Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-40957
Well Classification: OW Status: PR - 1/18/2016
Well Name/No:CHEESE #38C-28HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/18/2016
FacilityID:159582LocationID:302872
County:WELD #123Location:NENE 28 3N65W 6
Field:WATTENBERG - #90750Elevation:4816 ft.
Planned Location:429FNL  770 FELLat/Long: 40.202511 / -104.662017Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.202513 / -104.662010Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/30/2015
End Date: 1/2/2016
Reported: 2/25/2016
Days to report: 54
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 1/18/2016             Measured TD: 12863 ft.    Vertical TD: 7164 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 1/18/2016
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:1/8/2017
Proposed Top PZ Location:Sec:21 Twp: 3N 65W Footage: 7 FSL  131 FEL
Bottom Hole Location:Sec:28 Twp: 3N 65W Footage: 52 FSL  122 FEL
Proposed Depth/Form:12797 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 480, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1114 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 420, Top: 0 ft., Bottom: 1114 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7609 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 800, Top: 0 ft., Bottom: 7609 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6612 ft., Depth: 12797 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:6/13/2015
Spud Date:3/12/2015Spud Date Is:ACTUAL
Measured TD:12863 ft.Measured PB depth:12769 ft.
True Vertical TD:7164 ft.True Vertical PB depth:7164 ft.
Top PZ Location:Sec:21 Twp: 3N 65WFootage: 7 FSL  131 FEL
Bottom Hole Location:Sec:28 Twp: 3N 65WFootage: 52 FSL  122 FEL
Log Types:CBL, GR
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 60 ft., Weight: 42.1 , Citings Type: ACTUAL
Cement:Sacks: 48, Top: 0 ft., Bottom: 60 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1177 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 483, Top: 0 ft., Bottom: 1177 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12854 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1800, Top: 770 ft., Bottom: 12854 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4274 ft.
SHARON SPRINGS6964 ft.
NIOBRARA7033 ft.
FORT HAYS7478 ft.
CODELL7621 ft.
CARLILE12820 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 12/8/2016                 Interval Top: 7939 ft.    Interval Bottom: 12307 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:12/8/2016Treatment End Date:N/A
Treatment Summary:NIOBRARA 7939-8290; 12,260-12,307;
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7939 ft.# Of Holes:404
Interval Bottom:12307 ft.Hole Size:0.46 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 12/8/2016                 Interval Top: 7706 ft.    Interval Bottom: 12528 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:12/8/2016Treatment End Date:N/A
Treatment Summary:FT HAYS 7706-7939; 8423-8486; 12,093-12,260; 12,307-12,450; 12,513-12,528;
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:7706 ft.# Of Holes:404
Interval Bottom:12528 ft.Hole Size:0.46 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 12/8/2016                 Interval Top: 7680 ft.    Interval Bottom: 12735 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:12/8/2016Treatment End Date:N/A
Treatment Summary:CODELL 7680-7706; 8290-8423; 8486-12,093; 12,450-12,513; 12,528-12,735
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7680 ft.# Of Holes:404
Interval Bottom:12735 ft.Hole Size:0.46 in.

Formation NBFHC                   Formation Classification:  OW                   Status:  PR - 1/18/2016                 Interval Top: 7680 ft.    Interval Bottom: 12735 ft.

 Completed Information for Formation NIOBRARA-FT HAYS-CODELL
1st Production Date:1/6/2016Choke Size: 
Formation Name:NIOBRARA-FT HAYS-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/30/2015Treatment End Date:1/2/2016
Treatment Summary:PERF AND FRAC FROM 7680-12,735. 119 BBL 7.5% HCL ACID, 77,930 BBL SLICKWATER, 3,487 BBL WATER, 81,537 BBL TOTAL FLUID 306,030# 100 MESH OTTAWA/ST. PETERS, 2,088,580# 40/70 OTTAWA/ST. PETERS, - 2,394,610# TOTAL SAND.
Total fluid used in treatment (bbls):81537Max pressure during treatment (psi):7083
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:17
Total acid used in treatment (bbls):119Min frac gradient (psi/ft):0.86
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):1587
Fresh water used in treatment (bbls):81418Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2394610Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/18/2016Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 133
BBLS_OIL 98
BTU_GAS 1340
CALC_BBLS_H2O 133
CALC_BBLS_OIL 98
CALC_GOR 5377
CALC_MCF_GAS 527
CASING_PRESS 1690
GRAVITY_OIL 56
MCF_GAS 527
Perforation Data:
Interval Top:7680 ft.# Of Holes:404
Interval Bottom:12735 ft.Hole Size:0.46 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2024 - January 2025i
Total Oil Produced (Barrels)1859
Total Gas Produced (MCF)42557
GOR22892
GOR DeterminationMCFE
Average BOE per Day25.179
Average MCFE per Day146.033

 Federal Financial Assurance  i 

 Tribal Well  i No