Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-41109
Well Classification: OW Status: PR - 8/31/2016
Well Name/No:Arellano #P-10-9HN
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/31/2016
FacilityID:440764LocationID:440761
County:WELD #123Location:NESE 10 5N65W 6
Field:WATTENBERG - #90750Elevation:4616 ft.
Planned Location:1550FSL  314 FELLat/Long: 40.410850 / -104.641152Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.410852 / -104.641151Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/3/2016
End Date: 2/24/2016
Reported: 4/18/2016
Days to report: 54
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 12/1/2018             Measured TD: 13958 ft.    Vertical TD: 6859 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 12/1/2018
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:2/2/2017
Prop Depth/Form:13916 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 480, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 750 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 333, Top: 0 ft., Bottom: 750 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7250 ft., Weight: 29 , Citings Type: PLANNED
Cement:Sacks: 569, Top: 0 ft., Bottom: 7250 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6550 ft., Depth: 13916 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: 565, Top: 6550 ft., Bottom: 13916 ft.

Wellbore Completed
Completion Date:6/14/2015
Spud Date:3/30/2015Spud Date Is:ACTUAL
Measured TD:13958 ft.Measured PB depth:13958 ft.
True Vertical TD:6859 ft.True Vertical PB depth:6859 ft.
Top PZ Location:Sec:10 Twp: 5N 65WFootage: 1162 FSL  811 FELDepth
Bottom Hole Location:Sec:9 Twp: 5N 65WFootage: 1155 FSL  2169 FELDepth
Log Types:MWD, Mud, CBL
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 43 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 790 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 0 ft., Bottom: 790 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7290 ft., Weight: 29 , Citings Type: ACTUAL
Cement:Sacks: 675, Top: 30 ft., Bottom: 7290 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6754 ft., Depth: 13954 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PARKMAN3625 ft.NN
SUSSEX4400 ft.4503 ft.NN
SHARON SPRINGS6634 ft.NN
NIOBRARA6718 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 12/1/2018                 Interval Top: 7371 ft.    Interval Bottom: 13958 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:5/3/2016Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/3/2016Treatment End Date:2/24/2016
Treatment Summary:Frac 43 Stages (sleeves & swell packers) with 115,714 bbl Hybrid fluid (Slickwater & crosslink) and 7,628,742 lbs. sand
Total fluid used in treatment (bbls):115714Max pressure during treatment (psi):8310
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:43
Total acid used in treatment (bbls):28Min frac gradient (psi/ft):0.98
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):115686Disposition method For flowback:
Total proppant used (lbs):7628742Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/8/2016Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 338
BBLS_OIL 394
BTU_GAS 1295
CALC_BBLS_H2O 338
CALC_BBLS_OIL 394
CALC_GOR 3264
CALC_MCF_GAS 1286
CASING_PRESS 1900
GRAVITY_OIL 54
MCF_GAS 1286
Perforation Data:
Interval Top:7371 ft.# Of Holes:
Interval Bottom:13958 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)6907
Total Gas Produced (MCF)91494
GOR13246
GOR DeterminationBOE
Average BOE per Day61.990
Average MCFE per Day359.554

 Federal Financial Assurance  i 

 Tribal Well  i No