 11843 ft. | Hole Size: | 0.46 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2028 |
Inactive Exception | N | |
Noticed Inactive | Y | Noticed Date 12/15/2022 |
Defined Inactive (SI ) | Y | Defined Inactive 11/30/2020 |
Low Producing | Y | Production Period 12/2023 - 11/2024 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|