|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 9/1/2025 Measured TD: 14481 ft. Vertical TD: 7388 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 9/1/2025 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 7/25/2019 | | Proposed Top PZ Location: | Sec:25 Twp: 2N 68W | Footage: 692 FSL 28 FWL | | Bottom Hole Location: | Sec:24 Twp: 2N 68W | Footage: 2178 FSL 32 FWL | | Proposed Depth/Form: | 14558 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 480, Drill Unit: GWA | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED | | Cement: | Sacks: 80, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2069 ft., Weight: 40 , Citings Type: PLANNED | | Cement: | Sacks: 878, Top: 0 ft., Bottom: 2069 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 14558 ft., Weight: 20 , Citings Type: PLANNED | | Cement: | Sacks: 2317, Top: 0 ft., Bottom: 14558 ft. | | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 14595 ft., Weight: 13.5 , Citings Type: PLANNED | | Cement: | Sacks: 401, Top: 7474 ft., Bottom: 14595 ft. |
| | |
| Wellbore Completed | | Completion Date: | 12/3/2017 | | Spud Date: | 9/3/2017 | Spud Date Is: | ACTUAL | | Measured TD: | 14481 ft. | Measured PB depth: | 14430 ft. | | True Vertical TD: | 7388 ft. | True Vertical PB depth: | 7388 ft. | | Top PZ Location: | Sec:25 Twp: 2N 68W | Footage: 692 FSL 28 FWL | | Bottom Hole Location: | Sec:24 Twp: 2N 68W | Footage: 2178 FSL 32 FWL | | Log Types: | Mud, MWD/LWD, CBL, (Pulsed Neutron in 123-40939) | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 121 ft., Weight: 52.78 , Citings Type: ACTUAL | | Cement: | Sacks: 114, Top: 0 ft., Bottom: 121 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2078 ft., Weight: 40 , Citings Type: ACTUAL | | Cement: | Sacks: 776, Top: 0 ft., Bottom: 2078 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 14468 ft., Weight: 20 , Citings Type: ACTUAL | | Cement: | Sacks: 2224, Top: 2080 ft., Bottom: 14481 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4483 ft. | | | | | SHANNON | 5038 ft. | | | | | TEEPEE BUTTES | 6492 ft. | | | | | SHARON SPRINGS | 7443 ft. | | | | | NIOBRARA | 7645 ft. | | | |
Formation NBRR Formation Classification: OW Status: PR - 9/1/2025 Interval Top: 7667 ft. Interval Bottom: 14416 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 7/26/2018 | Choke Size: | 20.000 in. | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 5/9/2018 | Treatment End Date: | 5/19/2018 | | Treatment Summary: | 249752 bbl water, 233 bbl additives (FRP-4K, ACI-97 and ASF-67) and 36 bbl HCL-15 in a 36 stage frac with 5,915,530 lb of silica quartz proppant | | Total fluid used in treatment (bbls): | 250021 | Max pressure during treatment (psi): | 8920 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.33 | | Type Of gas: | | Number Of staged intervals: | 36 | | Total acid used in treatment (bbls): | 36 | Min frac gradient (psi/ft): | 0.89 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 24221 | | Fresh water used in treatment (bbls): | 249985 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 5915530 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7501 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/26/2018 | Test Method: | flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 705 | | BBLS_OIL | 750 | | BTU_GAS | 1321 | | CALC_BBLS_H2O | 705 | | CALC_BBLS_OIL | 750 | | CALC_GOR | 1491 | | CALC_MCF_GAS | 1118 | | CASING_PRESS | 2200 | | GRAVITY_OIL | 45 | | MCF_GAS | 1118 | | TUBING_PRESS | 1646 |
| | Perforation Data: | | Interval Top: | 7667 ft. | # Of Holes: | 858 | | Interval Bottom: | 14416 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 2878 |
| Total Gas Produced (MCF) | 24405 |
| GOR | 8479 |
| GOR Determination | BOE |
| Average BOE per Day | 19.344 |
| Average MCFE per Day | 112.191 |
| Federal Financial Assurance | i | |
|
|