Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-40926
Well Classification: OW Status: PR - 7/1/2020
Well Name/No:Colt #A13-625
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/1/2020
FacilityID:440572LocationID:306258
County:WELD #123Location:SWSW 17 6N63W 6
Field:WATTENBERG - #90750Elevation:4665 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1015FSL  424 FWLLat/Long: 40.482050 / -104.468800Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.482050 / -104.468800Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/4/2015
End Date: 7/11/2015
Reported: 7/28/2016
Originally Reported: 7/28/2015
Days to report: 383
Days to report: 17
Disclosure: Sidetrack #00
Start Date: 8/1/2015
End Date: 8/4/2015
Reported: 6/1/2016
Originally Reported: 8/5/2015
Days to report: 302
Days to report: 1
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 7/1/2020             Measured TD: 16200 ft.    Vertical TD: 6661 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 7/1/2020
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:12/22/2016
Proposed Top PZ Location:Sec:18 Twp: 6N 63W Footage: 954 FSL  626 FEL
Bottom Hole Location:Sec:13 Twp: 6N 64W Footage: 925 FSL  535 FWL
Proposed Depth/Form:16222 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 640, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 0 , Citings Type: PLANNED
Cement:Sacks: 6, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 850 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 850 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6957 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 470, Top: , Bottom: 6957 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6807 ft., Depth: 16222 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:3/13/2015
Spud Date:3/7/2015Spud Date Is:ACTUAL
Measured TD:16200 ft.Measured PB depth:16183 ft.
True Vertical TD:6661 ft.True Vertical PB depth:6661 ft.
Top PZ Location:Sec:18 Twp: 6N 63WFootage: 989 FSL  860 FEL
Bottom Hole Location:Sec:13 Twp: 6N 64WFootage: 920 FSL  536 FWL
Log Types:CBl, MWD/LWD
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 124 ft., Weight: 42.5 , Citings Type: ACTUAL
Cement:Sacks: 80, Top: 0 ft., Bottom: 124 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 906 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 371, Top: 0 ft., Bottom: 906 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6983 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 577, Top: 480 ft., Bottom: 6983 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6881 ft., Depth: 16185 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PIERRE911 ft.
PARKMAN3573 ft.
SUSSEX4087 ft.
SHANNON4948 ft.
NIOBRARA6691 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 7/1/2020                  Interval Top: 7165 ft.    Interval Bottom: 16074 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/8/2015Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/4/2015Treatment End Date:7/8/2015
Treatment Summary:Frac'd the Niobrara w/ 10180272 gals of 28# Silverstim and Slick Water with 8206021#'s of Ottawa sand.
Total fluid used in treatment (bbls):242387Max pressure during treatment (psi):6834
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:38
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.99
Recycled water used in treatment (bbls):79296Total flowback volume recovered (bbls):463
Fresh water used in treatment (bbls):163090Disposition method For flowback:RECYCLE
Total proppant used (lbs):8206021Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6985 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/23/2015Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 673
BBLS_OIL 448
BTU_GAS 1362
CALC_BBLS_H2O 673
CALC_BBLS_OIL 448
CALC_GOR 1191
CALC_MCF_GAS 534
CASING_PRESS 22
GRAVITY_OIL 42
MCF_GAS 534
TUBING_PRESS 1074
Perforation Data:
Interval Top:7165 ft.# Of Holes:0
Interval Bottom:16074 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)3365
Total Gas Produced (MCF)84669
GOR25161
GOR DeterminationMCFE
Average BOE per Day49.265
Average MCFE per Day285.734

 Federal Financial Assurance  i 

 Tribal Well  i No