Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-40979
Well Classification: OW Status: PR - 11/30/2015
Well Name/No:MILK STATE #29C-21HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/30/2015
FacilityID:159616LocationID:417881
County:WELD #123Location:SESW 21 3N65W 6
Field:WATTENBERG - #90750Elevation:4838 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:475FSL  1831 FWLLat/Long: 40.204996 / -104.671341Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.204997 / -104.671342Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/30/2015
End Date: 11/4/2015
Reported: 12/18/2015
Days to report: 44
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 11/30/2015             Measured TD: 12750 ft.    Vertical TD: 7147 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 11/30/2015
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:1/14/2017
Proposed Top PZ Location:Sec:21 Twp: 3N 65W Footage: 60 FSL  1510 FWL
Bottom Hole Location:Sec:21 Twp: 3N 65W Footage: 50 FNL  1447 FWL
Proposed Depth/Form:12806 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 480, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1126 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 430, Top: 0 ft., Bottom: 1126 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7650 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 810, Top: 0 ft., Bottom: 7650 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6653 ft., Depth: 12806 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:6/2/2015
Spud Date:2/16/2015Spud Date Is:ACTUAL
Measured TD:12750 ft.Measured PB depth:12700 ft.
True Vertical TD:7147 ft.True Vertical PB depth:7150 ft.
Top PZ Location:Sec:21 Twp: 3N 65WFootage: 64 FSL  1520 FWL
Bottom Hole Location:Sec:21 Twp: 3N 65WFootage: 50 FNL  1428 FWL
Log Types:CBL, MWD/GR, (IND in 05-123-12549, 05-123-31769, 05-123-16054)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42.1 , Citings Type: ACTUAL
Cement:Sacks: 73, Top: 0 ft., Bottom: 40 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1220 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 495, Top: 0 ft., Bottom: 1220 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7588 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 670, Top: 130 ft., Bottom: 7588 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6663 ft., Depth: 12748 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 410, Top: 6663 ft., Bottom: 12748 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SUSSEX4370 ft.
SHARON SPRINGS7050 ft.
NIOBRARA7136 ft.
FORT HAYS7620 ft.
CODELL11023 ft.

Formation NBFHC                   Formation Classification:  OW                   Status:  PR - 11/30/2015                Interval Top: 7598 ft.    Interval Bottom: 12683 ft.

 Completed Information for Formation NIOBRARA-FT HAYS-CODELL
1st Production Date:11/21/2015Choke Size: 
Formation Name:NIOBRARA-FT HAYS-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/30/2015Treatment End Date:11/4/2015
Treatment Summary:PERF AND FRAC FROM 7598-12683. 226 BBL ACID, 81,084 BBL SLICKWATER, 2,081 BBL TREATED WATER, - 83,391 BBL TOTAL FLUID 327,250# 100 MESH OTTOWA, 2,111,500# 40/70 OTTOWA, - 2,438,750# TOTAL SAND. ENTERED: NIOBRARA 7598—7620, 8107-8905, 11240-11256, 12436-12683; FT. HAYS 7620-8107, 8905-11022, 11256-12436; CODELL 11022-11240; THIS IS A DESIGNATED SOURCE OF SUPPLY WELL (SEE ATTACHMENT)
Total fluid used in treatment (bbls):83391Max pressure during treatment (psi):7170
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:17
Total acid used in treatment (bbls):226Min frac gradient (psi/ft):0.87
Recycled water used in treatment (bbls):1270Total flowback volume recovered (bbls):464
Fresh water used in treatment (bbls):81895Disposition method For flowback:RECYCLE
Total proppant used (lbs):2438750Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/30/2015Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 116
BBLS_OIL 76
BTU_GAS 1277
CALC_BBLS_H2O 116
CALC_BBLS_OIL 76
CALC_GOR 5158
CALC_MCF_GAS 392
CASING_PRESS 1325
GRAVITY_OIL 50
MCF_GAS 392
Perforation Data:
Interval Top:7598 ft.# Of Holes:408
Interval Bottom:12683 ft.Hole Size:0.46 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)2183
Total Gas Produced (MCF)42515
GOR19475
GOR DeterminationMCFE
Average BOE per Day26.066
Average MCFE per Day151.170

 Federal Financial Assurance  i 

 Tribal Well  i No