Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-41139
Well Classification: OW Status: PR - 8/1/2024
Well Name/No:GP JACKSON FED #17W-25-4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/1/2024
FacilityID:440831LocationID:332837
Municipality/County:GREELEY / WELD #123Location:NENE 20 5N65W 6
Field:DJ HORIZONTAL NIOBRARA - #16950Elevation:4674 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:513FNL  1305 FELLat/Long: 40.390450 / -104.682510Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.390451 / -104.682506Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/1/2021
End Date: 1/15/2021
Reported: 3/1/2021
Days to report: 45
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 8/1/2024             Measured TD: 21600 ft.    Vertical TD: 6936 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 8/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/14/2021
Proposed Top PZ Location:Sec:17 Twp: 5N 65W Footage: 1769 FSL  1588 FEL
Bottom Hole Location:Sec:13 Twp: 5N 66W Footage: 1784 FSL  460 FWL
Proposed Depth/Form:21630 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 960, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 21646 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2935, Top: , Bottom: 21646 ft.
Casing:String Type: 2ND, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 17512 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 1652, Top: 1500 ft., Bottom: 17512 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 8956 ft., Depth: 13502 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:3/22/2020
Spud Date:12/21/2019Spud Date Is:ACTUAL
Measured TD:21600 ft.Measured PB depth:21596 ft.
True Vertical TD:6936 ft.True Vertical PB depth:6936 ft.
Top PZ Location:Sec:17 Twp: 5N 65WFootage: 1769 FSL  1588 FEL
Bottom Hole Location:Sec:13 Twp: 5N 66WFootage: 1784 FSL  460 FWL
Log Types:CBL, Mud Log, MWD/LWD, (Dual Induction on 123-24990).
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1605 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 590, Top: 0 ft., Bottom: 1605 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 21596 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 3368, Top: 2420 ft., Bottom: 21600 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3846 ft.NN
SUSSEX4276 ft.NN
SHANNON5042 ft.NN
SHARON SPRINGS7314 ft.NN
NIOBRARA7343 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 8/1/2024                  Interval Top: 7734 ft.    Interval Bottom: 21528 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/2/2021Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:1/1/2021Treatment End Date:1/15/2021
Treatment Summary:Frac'd Niobrara with 69 stage plug and perf; 177824 total bbls fluid pumped: 144626 bbls gelled fluid, 33047 bbls fresh water, and 151 bbls 28% HCl acid; 13800480 total lbs proppant pumped: 6900500 lbs 40/70 mesh and 6899980 lbs 30/50 mesh.
Total fluid used in treatment (bbls):177824Max pressure during treatment (psi):8917
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:69
Total acid used in treatment (bbls):151Min frac gradient (psi/ft):0.96
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):23042
Fresh water used in treatment (bbls):33047Disposition method For flowback:DISPOSAL
Total proppant used (lbs):13800480Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7612 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/15/2021Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 323
BBLS_OIL 651
BTU_GAS 1297
CALC_BBLS_H2O 323
CALC_BBLS_OIL 651
CALC_GOR 5820
CALC_MCF_GAS 3789
CASING_PRESS 2760
GRAVITY_OIL 55
MCF_GAS 3789
TUBING_PRESS 2217
Perforation Data:
Interval Top:7734 ft.# Of Holes:2041
Interval Bottom:21528 ft.Hole Size:0.4 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)15108
Total Gas Produced (MCF)224491
GOR14859
GOR DeterminationBOE
Average BOE per Day147.492
Average MCFE per Day855.446

 Federal Financial Assurance  i 

 Tribal Well  i No