|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 7/1/2020 Measured TD: 11705 ft. Vertical TD: 6646 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 7/1/2020 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 12/22/2016 | | Proposed Top PZ Location: | Sec:17 Twp: 6N 63W | Footage: 2306 FSL 775 FWL | | Bottom Hole Location: | Sec:16 Twp: 6N 63W | Footage: 2310 FSL 50 FWL | | Proposed Depth/Form: | 11668 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 400, Drill Unit: GWA | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 0 , Citings Type: PLANNED | | Cement: | Sacks: 6, Top: 0 ft., Bottom: 100 ft. | | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 850 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 400, Top: 0 ft., Bottom: 850 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7078 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 480, Top: , Bottom: 7078 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6928 ft., Depth: 11668 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 4/1/2015 | | Spud Date: | 3/27/2015 | Spud Date Is: | ACTUAL | | Measured TD: | 11705 ft. | Measured PB depth: | 11693 ft. | | True Vertical TD: | 6646 ft. | True Vertical PB depth: | 6646 ft. | | Top PZ Location: | Sec:17 Twp: 6N 63W | Footage: 2306 FSL 775 FWL | | Bottom Hole Location: | Sec:16 Twp: 6N 63W | Footage: 2369 FSL 47 FWL | | Log Types: | CBL, MWD/LWD | | Casing: | String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 16 in., Top: 0 ft., Depth: 126 ft., Weight: 75 , Citings Type: ACTUAL | | Cement: | Sacks: 80, Top: 0 ft., Bottom: 126 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 928 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 365, Top: 0 ft., Bottom: 928 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7077 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 593, Top: 625 ft., Bottom: 7077 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6967 ft., Depth: 11695 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PIERRE | 366 ft. | | | | | PARKMAN | 3533 ft. | | | | | SUSSEX | 4096 ft. | | | | | SHANNON | 4867 ft. | | | | | NIOBRARA | 6783 ft. | | | |
Formation NBRR Formation Classification: OW Status: PR - 7/1/2020 Interval Top: 7210 ft. Interval Bottom: 11617 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 8/24/2015 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | Yes |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 8/11/2015 | Treatment End Date: | 8/15/2015 | | Treatment Summary: | Frac'd the Niobrara w/ 4549600 gals of Silvestim and Slick Water with 3159542#'s of Ottawa sand. | | Total fluid used in treatment (bbls): | 108323 | Max pressure during treatment (psi): | 6372 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 23 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.94 | | Recycled water used in treatment (bbls): | 3508 | Total flowback volume recovered (bbls): | 533 | | Fresh water used in treatment (bbls): | 104815 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 3159542 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6937 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/28/2015 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 674 | | BBLS_OIL | 328 | | BTU_GAS | 1364 | | CALC_BBLS_H2O | 674 | | CALC_BBLS_OIL | 328 | | CALC_GOR | 945 | | CALC_MCF_GAS | 310 | | CASING_PRESS | 1481 | | GRAVITY_OIL | 40 | | MCF_GAS | 310 | | TUBING_PRESS | 1049 |
| | Perforation Data: | | Interval Top: | 7210 ft. | # Of Holes: | 0 | | Interval Bottom: | 11617 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 3466 |
| Total Gas Produced (MCF) | 29201 |
| GOR | 8424 |
| GOR Determination | BOE |
| Average BOE per Day | 23.418 |
| Average MCFE per Day | 135.852 |
| Federal Financial Assurance | i | |
|
|